A project to build a new bridge seems to be going very well since the project is well ahead of schedule and costs seem to be running very low. A major milestone has been reached where the first two activities have been totally completed and the third activity is 63% complete. The planners were only expecting to be 52% through the third activity at this time. The first activity involves prepping the site for the bridge. It was expected that this would cost $1,422,000 and it was done for only $1,302,000. The second activity was the pouring of concrete for the bridge. This was expected to cost $10,502,000 but was actually done for $9,002,000. The third and final activity is the actual construction of the bridge superstructure. This was expected to cost a total of $8,502,000. To date they have spent $5,002,000 on the superstructure.

Calculate the schedule variance, schedule performance index, and cost performance index for the project to date. (Round your "performance index" values to 3 decimal places.)

 

Reference no: EM13230804

Questions Cloud

Determine equivalent circuit of transformer as low-voltage : The following test data were obtained from testing a 48kVA, 4800/240-V, step down transformer: Open-circuit test Voltage (V) 240 Current (A) 2 Power (W) 120 Short-circuit test Voltage (V) 150 Current (A)10 Current
Similarity and differences between the code of c++ and java : The following is simple java program with a for loop and a simple function What is its equivalent in C++ code? Notice the similarity and differences between the code provided below to C++. Create a project and run the program and see how it runs.
Describe the framework of general model of planned change : Describe the framework of the general model of planned change. Include a discussion of each activity and a typical sequence of events.
What problems associated with planned change : What problems associated with planned change should the OD practitioner be aware of? How might such problems be overcome?
Calculate the schedule variance, schedule performance index : Calculate the schedule variance, schedule performance index, and cost performance index for the project to date. (Round your "performance index" values to 3 decimal places.)
Calculate the real and reactive power at the sending-end : A 60 Hz, three-phase, transposed transmission line has the following parameters: Z = 13.114+ j52.952, Y = j0.311/1000. The sending-end line-to-line voltage is 161 kV. The total receiving-end load is represented by ZL =143 with an angle
Calculate the magnetizing branch impedances : A 10kVA, 200/400V 50Hz single-phase transformer gave the following test results. O/C test: 200V, 1.3A, 120W, on l.v. side. S/C test: 22V, 30A, 200W on h.v. side. (a) Calculate the magnetizing current and the component corresponding to core loss
Find the percentage regulation when supplying full load : A 10kVA, 200/400V 50Hz single-phase transformer gave the following test results. O/C test: 200V, 1.3A, 120W, on l.v. side. S/C test: 22V, 30A, 200W on h.v. side. (a) Calculate the magnetizing current and the component corresponding to core loss
Identify key gaps in planning for the exit : Identify key gaps in planning for the exit. Provide recommendations on the exit strategy. Is the sale the right one? What steps ought to be taken to maximize the sales-price? What do you see as a realistic time-horizon for the sale? What other act..

Reviews

Write a Review

Operation Management Questions & Answers

  How is severance calculated and when is it due

1. When are pay raises required? 2.Is extra pay required for weekend or night work? 3. How is severance calculated and when is it due?

  A t-shirt manufacturer has fixed costs

A T-Shirt Manufacturer has fixed costs of 125,000 dollars. She sells the T-Shirts for 10 bucks and has variable costs of 4 bucks per shirt. How many T-shirts does she need to sell to break even?

  Computation of required rate of return

Harrison Clothiers' stock currently sells for $26.00 a share. It just paid a dividend of $2.25 a share (i.e., D0 = 2.25). The dividend is expected to grow at a constant rate of 7% a year.

  Illustrate what should be the actual cycle time

They plan to use this production line ten hours a day in order to meet forecasted demand of 900 units per day. The subsequent table describes the tasks necessary to produce this product.

  How many boxes of lettuce should the supermarket

Past history says that tomorrow's demand for lettuce averages 230 boxes with a standard deviation of 33 boxes. How many boxes of lettuce should the supermarket purchase tomorrow?

  Determine critical path for the network

Hamilton County Parks is planning to develop a new park and recreational area on a recently purchased 100-acre tract. Project development activities include clearing playground and picnic areas, constructing roads.

  Each unit of product must be processed on two assembly lines

Each unit of product must be processed on two assembly lines, where the required production times are as follows.

  A company must chose between two shipping alternatives

A company must chose between two shipping alternatives two day freight and five day freight. Using five day freight would cost $135 less than using two day freight.

  Obstacles to implementing roi measures

What advantages accrue to training evaluation that measures return on investment (ROI)? What are some of the obstacles to implementing ROI measures.

  Describe three specific crimes in which digital forensics

In your response, be sure to list the type(s) of evidence that would most likely be collected in the crimes that you have described.

  R illustrate what range of demand would mechanized process

Over illustrate what range of demand would manual process be preferred over mechanized process. Over illustrate what range of demand would mechanized process be preferred over manual process.

  What is the eoq

What is the EOQ.What is the total annual order and inventory holding costs for the EOQ.What is the reorder point without safety stock. What is the reorder with safety stock.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd