Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A country town C has a present population of 6000 people and is growing at the rate of 3% per year. The town is currently supplied with water by gravity through 6 km long 300 mm diameter pipeline, continuously over 24 hours/day from a small and shallow reservoir A to a partly excavated 9 ML service basin B as shown in Fig. 2a. A 2 km long 400 mm diameter main then feeds from the service basin into the town reticulation system. The water supply demand on the peak day is assumed to be as shown in Fig. 2b. Because of the expected population increase by year 2035, a proposal has been forwarded to augment water supply by pumping from the near by river at D to the service basin B during the peak demand period.
Streams feeding the reservoir and the nearby river flow through farm land pick up a range of contaminants from overland runoff. Periodic problems have occurred in the service reservoir water with respect to microbiological contaminants, algal blooms with associated taste and odour, colour, iron and manganese. Accordingly it has been decided to construct a water treatment plant for the town supply. Assume C = 100 and use the nomograph for Hazen - Williams formula in all pipe flow calculations.
a) For the present arrangement, check whether the capacities of pipeline AB and BC and the service basin B are adequate.
b) Calculate the total annual demand which will be imposed on the water supply system at the end of the design period.
c) Calculate the required pipe size for the rising main DB, assuming that pumping would occur at a uniform rate between 8 am and midnight on the day of maximum demand at the end of the design period.
If = 300 N , determine the required minimum compression in the spring so that the wedge will not move to the right. Neglect the weight of A and B. The coefficient of static friction for all contacting surfaces is .2 Neglect friction at the rollers.
You are asked to design a pump station to conveywaste water at a flow rate of 250 cubic meters per hour to anequalization tank. A velocity of at least 3ft/s must be maintained in the pipe to prevent deposition and provide scouring of any previously d..
A water main is used to refill an elevated storage tank during the night. a 100 ft long, 12 in steel pipe (ks=.06 mm) connects to the booster pump that provides a pressure of 75 psig at the pump outlet.
Determine the normal depth in a trapezoidal channel with a bottom width of 6.4 ft and side slopes of 1 vertical to 2 horizontal. The discharge is 85 ft3/s. Manning's roughness factor is 0.025 and the channel bottom slope is 0.001
Separate triaxial compression tests are performed on identical soil samples. The soil is a saturated mixed soil. Both tests follow the procedure for consolidated-undrained conditions.
A municipal WWTP discharges 22.5 MGD of secondary effluent containing 45 mg/L of ultimate BOD at 26.7 C with 1.3 mg/L of dissovled oxygen. The stream flow is 237 ft^3/s at an average velocity of 2.1 ft/s and an average depth of 7ft.
Chemical ‘A' is regulated by EPA and the maximum allowable concentration in water is 5 ?g/L. Design a reactor for a water treatment plant where 1000 ppm of chemical ‘A' is introduced at a flow rate of 100 m3/min.
Should Bernard bid for the project assignment? Why or why not? Does Bernard have an unfair advantage over firms having designed the project on which he wants to bid?
A plume of bromoform dissolved in grounwater originates from two storage ponds with a total length of 150 m. The ponds penetrate the unconfined aquifer to a depth of 5 m.
The evaporation rate from the surface of a 3650-acre lake is 100 acre-ft/day. Estimate the depth change in the lake in feet during a 1-year period if the net inflow to the lake is 25 cfs. Is the depth increasing or decreasing? What is the change in c..
If 140,000 cy of compacted fill are required using the type of compaction drums described, how many drums are required if the project is to be completed in 25 working days?
During the rainy season in a tropical country, the probability of a day being dry is 0.10. A dry day is defined as one without significant rainfall. Assuming that the number of days until the next dry
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd