You are to design a chlorination tank for killing microorganisms in the effluent from a wastewater treatment plant. It is necessary to remove 99% of active bacteria in a wastewater flow of 120 m3/hr.
Assume the inactivation rate constant (k) of 0.2 min-1.
a) Determine the tank volume if the contact tank is a CSTR reactor.
b) What is the retention time of the CSTR reactor.
c) It was proposed that, instead of using a CSTR tank, the activation can be achieved in the transport pipeline (diameter = 0.3 m) from the treatment plant to the river. Calculate the required length of the pipeline to achieve the same 99% remove.
A sewage treatment works (STW) with 4 single-stage trickling filters has become organically overloaded due to the discharge of a biodegradable industrial effluent to the STW. This is causing effluent to pond on the surface of the filters.
Explain about pres-stressed concrete
Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways:
The section of the plywood in the 3rd quadrant is sawed off and the resulting piece is then glued squarely over the 4th quadrant portion of the plywood with glue of negligible weight.What are the x- and y-coordinates of the resulting center of gra..
what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?
Calculate average figures for tonnes/round and powder factors in kg/tonne and Determine the drill metres required to achieve a production rate from grade control blasting.
Determine the number of man-hours required to form the structure using data from R. S. Means or other appropriate reference. What is the difference between labor cost and labor pro-ductivity?
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.
The difference between the total and static pressure before a shock is 75 psi. What is the maximum static pressure that can exist at this point ahead of the shock? The gas is oxygen.
Evaluate company performance in relation to GRI standards and comment on Stigler's theory.
Prepare a capstone report for designing of steel building using AISC 14 edition manual.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd