Reference no: EM13153496 
                                                                               
                                       
Question 
Linear Programming
Complete the linear programming matrix at the end of the question with the appropriate coefficients and signs for the following information
Labour  
| Requirements               steers         ewes        lambs       oats             turnips           barleys           millet            | 
| Winter   (hrs)              1.22           0.20        0.12       0.30          0.10           1.00              0.70 Spring   (hrs)               1.20           0.30        0.15       0.20          0.30           0.80              1.10 Summer   (hrs)            1.12           0.20        0.13       0.30          1.30           1.30              1.50 Autumn   (hrs)            1.14           0.40                      0.30         0.20           0.20              0.20   | 
 
| Feed   demand                                    steers                                ewes                                  lambs | 
| Winter (kg)                            900                              192                             36 Spring (kg)                             800                              190                             57 Summer (kg)                          830                              190                             95 Autumn (kg)                          790                              200 | 
 
| Feed supply                   oats                      turnips                   barley                     millet | 
| Winter (kg)                    840                       110                        460 Spring (kg)                                                 280                        580                         500 Summer (kg)                                               675                        175                         2700 Autumn (kg)                  470                      163 | 
 
| Gross   margins      steers         ewes        lambs        oats         turnips       barley          millet | 
| $                           74.05           23.20    54.32         -43.45      -48.36        -39.60          -36.74 | 
The manager has 800 hours of family labour available in summer, autumn and winter; however, in spring only 750 hours is available. In the district casual labour is worth $14 per hour.
  Tasks
1.Fill in the tableau with the values from the above information: be sure to include the correct signs, gross margins and supply values. You are not required to complete a demand column.
2.Complete the constraints for a 2-year crop rotation between oats and barley in the homestead paddock (300 ha).
3.Complete the constraint for turnip and millet production in the South Hill paddock (200ha).
4.Complete the constraint for a maximum of 40 steers.
5.Complete the constraint for a 75 per cent lambing ratio.
6.Complete the constraint for a minimum 200 head of sheep.
7.Show how a maximum of 5 tonnes of feed wheat could be made available in winter at $160 per tonne.