Complete an assembly design

Assignment Help Other Engineering
Reference no: EM131302078

Project

1) You must complete an assembly design. The design must incorporate mating parts, fasteners, and must utilize many of the Solidworks functions. You must also produce a drawing for each part that has proper and complete dimensioning and tolerancing, an assembly drawing and exploded drawing and other requirements (explained later in the quarter). Grading will be based on correct use of drafting conventions (proper view, dimensioning and tolerancing, etc.)

2) You have the freedom to design a fancy intricate part or assembly of your choice that utilizes the advanced features of the software. Part 2 will be graded on originality, complexity and the level of use of Solidworks for more advanced modeling functions.

You must model an interesting and relatively complicated assembly (however a VERY DETAILED single part may also be acceptable if approved beforehand). The requirement for the assembly is that it must have at least 7 distinct parts (and hopefully much more). This should be exceeded easily if the complexity of your project is adequate for the final project. An example we gave during the beginning of the quarter was the Buzz Lightyear toy. This had several parts (arms, legs, feet, hands etc.) and several components of the space suit. Work on your own project. You can do whatever you want. For example, like a car model or a robot.

1884_figure.jpg

You also need to do one simulation on your project. For most of you this will be a static structural analysis where you estimate a worst-case load on your design, apply that load using SolidWorks simulation and then report the maximum stresses and displacements resulting from that load.

You must show the use of some of the more advanced features of SolidWorks that you learned in this course. Other than that, you may do whatever you want, so have fun with it! Make sure to engrave your name somewhere on your assembly.

1. A short (60 second or less) video describing your project. This should be fast-paced and annotated with both narration and music. It should include unique techniques you used and challenges you had while creating the design. It should focus on all aspects of the grading criteria: originality, creativity, complexity, and the obvious use of SolidWorks modeling features. All drawings and SolidWorks renderings required to quickly describe your project in detail should be included. The project should also include one simulation - as discussed in class this will most likely be a linear static analysis. This video or a link to the video should be uploaded to the drop box on the course website.

2. A Four-View screen shot of the major parts showing the Feature Manager Tree. The image must be clear, and it should take up a full page in Landscape orientation. Make sure all features are clear and easy to see, and take screen shots of close-up views if necessary.

3. A Four-View screen shot of the assembly (full page) showing the Assembly Manager Tree.

4. Exploded view of the assembly and possible sub-assemblies. This does NOT have to be on a drawing with the BOM and balloons and such. Just create an exploded view in SolidWorks and take a screen shot, or multiple screen shots if you need to take close-up images to show more detail.
5. Written summary of your simulation including maximum displacement and stress and a few sentences discussing these results. 1-2 screen shots and a table of the results.

Items 2-5 should be combined in a single PDF file and submitted to the drop box on the course website.

You also need to write what you say in the short video in item 1. If you can, it is better to find a Chinese male voice of an Asian male voice speak in this video.

Reference no: EM131302078

Questions Cloud

Strategic management process-product differentiation : Find a news article (from reputable sources) that discusses "a firm/company that is pursuing both product differentiation and cost leadership". Provide a summary of the news item (along with a reference to where you found it) and clearly explain ..
Use the? constant-growth model : Use the? constant-growth model? (Gordon model) to find the value of the firm. Kelsey? Drums, Inc., is a? well-established supplier of fine percussion instruments to orchestras all over the United States. The? company's class A common stock has paid a..
How would you advise him to begin the staffing process : Carlos Fontana is the franchise owner for three local Taco Bell restaurants. He is opening a fourth restaurant and needs to staff it. How would you advise him to begin the staffing process?
Evaluating a firm external environment : The strategic management process - Evaluating a Firm's External Environment. Find a news article (from reputable sources) that discusses "firms being threatened by substitutes".
Complete an assembly design : Design a fancy intricate part or assembly of your choice that utilizes the advanced features of the software. Part 2 will be graded on originality, complexity and the level of use of Solidworks for more advanced modeling functions.
Determine and plot the magnitude of the complex envelope : Determine and plot the magnitude of the complex envelope of both the unfiltered and the filtered π/4 DQPSK signal. What do you observe? Explain the results.
What would be the additional funds needed for coming year : Broussard Skateboard's sales are expected to increase by 15% from $7.8 million in 2015 to $8.97 million in 2016. Its assets totaled $5 million at the end of 2015. Baxter is already at full capacity, so its assets must grow at the same rate as project..
Strategic management process : The strategic management process. Find a news article (from reputable sources) that discusses "why understanding strategy is important, even if you're not a senior manager".
How you would integrate a process to create collaboration : Develop and explain how you would integrate a process to create collaboration & cohesiveness within your team environment.

Reviews

len1302078

12/6/2016 12:20:41 AM

Exploded view of the assembly and possible sub-assemblies. This does NOT have to be on a drawing with the BOM and balloons and such. Just create an exploded view in SolidWorks and take a screen shot, or multiple screen shots if you need to take close-up images to show more detail. 5. Written summary of your simulation including maximum displacement and stress and a few sentences discussing these results. 1-2 screen shots and a table of the results. Items 2-5 should be combined in a single PDF file and submitted to the drop box on the course website. You also need to write what you say in the short video in item 1. If you can, it is better to find a Chinese male voice of an Asian male voice speak in this video.

len1302078

12/6/2016 12:20:14 AM

1. A short (60 second or less) video describing your project. This should be fast-paced and annotated with both narration and music. It should include unique techniques you used and challenges you had while creating the design. It should focus on all aspects of the grading criteria: originality, creativity, complexity, and the obvious use of SolidWorks modeling features. All drawings and SolidWorks renderings required to quickly describe your project in detail should be included. The project should also include one simulation - as discussed in class this will most likely be a linear static analysis. This video or a link to the video should be uploaded to the drop box on the course website. 2. A Four-View screen shot of the major parts showing the Feature Manager Tree. The image must be clear, and it should take up a full page in Landscape orientation. Make sure all features are clear and easy to see, and take screen shots of close-up views if necessary. 3. A Four-View screen shot of the assembly (full page) showing the Assembly Manager Tree. 4. Exploded view of the assembly and possible sub-assemblies.

len1302078

12/6/2016 12:19:52 AM

You must model an interesting and relatively complicated assembly (however a VERY DETAILED single part may also be acceptable if approved beforehand). The requirement for the assembly is that it must have at least 7 distinct parts (and hopefully much more). This should be exceeded easily if the complexity of your project is adequate for the final project. An example we gave during the beginning of the quarter was the Buzz Lightyear toy. This had several parts (arms, legs, feet, hands etc.) and several components of the space suit. Work on your own project. You can do whatever you want. For example, like a car model or a robot. You also need to do one simulation on your project. For most of you this will be a static structural analysis where you estimate a worst-case load on your design, apply that load using SolidWorks simulation and then report the maximum stresses and displacements resulting from that load. You must show the use of some of the more advanced features of SolidWorks that you learned in this course. Other than that, you may do whatever you want, so have fun with it! Make sure to engrave your name somewhere on your assembly.

Write a Review

Other Engineering Questions & Answers

  American society of mechincal engineers

Write a short paper describingyour dream job, regardless of pay or geographical location ?

  Some purpose such as modeling or curve fitting

Use a For Loop to create an array containing 100 elements between 0 and 500.

  Show the initial led display and the result of the button

The video clip for this exercise should show the initial LED display and the result of the button being pushed. Please repeat by letting go and pushing the button again, two or three times.

  Simplify analysis of time-based circuits issues

How does the determination of each help in understanding the response of a circuit?

  Determine the unit area frequency response characteristic

Determine the unit area frequency response characteristic β on a 100-MVA base, (b) the steady-state increase in area frequency,

  Draw a state transition table and derive the input equations

Design the counter as a Moore machine where the state bits serve as the count outputs. Draw a state transition table and derive the input equations for implementing the counter using D flip-flops and logic gates.

  Elaborate the decision problems in urban

Name and elaborate the decision problems in urban and regional planning

  What everyday technology are base on multiplexer technology

What everyday technologies are based on multiplexer technology? Identify the inputs and outputs of that technology? What condition determines when to use a ripple carry adder vs a look-ahead carry adder?

  Tools needed to effectively manage a virtual team

Identify the skills you possess that would enhance a virtual team project.

  Draw the portion of an asm chart

Draw the portion of an ASM chart that specifies a conditional operation to increment register R during state T, and transfer to state T2 if control inputs z and y are equal to I and 0, respectively.

  Impose a time limit on entering the correct combination

Impose a time limit on entering the correct combination in that after the user enters the first symbol of the combination, he or she has five seconds to enter the entire sequence.

  Logical connectives

Logical connectives chapter complete explanation step by step with suitable examples

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd