A wastewater treatment plant has two rectangular primary settling tanks, each 40 ft long, 12 ft wide, and 7 ft deep. The effulent weir length in each tank is 45 ft. The average daily wastewater flow is 387,000 gal. Calculate the overflow rate and effulent weir loading. What is the estimated BOD removal?
A hybrid car has a initial cost of $70,000 is to be depreciated by the straight-line method over a six years. The asset will a salvage value of $10,000. According to the straight line method, the book value at the end of year 3 is
An open rectangular tank contains water up to about half its depth. this tank accerlerates at a=2.2m/s2 up a slope of alpha, which causes the free water surface to form an angle theta with the horizontal plane. what is angle aplha of the slope
A 12kw (shaft output) motor is available to run a non-cooled compresor for helium. The pressure is to be increaded from 80 kPa to 120 kPa. If the compressor is 70% efficent, calculate the volume flow rate into the compressor.
how many cubic feet of seawater, density 60 lb/ft^3, must be processed to recover 1 ton of magnesium, 1,272 ppm?
The headloss per meter for galvanized iron pipe (.02 m diameter) hL= 0.110m and for (0.15m diameter) hL= 0.490m. Determine the trade off between the cost and the head loss (hL).
The 70 m tall tower is supported by three cables that exert forces FAB, FAC, and FAD on it. The magnitude of the force FAB is 2 kN. The x and z components of the vector sum of the forces exerted on the tower by the three cables are zero. What are ..
A suburban street receives storm water runoff at a rate of 2.0 L/m-s (one each side). the street has a slope of .8 percent and a cross slope of 2 percent, n = .013.
An engineering student is driving on a level roadway and sees a construction sign 180 m ahead in the middle of the roadway. The student strikes the sign at 56 kph. If the student was traveling at 90 kph when the sign was first spotted, what was th..
Below a discharge from a wasterwater treament plant , an 8.6km stream has a reoxygenation constant of .4 d^-1, a velocity of .15m/s, a dissolved oxygen concentration of 6mg/L, and an ultimate demand of 25mg/L.
The potentiometric surface elevations at two observation wells 1000 m apart are 52.35 m and 56.90 m. If the horizontal hydraulic conductivity of the auquifer is 25 m/ day determine the flow rate per unit width of the auquifer.
Weather records for a certain region indicate that there is a tendency for two hot summers to occur in a row. From the statistics for the region, the following information has been es tahlished
At the design flow, it is intended to have a relative depth of 0.8. At what minimum slope can it be laid such that the velocity is at least 2 ft/s at design flow and depositied solids will be scoured out by the deisgn flow
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd