Dust is removed from the airstream of a municipal incinerator by four dust collectors operating in parallel, each handling 1/4 of the total airflow of 200 m3/min. The airstream contains 10 g/m3 of suspended solids. The collector efficiency is 98%, decreasing linearly to 74% as air flow is doubled. If the maximum permissible solids concentration from the combined stack discharge [all 200 m3/min] is 1.0 g/m3, can one collector be temporarily taken out of service by:
(a) overloading the other 3 units [i.e., each of the three handling 1/3 of the total flow], or
(b) by not treating 1/4 of the airflow [i.e., mixing 150 m3/min of treated air with 50 m3/min of untreated air]?
The following wind conditions are expected: V = 10 i - 5 j mph for 0 10 hr. Draw to scale the expected streakline of the stream for t = 3, 10, and 15 hr.
What is the solution if foundation bolt cut by some way from their bottom of skid, i mean skid base than how to keep another bolt etc for tightness of skid along with pump-motor already fittied with pipe and other fitting's too..
A circular rc girder for the foundation raft of water tower has dia 10m.the udl load transmittedby 8 coloumn on te girder being 300 kn/m.the width of the beam is 500 mm and the over depth.
Knowing that each member has a 2 3 4-in. rectangular cross section and that each pin has a 12 -in. diameter, determine the maximum value of the average normal stress (a) in member BE, (b) in member CF.
write a function that calculates the average of a set of numbers. name the function calculate_average. the function should accept one input which is an array of numbers.
Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of 100th vehicle to arrive (assumin first-in-first-out)
The flow out of a reservoir is 2 L/s. The reservoir surface is 5 m x 5 m. How fast is the reservoir surface dropping?
During a particular 30-day period, the streamflow flowing into a reservoir averaged 5.0 m3/s. Water supply withdrawals from the reservoir averaged 136 mgd. The only other outflow from the reservoir was 9.4 cm of evaporation from the water surface.
You have 4 resistors (loads) in parallel. What is the total resistance of those loads The loads are as follows 4ohms, 6ohms, 16ohms and 1 ohms. When calculating 1/R, round to the fourth decimal point. Percentage of error margin is 0.5
Air at 200 kPa and 950 K enters an adiabatic nozzle at low velocity and is discharged at a pressure of 80 kPa. If the isentropic efficiency of the nozzle is 92%, determine the temperature and velocity of the air at the exit.
A rectangular channel 2.0 m wide carrying a discharge of 2.5 m3/s is to be fitted with a weir at its downstream end to provide a means of flow measurement as well as to cause heading-up of the water surface.
compute the max possible moment at the centerline of the beam and the absolute moment in the beam.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd