Calculate the total set-up and processing time

Assignment Help Operation Management
Reference no: EM131853382

Littlefield Technologies (LT) opened its first and only factory to produce its newly developed Digital Satellite System (DSS) receivers. LT mainly sells to retailers and small manufacturers using the DSS's in more complex products. LT charges a premium and competes by promising to ship a receiver within 24 hours of receiving the order, or the customer will receive a rebate based on the delay. The product life cycle of many high-tech electronic products is short, and the DSS receiver is no exception. After 140 days of operation, the plant will cease producing the DSS receiver, retool the factory, and scrap any old tools. In the initial months, demand is expected to grow at a roughly linear rate, stabilizing after about 2 months (60-70 simulated days).

The release of the next generation product (which will be manufactured in another facility using a different process) is scheduled after exactly 116 days of production on the current version. At that point, it is expected that demand on the current version will progressively collapse down to zero. Although orders arrive randomly to LT, the marketing department expects that, on average, demand will follow the trends outlined above. Management's main concern is managing the capacity of the factory in response to the complex demand pattern predicted. Delays resulting from insufficient capacity would undermine LT's promised lead times and ultimately force LT to turn away orders. In addition, customers would pay dramatically higher prices for the DSS receivers if they could be delivered within 6 hours instead of 24 hours.

However, management is skeptical the 6 hour lead time could ever be consistently achieved. It is now late February, and after 20 (simulated) days of operation LT is starting to fear that a few of their receivers may be soon delivered after their due dates given the increase in demand. In response, management has installed a high-powered operations team (you) to manage the factory. For the next 120 simulated days (i.e. 10 real days) you must buy or sell machines to maximize the factory's overall cash position. Currently there is one board stuffing machine, one tester, and one tuning machine. You may also change the way testing is scheduled.

Currently, jobs at the tester are scheduled First-In-First-Out (FIFO), but you can give priority status either to the initial tests or the slightly longer final tests. Orders for receivers arrive in batches of 60, and currently each order travels through the factory in one lot of 60 kits. However, you may divide each order of 60 kits into 2 lots of 30 receivers, 3 lots of 20 receivers, 5 lots of 12 receivers, or 10 lots of 6 receivers. Each lot travels independently through the factory, but the order is not shipped until all the lots that make up the order are completed. The manufacturing step on each machine consists of a complex combination of automated and manual tasks such as loading the group of boards and setting up fixtures. Your shop-floor supervisor has recently completed the following processing time estimates:

2 Step Station Set-up time (hours per lot) Operation time (hours per unit) 1 1 0 0.0425 2 2 0 0.03 3 3 1.5 0.00111 4 2 0 0.03 In addition, very little variability was observed around the processing times indicated above for process steps 1,2 and 4, so that they can be considered deterministic for practical purposes. Process step 3, which is performed on station 3 (tuning), is more labor-intensive, so that the corresponding processing times exhibit more variability and their distribution seems roughly exponential (coefficient of variation equal to 1). You have two contracts to choose from:

In the default contract, jobs completed within 24 hours earn $1000. Late jobs incur a revenue penalty of $500 per day (prorated by fractions of a day), so that jobs that take longer than 3 days to complete earn no revenue;  In the fast lead time contract, jobs completed within 6 hours earn $1500.

Late jobs incur a penalty of $250 per hour (prorated by fractions of an hour), so that jobs that take longer than 12 hours to complete earn no revenue. You may change lot size or contracts by clicking on the "Customer Order Queue" icon and then clicking on "edit data." You can buy, sell, or change scheduling at machines by clicking on the icon corresponding to the machine type. You will also need to manage the raw materials procurement process, namely set the reorder point and order quantity. Raw kits are purchased from a single supplier and cost $10 per kit ($600 per order).

There is also a fixed cost of $1000 per shipment of raw kits, independent of the shipment size, and the supplier requires four days to ship any quantity of raw kits. The balance on your bank account earns interest (compounded every simulated day) at a compounded rate of 10% per year.

After day 40 you may be able to obtain a bank loan under the following conditions: initial cost of debt as a fraction of debt 5%; debt rate 20% per year. When the assignment begins, there will already be 20 days of history available for your review. The simulator will run at a rate of 0.5 simulated days per (real) hour for the next 10 days. Thus, there will be a total of 140 days of simulation corresponding to a product life cycle of a bit less than 5 months (you only gain access to the simulation after 20 simulated days have elapsed however).

Question:

Calculate the total set-up + processing time (in hours) for one lot summed over the 3 stations for each possible lot size L (60, 30, 20, 12 and 6 kits per lot).

How do you expect the lot size and the number of machines at each station to impact the total order lead time? Provide a qualitative explanation of your prediction.

Reference no: EM131853382

Questions Cloud

Life of the average working american : Summarize how this discovery affected the life of the average working American during the colonial period. Use specific examples and details
Calculate theoretical maximum and minimum normalized numbers : Calculate the theoretical maximum and minimum normalized numbers that can be represented by the float type on your system.
Locate a recent international merger between two companies : Locate a recent international merger between two companies and describe in your post what are the possible issues that can (or has) arise.
Struggle after the civil war over : There was a struggle after the Civil War over whether to reinstate the power of Southern whites or whether to promote the rights of African Americans
Calculate the total set-up and processing time : Calculate the total set-up + processing time (in hours) for one lot summed over the 3 stations for each possible lot size L
Colonist at the time of the american revolution : Imagine yourself as a colonist at the time of the American Revolution. What do you think is the most compelling reason to be a Revolutionary?
Which do you think you would enjoy doing more on the job : Which do you think you would enjoy doing more on the job-designing large systems that contain many programs, or writing the programs themselves? Why?
Resources on the assyrians and the phoenicians : After reading and viewing the provided resources on the Assyrians and the Phoenicians, discuss the different ways that these two cultures built their empires
Artist using a non-traditional medium : Pick a work of art from an artist using a non-traditional medium, determine how it's material/ medium supports the artists intended message

Reviews

Write a Review

Operation Management Questions & Answers

  Overall description of company history

Company Research of five companies is provided in the structured manner in this response. The answer includes references employed.

  Discuss the merits and potential drawbacks

discuss the merits and potential drawbacks of each of these franchises. Which franchise would you invest in, and why?

  American are medically obese today

1. Statistically, two in every three American are medically obese today. Should obesity be classified as a disability? What are the implications for businesses hiring obese employees under the ADA?

  Provide high quality with each activity in the operations

Select a type of small business. Then, following the Operations Processes (Input - Processes - Output), describe ways the business owner can provide high quality with each activity in the operations of that business.

  What type of vendor support and vendor maintenance

Discuss what training will need to be done prior to implementation. What type of vendor support and vendor maintenance will you need after implementation? How long will this be needed

  Explain the differences between proactive and reactive tna

Explain the differences between proactive and reactive TNA. List and describe an example of each approach.

  What type of leader was the emperor in movie last emperor

What type of leader was the emperor in the movie the last emperor.

  Discuss twelve reasons why strategy implementation can fail

Briefly discuss twelve (12) reasons why strategy implementation can fail and twelve (12) safeguards that can prevent implementation from failing.

  Why advising seems to be preferred mode of intervening

Review why advising seems to be a preferred mode of intervening, even though it is often the least effective. D

  Developed a personal quality checklist

Pretend that you have developed a "personal quality checklist" on which you tally non conformances in your personal life (such as being late for work or school, not completing homework on time, not getting enough exercise, and so on). Briefly describ..

  Prepare a project feasibility report

What factors do you need to consider when you start to prepare a project feasibility report? What are some examples?

  Do they fit the four components of an organizational vision

Do they fit the four components of an organizational vision? How might these statements affect the strategic choices made by the company's strategic decision makers?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd