Reference no: EM13104651
You would like to construct an aggregate production plan for product X341 for the next four quarters.
Cost of regular production = 60 $/u
Cost of overtime production = 90 $/u
Inventory holding cost = 10 $/u/qtr
Cost of increasing production = 70 $/u
Cost of decreasing production = 120 $/u
Subcontracting cost = 115 $/u
Stockout cost = 130 $/u
Previous quarter's regular output = 600 u
Beginning inventory level = 120 u
The forecasted demand for the next four quarters are: 500, 1000, 400, and 1200 units.
Suppose that you want to set the quarterly regular production constant at 680 units and to use overtime if necessary. You do not want to use any subcontract. Furthermore, you will keep inventory as low as possible. Stockouts are not allowed.
You must perform the calculation and answer the questions shown below.
The beginning inventory in quarter 2 is ____________ units.
The overtime production in quarter 4 is _____________units.
Total regular production is _______________units.
Total overtime production is _____________units.
Total regular production cost is $________________
Total cost of increasing regular production is $_______________
Total cost of decreasing regular production is $________________
Total cost of holding inventory is $___________________
Total cost of overtime production is $__________________
Total cost of production is $____________________
Compute total regular production
: You would like to construct an aggregate production plan for product X341 for the next four quarters. Suppose that you want to use a chase strategy that increases and decreases production level to meet the quarter demand.
|
Is the force attractive or repulsive
: A 7.50 nC charge is located 1.80 m from a 4.20 nC charge. (a)Find the magnitude of the electric force that one particle exerts on the other. (b) Is the force attractive or repulsive?
|
Testing procedure-p-value and confidence interval
: What is the appropriate procedure to test for a significant difference in means between the two groups? Implement the procedure in problem using the critical value method
|
Find the angle between and the +x axis
: The magnitude of a force vector is 80.4 newtons (N). The x component of this vector is directed along the +x axis and has a magnitude of 72.6 N.
|
Calculate total cost of increasing regular production
: You would like to construct an aggregate production plan for product X341 for the next four quarters. The forecasted demand for the next four quarters are: 500, 1000, 400, and 1200 units.
|
Determine the amplitude of propagation of the wave
: The equation of a transverse wave traveling along a very long string is y = 5.0 sin (0.055 ?x + 6.0 ?t), where x and y are expressed in centimeters and t is in seconds. Determine the amplitude of propagation of the wave.
|
Explain issue-opportunity or problem from student website
: Recognize the research issue, opportunity, or problem from one of data sets available on student website. Data must consist of at least 30 or more observations of ratio or interval scale data from one of provided data sets.
|
What is the speed of electron when it is away from charge
: Two stationary positive point charges, charge 1 of magnitude 3.80 and charge 2 of magnitude 1.95 , are separated by a distance of 38.0 . An electron is released from rest at the point midway between the two charges.
|
Production possibilities curve
: The production possibilities curve represents the set of all and the opportunity cost of a glove in Panama - an airplane manufacturing consortium in Europe, which receives large subsidies from several European countries.
|