A stack was sampled for 5 minutes. The gas velocity (at stack conditions) through the sampler was 15.0 m/s and the area of the sample probe was 4 square cm. The net mass of particulates collected was 0.40 grams.
a. Calculate the concentration of particulates in the stack in micrograms per cubic meter.
b. The temperature in the stack is 350 degrees F and the pressure is 725 mm Hg. If the total flow rate of gas out of the stack is 200 standard cubic meters per second, calculate the total mass emissions of particulates out of the stack in kg/day.
Determine the critical load of a round wooden dowel that is 0.9m long and has a diameter of (a) 10mm (b) 15mm. Use E=12GPa
sand cone test has been performed . The test results: intial weight of cone + sand =13.51lb, Final weight of sand cone + sand= 4.26lb, weight of sand to fill cone=2.12lb, weight of soil from hole+bucket=12.42lb, weight of bucket=1.21lb
A Silane contains 90.31 % silicon and 9.69 % hydrogen by mass. The compound has a molar mass of 62 g/mol. Determine the compound's empirical and molecular formula.
The pipe has a flow of 5 m3/s. The stream's chloride concentration just upstream of the pipe's dischage is 12 mg/L, and the runoff pipe's discharge has a chloride concentration of 40 mg/L. Chloride is a conservative substance.
Given the data , design a section of sanitary sewer to carry these flows at minimum velocity of 2.5 fps. Assume that the minimum depth of the sewer below the street must be 8.5 ft and that an n value of 0.013 is applicable.
A rubber ball is inflated to a pressure of 65 kPa .At that pressure the diameter of the ball is 240mm and the wall thickness is 1.25 mm.The rubber has a modulus of elasticity E of 3.6 Mpa and a poisoon'd ratio of 0.48.
design a horizontal curve for a two lane road. The road has 12 ft. lanes. Due to expensive excavation, it was determined that a maximum of 34 ft. can be cleared from the roads centerline towards the inside lane to provide for stopping sight distan..
If 110 mg/L Alum (Al2(SO4)3 14H2O) is added to water containing a natural alkalinity of 20 mg/L as CaCO3, 1) how much lime (mg/L as CaO) must be added to react with the alum 2) How much precipitate (mg/L as Al(OH)3 ) is formed
A concrete box girder bridge has the rectangular x-section. The box is prismatic and considered thin-walled. It span is L=48m and simply supported at points A,B,C and D. The supports are assume to be able to transfer tensile forces.
he project duration is planned for 20 weeks. The project budget is $40,000 and is planned to be spent on a level bases through out the project. You are at the end of week 10, the accounting department tells you the project has spent $19,500
Describe the use of productivity models for estimating land productivity. Provide details about various attributes that can be used and how the model is developed . Examples can be used to demonstrate model workability.
Also, at the failure cross sections the diameters are found to be 0.731 in., 0.645 in., and 0.587 in., respectively. Determine the percent elongation and percent reduction in area of each specimen.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd