Calculate the velocity in the constriction and the flowrate

Assignment Help Civil Engineering
Reference no: EM13321250

Water flows through a 75 mm constriction in a horizontal 150 mm pipe. If the pressure in the 150 mm section is 345 kPa and that in the constriction 207 kPa, calculate the velocity in the constriction and the flowrate.

Reference no: EM13321250

Questions Cloud

What is the max flowrate which will occur without cavitation : If the water temperature is 70 degrees C (vapor pressure of water at 70 degrees C is 31.2 kPa absolute), and the pressure in the pipeline is 275 kPa, what is the maximum flowrate which will occur without cavitation
What yield would you need to earn on a taxable bond to be : A new-issue municipal bond rated Aaa by Moody"s Investors Service is priced to yield 8 percent. If you are in the 33 percent tax bracket, what yield would you need to earn on a taxable bond to be indifferent?
Would a bond investor be most likely to exercise a put : Under which scenario, rising interest rates or falling interest rates, would a bond investor be most likely to exercise a put option on a bond? Explain.
The mcdonald''s strategy : The strategy and problem are used in the McDonald's strategy
Calculate the velocity in the constriction and the flowrate : Water flows through a 75 mm constriction in a horizontal 150 mm pipe. If the pressure in the 150 mm section is 345 kPa and that in the constriction 207 kPa, calculate the velocity in the constriction and the flowrate.
Determine the largest load p that can be applied : If each cable segment can support maximum tension of 75 lb, determine the largest load P that can be applied.
State why is it more difficult to precipitate cupric acetate : Why is it more difficult to precipitate cupric acetate (verdigris) than cupric carbonate hydroxide (malachite)
What is the yield-to-maturity of a corporate bond with : What is the yield-to-maturity of a corporate bond with a 3-year maturity, 5 percent coupon (semiannual payments), and $1,000 face value if the bond sold for $978.30?
What is the net charge of the particle : at some point in space,the x and y components of the electric field are Ex= 1.73 N/C, respectively and Ey= 3.75 N/, respectively. What is the net charge of the particle

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compute the max acceptable tensile service load for angle

The service live load is three times the dead load. The 4-in leg contains a single line of 7/8 inch diameter bolts, and the 6 inch leg contains a double gage line of 7/8 inch diameter bolts.

  Determine the lengths of dg and cb of triangular tract

ABC is a triangular tract of land. The 1.5 tract DEFG is to be subdivided. AE is 480ft and DC is 350 ft. Determine the lengths of DG and CB. (Note 1 acre= 43,560 f^2)

  Formulate the shear and bending moment expressions

Show/formulate the shear and bending moment expressions for each board, and plot/draw the shear and bending moment diagrams of the boards.

  What is lowest grade possible for the constant-grade section

A tangent section of highway has a -1.0% grade and ends at station 4+75 and elevation 82 ft. It must be connected to another section of highway that has a -1% grade and that begins at station 44+12 and elevation 131.2 ft.

  Calculate the production energy required for a 4 kwp system

The story: The Civil Engineering Department would like to have solar panels installed on the roof of Ghausi Hall to supply some of its electricity use - after all there is plenty of space on the roof and plenty of sun in Davis.

  What is pressure and velocity of the water after contraction

Water pressurized to 3.5 x 105 Pa is flowing at 5.0 m/s in a pipe which contracts to 1/3 its former area. What is the pressure and velocity of the water after the contraction

  What is the estimated uncertainty in the length of vector

The base line vector between the base and roving reciever is 8340m and has an accuracy of +/-(1to 2 cm +/-2ppm). What is the estimated uncertainty in the length of this vector

  What minimum size pipe laid on the respective minimum slope

A MH at an intersection has an inflow from three 8-inch PVC (n = 0.01) sanitary sewer pipes laid at minimum slope converging at an intersection and one pipe taking the flow from those three further downstream.

  How many grains of rice were placed on the 16th square

there is a legend that the inventor of chess asked fora small payment in return for the marvelous game he had developed; one grain of rice for the first square on the chess board, two for the second square, four for the third square, and so on.

  Determine the torque that develops in the rod in in-lb

The end of a 0.75-in-diameter rod is fixed to an immovable plate. The length of the rod is 18.0 in. A 50-lb weight is attached to a 16.0-in lever at the end of the Rod so that the weight is hanging perpendicular to the longitudinal axis of the rod..

  Find excess solids production of extended aeration process

Estimate teh excess solids production of an extended aeration process treating unsettled wastewater with a BOD of 200 mg/l and suspended solids concentration of 240 mg/l, assuming k=0.35.

  Determine the velocity of the particle as a function of time

a particle moving along a straight path decelerates according to a = -kv. this represent a drag-induced deceleration. assume that the intial velocity is vo at t=0 and s = 0. determine the velocity of the particle both

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd