Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A 0.5 m diameter concrete pipe (5.0 cm wall thickness with rigid pipe walls) carries water 600 m before discharging it into another reservoir. The surface elevation of the downstream resevoir is 55 m lower than the supply reservoir. A gate valve just upstream of the lower reservoir controls the flow rate. If the valve is closed in 0.65 seconds, what is the maximum water hammer pressure?
A water treatment llant and the water treatment plant removes calcium hardness (Ca2+) by precipitating (making) CaCO3(s). If, after establishing equilibrium with CaCO3(s), the dissolved Ca2+ concentration is 10 mg/L and the pH is 10.5.
Calculate the largest tolerable internal crack length for a 7075-T651 aluminum alloy component that is loaded to a stress one-half of its yield strength without catastrophic fracture.
Determine the arrival rate assuming that it is unchanged over the duration of the observation period. An approach to a pretimed signal with a 60second cycle has nine vehicles in the queue at the beginning of the effective green.
Evaluate company performance in relation to GRI standards and comment on Stigler's theory.
A computer technician can handle on average 5 service calls per day. The cost of adding a technician (C1) is $200 per day and the estimated cost of waiting per incident (C2) is $250 per day.
Design a simple horizontal curve to connect two roadway tangents that deflect at an angle chosen between 50 and 75 degrees. Assign a station to the curve PI and select a curvature of 6 degrees.
The PVC pipe weighs 36.1 pounds per foot of length. Determine the minimum uniform thickness (in) of concrete (150 lbs/ft^3) required around the exterior of the PVC pipe to prevent the empty pipe from floating.
Theis Method plot drawdown vs. time for 4 observation wells, 5, 50, 100, 500 meters from well pumping at constant rate of 300 m^3/day in sandy confined aquifer. b=12 m, K=25 m/day, and S=10^-4.
an embarkment will be constructed with the soil compacted to 95 percent of the max dry density. the borrow material, is deposited at a uniform density of 75 percent of the max dry density. the roadway embankment will require 75,000 cubic yards of ..
If a truck has a capacity of 24m^3 (Heaped) and 18m^3 (struck), with a total empty weight of 31600kg (truck), and needs to move soil at a density of 1850kg.m^3 (Bank) with a swell of 41%
A water treatment plant is processing water at s flow rate of 0.26m^3/s. The hydraulic detention times for the rapid mix tank, flocculation basin and the rectangular sedimentation basin are 10 sec, 30 min, 60 min, respectively.
After moving the bubble four divisions off center, the reading is 1.410 m. For 2-mm vial divisions, what is (a) the vial radius of curvature in meters and (b) the angle in seconds subtended by one division
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd