Calculate the npv and irr without mitigation

Assignment Help Finance Basics
Reference no: EM13296968

A mining company is considering a new project. Because the mine has received a permit, the project would be legal; but it would cause significant harm to a nearby river. The firm could spend an additional $11 million at Year 0 to mitigate the environmental problem, but it would not be required to do so. Developing the mine (without mitigation) would cost $69 million, and the expected net cash inflows would be $23 million per year for 5 years. If the firm does invest in mitigation, the annual inflows would be $24 million. The risk adjusted WACC is 11%. Calculate the NPV and IRR with mitigation. Round your answers to two decimal places. Enter your answer for NPV in millions. For example, an answer of $10,550,000 should be entered as 10.55. NPV $ million IRR % Calculate the NPV and IRR without mitigation. Round your answers to two decimal places. Enter your answer for NPV in millions. For example, an answer of $10,550,000 should be entered as 10.55. NPV $ million IRR %

Reference no: EM13296968

Questions Cloud

Who has been offered a 5-year contract at a remote location : Suzanne is a recent chemical engineering graduate who has been offered a 5-year contract at a remote location. She has been offered two choices. The first is a fixed salary of $75,000 per year.
Explain what are the other other concentration units : What are the other other concentration units. 1. mass percent 2. mass of H2SO4 in 1 L 3. mass of 1 L 4. mass percent 5. kg H20 6. molality 7. mole fraction H2SO4
What is the stationing of the pt on the same highway : A crest vertical vurve and a horizontal curve on the same highway have the same design speed. The equal-tangent vertical curve connects a +3% initial grade with a +1% final grade and has a PVC at 101+78 and a PVT at 106+72
How to calculate the equilibrium temperature : A 45.3 g sample of Al at 95.5 oC is added to 182.7 g of water that is initially at 20.5 oC. The specific heat of Al and water are 0.90 J/(goC) and 4.184 J/(goC), respectively. Calculate the equilibrium temperature.
Calculate the npv and irr without mitigation : Calculate the NPV and IRR without mitigation. Round your answers to two decimal places. Enter your answer for NPV in millions. For example, an answer of $10,550,000 should be entered as 10.55. NPV $ million IRR %
Explain the equilibrium constant for the following reaction : The equilibrium constant, Kc for the reaction: Ni(s) + 4CO(g) Ni(CO)4(g) is 5.0 × 104 at 25°C. What is the equilibrium constant for the following reaction? Ni(CO)4(g) Ni(s) + 4CO(g)
Find the maximum rectangular area : Find the maximum rectangular area available within the annular footprint of the robot's workspace and formulate the optimal design problem. Clearly state the objective function, design variables and constraints.
Determine the location of the deepest point of the curve : The elevation of the curve at its deepest point must be at elevation 168.00 feet or higher to clear a major pipe installation. If the PVC is at station 0+00 with an elevation of 176.20 feet, determine the location of the deepest point of the curve..
How far up the incline will the block go : A 1.93kg block is placed against a compressed spring on a frictionless 27degree incline. How far up the incline will the block go before coming to rest

Reviews

Write a Review

Finance Basics Questions & Answers

  What trades must the investor make now in order to return

What trades must the investor make now in order to return to an equally-weighted portfolio?

  Show the functions of the federal reserve board

Show the major functions of the Federal Reserve Board and recognize the role of the FED as the commercial bank of the US Treasury

  What is the beta of the company for which she works

The investor calculates that the required return on her portfolio is 15%. what is the beta of the company for which she works?

  Statement regarding 401(k) plans

Determine the correct statement regarding 401(k) plans

  What is progressive cost of equity and corporate cost

The CFO estimates that the present value of any future financial distress costs is $8 million, and that the probability of distress increases with the amount of debt in the following steps.

  Compute the pv of the bond at period 1

Bond valuation of case 3: r d has increased from 10% to 12% at period 1. The initial who time to maturity was 15 year. INT=$100 and M=$1000. Compute the PV of the bond at period 1.

  Compute variance of the returns on common stock

The rate of return on the common stock of Flowers by Flo is expected to be 14 percent in a boom economy, 8 percent in a normal economy, and only 2 percent in a recessionary economy.

  What is the stock expected capital gains yield

If D1 = $1.50, g (which is constant) = 6.5%, and P0 = $56, what is the stock's expected capital gains yield for the coming year?

  Preparing section for the training document

Butler just came back from his meeting with the training coordinator. They now want to include some additional items in the upcoming training session.

  What is jake weighted average cost

The bonds are selling at 97.5% of face value. The company's tax rate is 33%. What is Jake's weighted average cost of question.

  How financial intermediaries affect the availability

Describe how financial intermediaries affect the availability of financing for corporations and determine the impact you think the Internet will have on the activities and importance of intermediaries.

  Why is there a cost of retained earnings

Equity can be raised in two ways; by retaining some of the current year's earnings and by issuing common stock. Please explain.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd