Check that the nominal shear strength measurements are

Assignment Help Civil Engineering
Reference no: EM13560345

The measurements of the nominal shear strength (in kN) for a sample of 15 prestressed concrete beams are as follows:

580 400 428 825 850 875 920 550 575 750 636 360 590 735 950

* Data from Tan, k., K. tong, and C. Tang. 2001. Direct strut-and-tie model for pre-stressed deep beam. Journal of Structural Engineering, 2001:1076-1084.

(a) Check that the nominal shear strength measurements are normally distributed and verify that there are no outliers in the sample data.

(b) Can you support the claim that the mean nominal shear strength is actually less than 600 kN at ? = 0.05? Find the p-value.

(c) Compute the power of the test if the true mean nominal shear strength is 750 kN.

Reference no: EM13560345

Questions Cloud

Use the watch as a navigation : Use the watch as a navigation
Determine the irr of building the corrosion-resistant tower : Determine the IRR of building the corrosion-resistant tower. (Hint: Calculate interest rates from 7% to 11% using formulae provided in tables).
Employers are shifting more employee healthcare costs : Assignment Background: Employers are shifting more employee healthcare costs to employees. Answer these questions: What are the consequences of that change? Where does social responsibility of employers end and where does the need to operate more eff..
Estimate the particle size that will be collected with : A cyclone has been designed with an inlet width of 10cm and an inlet height of 6cm. The height of the main upper cylinder is 16cm and the height of the lower cone is 16cm. The inlet gas velocity is 16m/s and the particle density
Check that the nominal shear strength measurements are : Check that the nominal shear strength measurements are normally distributed and verify that there are no outliers in the sample data.
Order of potential impact and likelihood : Discuss the risks and rank them in order of potential impact and likelihood
At what rate should the well be pumped so that the water : A well of 0.4 m diameter fully penetrates a 25 m thick confined aquifer of coefficient of permeability of 12m/day. The well is located in the center of a circular island of radius 1 km. The water level at the boundary of the island is 80m. At what ra..
Analyze the existing business strategies : 1. Analyze the existing business strategies, domestic and global environments, industry, and internal capabilities for both Apple and Samsung. Assess the significant manner in which each company's mission and vision align with the long-terms goals an..
Determine all reactions and draw the shear and moment : Analyze the frame by moment distribution. Determine all reactions and draw the shear and moment diagrams, locating points of inflection and labeling max and min shear and moment values.

Reviews

Write a Review

Civil Engineering Questions & Answers

  How high can the hump be made without backing flow up

A smooth hump is placed in the bottom of the channel. What would be the depth of flow over a 3 ft high jump. How high can the hump be made without backing flow up What would be the depth of flow over and just upstream of a 6 ft high jump

  Determine when the queue will dissipate the total delay

If vehicles are processed at a uniform deterministic rate of six per minute, determine when the queue will dissipate, the total delay, the maximum queue length (in vehicles), the longest vehicle delay under FIFO, and the longest vehicle delay unde..

  Explain the necessity of super elevation in the design

explain the necessity of super elevation in the design of horizontal curve also prove that rv=v2/{g(fs+e)}

  Compute both the wet and dry unit weights of the compacted

A compaction test was conducted in a soils laboratory, and the standard proctor compaction procedure (ASTM D698) was used. The weight of a compacted soil specimen plus mold was determined

  Determine the dimensions of the pit that minimizes cost

Assume excavation costs at $100/m3, side lining costs at $50/m2, and cover cost at 25/m2. Determine the dimensions of the pit that minimize cost -If the side slope is unconstrained and -If the side slope must me less than 450

  Compute the probability of failure in the pipeline system

A water pipeline system is made up of three links in parallel. In any given year, on average, 99 in 100 pumps do not fail. The conditions in the links are statistically independent of each other.

  Determine what is the total force on the roof at collapse

a storage tank has a diameter of 80 ft, a height of 25ft and contains oil to a height of 15ft. the suction pumps, which can handle 15000bbl/d, are started, but the safety valves are clogged and a vacuum is drawn in the tank.

  Determine the elongation of the cable due to its own weight

determine the elongation of the cable due to its own weight. B. show thet the same elongation would be obtained if the cable were horizontal and if a force equal to half of its weight were applied at each end

  What would be the capillary pressure between oil and water

If the interfacial tension between air-mercury interface in a capillary tube is 480 dynes/cm and the contact angle through the mercury is 140, what would be the capillary pressure between oil and water

  Explain whether the project is economically stable

Additional cost at the end of year 1 = $50,000. Benefit at the end of year 1 = $0. Annual benefits at the end of Years 2-10 = $20,000. Interest Rate = 7%. Conventionally B/C ratio and wheter the project is economically stable.

  Determine the net power delivered and the cycle efficiency

Determine the net power delivered and the cycle efficiency. What is the percent increase in the efficiency compared to an otherwise identical system with no regeneration. Assume “cold air-standard cycle” for both systems above.

  Compute the magnitude of the load that is necessary

An alloy has a yield strength of 41 ksi, a tensile strength of 57 ksi, and an elastic modulus of 16 X 10^6 psi. A cylindrical specimen of this alloy 0.5 in in diameter and 10 in long is stressed in

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd