Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The vertical curve passes over an existing underground waterline that runs perpendicular to the roadway at station 20+91.00. The top of the waterline is at elevation 407.50 feet. The minimum clearance between the roadway and the waterline must be 6 feet. The PVI is located at station 19+00.00 with elevation 420.50 feet. The design speed of the curve is 55 mph, g1 is +3%, and g2 is -3.0%. PRT= 2.5 sec, 0.35 = friction factor.
a. Calculate the minimum length of this curve.
b. Determine if the clearance between the vertical curve and the waterline is adequate.
c. If the clearance is not adequate in this type of case what modification to L would be required to increase the clearance? Discuss possible ramifications of making this modification. (Do not need to do any calculations in part c).
Water flows through the pipe contraction shown. for the given 0.2 m difference in the meter level, determine the flowrate as a function of the diameter of the small pipe, D.
The train is travelling at 0.8 m/s i relative to a man on the side of the tracks. What is the speed of the bug as seen by the man at the side of the tracks? What is the speed of the train relative to (or as seen by) the bug?
a store charges 1.25 % interest per month in credit purchases. This is equivalent to: what nominal annual interest rate, effective annual interest rate, and effective monthly interest rate
What diameter of vertical tube would allow mayonnaise ( p = 1200 kg/m3) to flow under its own weight
A space is at a temperature of 75 F, and the relative humidity is 45 percent. find the partial pressures of the air and water vapor
Using the following assumptions, determine the solids retentiontime, the cell wastage flow rate, and the return sludge flow ratefor the Jambalaya shrimp processing plant WWTP.
A very long rectangular channel connects two reservoirs and has a longitudinal slope of 0.005. The channel has a width of 10 m and a Manning's n of 0.030.
An enginnering student has just finished the freshman year and has received an offer of $20,000 per year in a full-time job, with prospects of salary increasing 3% per year until retirement after 33 years. If employement is taken, the student will li..
Four strain gages are mounted at 90o intervals around the circumference of a 100-mm steel shaft. E= 200 GPa, and ? = 0.3. All gages are oriented at an angle of 45o with respect to the longitudinal axis of the shaft.
Starting from x = 0 with no initial velocity, the acceleration of a race car is defined by the relation a = 6.8e-0.00057x, where a and x are expressed in m/s2 and meters, respectively. Determine the position of the race car when v = 30 m/s.
For a steel stack that exhaust 1200 m^3/min of gases at 1atm and 400 K, calculate the inner diameter if you are designing for a maximum expected wind speed at the stack of 12m/s.
A water main is used to refill an elevated storage tank during the night. a 100 ft long, 12 in steel pipe (ks=.06 mm) connects to the booster pump that provides a pressure of 75 psig at the pump outlet.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd