Drive shaft manufacture

You have been employed as a member of a production improvement task force for a Drive Shaft Manufacturing Company (DSMC). DSMC has been experiencing a severe backlog in sales orders due to antiquated machinery and poor production planning. The Company has just received an unprecedented contract to supply 450 drive shafts by the process given below. However, finances at present are tight and only £250,000 can be invested. Some of the order can be sub-contracted. Your task is to determine the maximum capacity of the current production line after the investment of the £250,000 hence how many parts must be made by the sub-contractor. The cost list of potential capital improvements is given on next page.

The current output of the line averages 180 shafts on the two 38-hour shift system.

Process:

The drive shaft manufacture starts with a bar of 0.3 metres long that is cut into three parts (blocks). The operations are as follows (one machine at each operation unless stated otherwise):

1. The bar arrives based on vendor's supply schedule in lots of 3, every 30 minutes. The bar stock buffer can hold only 10 bars.

2. In the Saw machine, the time to cut the bar into 3 blocks is 6 minutes. Blade A is replaced every 40 operation and blade B every 30 operations. Set-up time is uniformly distributed between 10 and 15 minutes. Time between failures is NEGEXP with mean of 100, and the repair time follows triangular distribution with min 10, mode 25 and max 30. An operator is required to run this machine.

3. After sawing the blocks go to a Fixed conveyor with index time = 0.25 min, length 20 parts.

4. Once sawed the blocks must be coated for protection. The Coating machine takes 6 parts per cycle and has a cycle time of 60 minutes. Every 10 cycles, the machine is set-up for 5 minutes.

5. Once coated, the blocks are placed in a staging buffer of capacity 10 part, adjacent to the Inspector.

6. The Inspector draws from the staging area one block at a time and checks the quality of the block's coating. The cycle time = 20 min, set-up = 1min per part. If the coating is bad, the Inspector puts the rejected block into a Rework buffer of capacity 10. The reject rate is 20%, and rejects are returned to be recoated.

7. Parts are cured on an individual basis on a chain conveyor (Hardener) of capacity 10 parts through a furnace, a process on a first in first out basis. Heat-treat time is 60 min.

8. The hardened parts go for Gear cutting: cycle time 2 minutes + 1 minute load and unload that is manual, 2 machines, tool change every 100 parts for 10 minutes. Breakdowns mean time to failure 5000 minutes NegExp, repair time normal mean 80 minutes σ = 10. One operator runs two machines and changes cutter.

9. Four parts are Loaded into a special fixture in 4 minutes before entering for grinding; 10 fixtures are available in the system and are stored in a Fixture buffer if not used.

10. The 4 parts and the fixture are loaded to the Grinders (2 machines): cycle times M/c 1 = 35 min, M/c 2 = 40 min; Time between failures is normal distribution with mean = 75 min, SD = 15. The repair time is NEGEXP of mean 15 min and is repaired by the Saw operator.

11. Once ground, the fixture is Unloaded in 4 minutes. The fixture returns to the Fixture buffer and the parts go to two buffers of capacity 10 parts each.

12. The parts are then cleaned in the Wash machine, a multi stage machine with 5 stations, 1 part per station, cycle time = 15. Time between failures NEGEXP of mean 120 min, the repair follows Erlang distribution with mean = 20 min, K = 3. The machine is set-up every 100 operations, time 5 min. Set-up and repair are carried out by the Saw operator.

13. The Plating process follows and takes 36 parts per cycle, cycle time 36 minutes, buffers on machine 72 parts both before and after process. Due to chemical change on Monday morning, 4 hours are lost. An operator is required.

14. The parts are then washed with a Wash machine identical to 12.

15. The finished parts are Packed in Pack cycle time of 1.25 min. Packed into flat pack boxes one drive shaft per box. Boxes arrive in batches of 1000, frequency of deliveries to be determined by model. One operator required.

16. The boxes are finally shipped.

Attachment:- Assignment Case.rar

Verified Expert

The case study solution was developed for the provided case along with the process improvement plan.The file has provided justifications for the procurement suggested from the additional budget invested in the case. The case solution was mathematically justified for process improvement in terms of cost, time and capability of production operation

Reference no: EM131434849

Questions Cloud

Find the rate of return : A month later, futures price increases 4% increase. Find the rate of return. (Report in percentage such as 25 instead of 0.25.) (margin for error: +/- 1%).
Find the solution in a vector form of the given system : Find the solution in a vector form of the given system. Find the particular solution of the homogeneous differential equation with the given initial condition.
Discuss about your ethical considerations analysis : First provide a key outline of the work below. This is due on 16 Mar include any notes that you feel are appropriate. The purpose of this assignment is to help improve the quality of the IP5.During the past few weeks, you have considered the vario..
What is the fund required rate of return : If the market's required rate of return is 11% and the risk-free rate is 7%, what is the fund's required rate of return? Do not round intermediate calculations. Round your answer to two decimal places.
Case for witness modelling and process improvement : MOD002610 Modelling & Simulation for Operations Management Assignment case study for Witness modelling and process improvement. The bar arrives based on vendor's supply schedule in lots of 3, every 30 minutes. The bar stock buffer can hold only 10 b..
What are the key features of a bond : a. What are the key features of a bond? b. What are call provisions and sinking fund provisions? Do these provisions make bonds more or less risky? c. How does one determine the value of any asset whose value is based on expected future cash flows?
Examine issue and discuss their strengths and weaknesses : Examine issue and discuss their strengths and weaknesses. State if you support the view that Lck becomes activated upon TCR stimulation and justify your conclusion.
Presidents of mutual of seattle insurance company : Sam Strother and Shawna Tibbs are vice presidents of Mutual of Seattle Insurance Company  and co-directors of the company's pension  fund management division. An important new  client, the  North-Western Municipal Alliance,  has requested that Mut..
Discuss about the information governance in health care : Information Governance has become a focus of health informatics. A co-theme related to information governance is Data Stewardship. For this assignment, you will create a concept map to illustrate the relationships and differences between these ..

Reviews

inf1434849

8/27/2019 2:37:19 AM

5-star rating from, my side to the writer. pleased to see that work is done as per the given formatting. I will recommend your services to my friends.

inf1434849

8/27/2019 2:34:50 AM

It's a simulation assignment, please tell me what software will you use to solve the assignment questions? It's possible that the software you used outputs simulation files in a format that could be transferred to WITNESS. Please be sure before giving final work.

len1434849

3/21/2017 3:46:53 AM

Hello would you be able to do this assignment? This assignment has to be done in Witness Horizon 10 software. Note: Please present the process in a pseudo format before building the model in Witness.

Write a Review

Operation Management Questions & Answers

  How you could effectively increase the capacity

If your doughnut business is incredibly successful (to the point that you are now selling them frozen, via grocery stores nationwide, so that people can prepare them in their own homes), explain how you could effectively increase the capacity of your..

  Comfortable adopting rich communication media

As a manager are you more comfortable adopting "rich" communication media (face to face meetings) or more "leaner" forms( e-mail, newsletter)?Which one have had the most success and why?

  Complexity of business decision making

Reflect on your five year career goals and what you have learned about the complexity of business decision making in this course. Explain the value of understanding the concerns and interrelationships of the key business functions to your future c..

  Prevention aspect of the fire service as fire-fighters

In what way do building and fire codes help/hurt fire fighters? Is it important to know and understand the fire prevention aspect of the fire service as fire-fighters? Do fire and building codes take into account how the fire will behave when determi..

  Model the sources of defects

The Co-Pilot Pen company has taken samples of its defects to find sources of the defects. Draw a Pareto chart to model the sources of defects.

  Develop strong talent management program

Develop a strong talent management program globally to develop and retain talent that you have been losing to competitors and downsizing. Discuss the strategies that you might use in addressing both goals.

  What is modern management theory

What is modern management theory because are we not just working from the Scientific Management Theories of the 40s and 50? so what is more modern?

  Design characteristics of responsive supply chain

Your company manufactures and distributes a product for which an accurate forecast of demand from the final consumers cannot be derived. To address this, you are looking at the strategic redesign of your supply chain. What would be the design charact..

  Which of the following is not considered a project indirect

When a project manager must reduce project duration but resources are constrained, creating a software program that will have fewer features than originally planned or building a house without the bonus room the owner originally specified in the p..

  Some products in your personal or family inventory

List some products in your personal or family “inventory.” How do you manage them? (For instance, do you constantly run to the store for milk? Do you throw out a lot of milk because of spoilage?) How might the ideas in this chapter change your way of..

  What internal and external changes should be made

Do the combined companies have the right strategy to compete with their competitors such as JC Penney, Kohls, Target and Home Depot? What internal and external changes should be made? Why would the changes work?

  A marketing manager has three new product offerings

A marketing manager has three new product offerings to the marketplace: organic salad dressing, personal retirement software,

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd