Calculate whether the process is capable or not

Assignment Help Civil Engineering
Reference no: EM131065254

The specification for the diameter of a hole is .75 inch ± .015 inch. The standard deviation of the drill press is .007 inch. Using Cp, calculate whether the process is capable or not.

Reference no: EM131065254

Questions Cloud

What percentage of the shafts will be within tolerance : what percentage of the shafts will be within tolerance?
Compute the householder matrix : Let a = (2.6, 4.7)T. Consider  the floating-point algorithm with  3 digit rounding. Compute the Householder matrix Q generated by a as a 2x2 array. (Remember to round each computation to 3 digit)
Low pass fir digital filter project using microcontroller : To design digital FIR low pass filter and to implement the FIR low pass filter using microcontroller and to get a linear phase response.
What is the portfolio beta if your portfolio is comprised : What is the portfolio beta if your portfolio is comprised of 30 percent of stock X, 20 percent of stock Y, and 50 percent of stock Z. Stock X has a beta of 1.21, stock Y has a beta of 1.38, and stock Z has a beta of 0.35.
Calculate whether the process is capable or not : calculate whether the process is capable or not.
Discuss how the expectations of the various actors : Identify and discuss how the expectations of the various actors in the case influenced the reforms and the setbacks to the reforms. Discuss the general advantages and disadvantages of administrative reforms and use example to support your argument.
Calculating cost of equity : Calculating Cost of Equity. The Lo Tech Co. just issued a dividend of $1.80 per share on its common stock. The company is expected to maintain a constant 6 percent growth rate in its dividends indefinitely. If the stock sells for $41 a share, what is..
Evaluate the process capability : A sample has an average of quantity of 8.04 ounces.
Persuasive essay incorporating research : A 10-12 page persuasive essay incorporating research, logical structure, and audience appeals, as well as a works cited page. PRE is graded on critical thinking, argumentative structure, persuasiveness of essay, and effective use of sources.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate max bending stress and shear stress in the pole

A Timber power-line pole is 10 in. in diameter at its base where it is solidly embedded in concrete. The pole extends 20 ft vertically upward from its base and is subjected to a horizontal pull of 300 lb at its top.

  A timber beam 6 in wide by 12 in deep is loaded and

a timber beam 6 in. wide by 12 in. deep is loaded and supported as shown below. the modulus ofnbspelasticity of the

  What are the northing and easting coordinates for station b

The coordinates for station A are 1023.34 N and 988.56 E. What are the northing and easting coordinates for station B that is located 40 feet due east of A, and 22.32 feet due south of A

  Design and detail two span continuous welded plate girder

assume lateral support at each support and every 20 ft between supports. assume constant depth for girder. use A 572 grade 50steel. use LRFD methods. minimum web thickness is 5/16 inches.

  What ph is required to acheive aluminum ion concentration

Aluminum ion (Al3+) is present in an industrial wastewater at 3 mg/L. The treatment facility wants to precipitate out the aluminum until there is only 0.2 mg/L remaining. What pH is required to acheive this aluminum ion concentration

  Determine a soil with a hydraulic conductivity and depth

Is a soil with a hydraulic conductivity of 1*10-5 cm/s and depth of 10 ft equivalent to a soil with hydraulic conductivity of 1*10-6 cm/s and depth of 5 ft

  Discuss how the nec3 form of contract provides stimulus

Discuss how the NEC3 form of contract provides stimulus to good management and compare and contrast this where possible with other forms of contract.

  Diverse aspect that turns engineering plans

Explain what you observe, how an engineer can use this information, and detail your findings in a brief paper no longer than 10 pages. You may work in a group of up to 3.

  Estimate the power in watts that can be produced by turbine

The design wind speed is 15 mph at T=10C and p=0.9 bar. The efficiency of the turbine is n=20% meaning that 20% of the kinetic energy in the wind can be extracted. estimate the power in watts that can be produced by the turbine.

  Determine the upward velocity v of the scaffold

The power winches on the industrial scaffold enable it to be raised or lowered. For rotation in the senses indicated, the scaffold is being raised. If each drum has a diameter of 200 mm and turns at the rate of 40 rev/min. determine the upward vel..

  Determine the volume fraction of fibers that will required

Using the data provided, determine the volume fraction of fibers that will be required. What will be the tensile strength of this composite? Assume that the matrix stress at fiber failure is 50 MPa (7250 psi)

  Describe some of the characteristics of the fe-c martensite

Define an Fe-C martensite. (b) Describe the following types of Fe-C martensites that occure in plain-carbon steels: (i) lath martensite, (ii) plate martensite. (c) Describe some of the characteristics of the Fe-C martensite

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd