Calculate the flow rate on each approach lane

Assignment Help Civil Engineering
Reference no: EM13841967

Problem 1 - Roundabouts

As part of the transport impact assessment for a proposed residential development off Zinglemann Road at Carmzow, you have been asked to evaluate the performance of a singlelane roundabout under 2018 weekday AM peak hour traffic projections as a possible intersection form to replace an existing unsignalised cross intersection, which has been found to be inadequate for the proposed conditions. The figure below illustrates the proposed intersection form, turning movements and flow rates.

1463_Calculate the flow rate on each approach lane.png

Figure Lane allocation and control, turning movement flow rates (veh/h)

The geometric characteristics of the roundabout are listed in the table below.

Criterion  multi-lane roundabout 
Approach lanes  1 east and west, 1 north and south 
Circulating lanes  1
Circulating lane width  6.5m 
Central island diameter  10m 
Entry lane width  4.1m 
Approach speed  60km/h 
Negotiation speed  30km/h 

Assume that any pedestrians (flows not shown) must give way to vehicle traffic. Stating any other assumptions you need to make, conduct your roundabout intersection analysis in a table according to the following procedure:

(i) Calculate the circulating flow past each approach to the roundabout;

(ii) Calculate the flow rate on each approach lane;

(iii) Estimate the headway distribution characteristics of the circulating stream past each approach;

(iv) Estimate the theoretical capacity and degree of saturation of each approach lane. Compare with the roundabout practical degree of saturation of 0.85;

(v) Estimate the average queuing delay for all vehicles on each approach lane;

(vi) Estimate the 95th percentile design queue length in each approach lane;

(viii) Comment on the overall operation of the proposed roundabout for the conditions analysed, including the amount of spare capacity to accommodate traffic growth.

- Use a tabulated spreadsheet to complete this problem.

- Numbering of the movements in your response must be the same as those shown here. In your spreadsheet, your movement calculations must be ordered in rows from the lowest to highest movement down the page. For each movement clearly carry your calculations in rows right across the spreadsheet and be consistent with placement of these calculations for all movements.

- In your spreadsheet, your lane calculations must be ordered in rows according to the following convention: S1, E1, N1, W1.

- Use sensible rounding when displaying answers on your spreadsheet (Excel has a displayed rounding tool, while still carrying the values to a high level of significance throughout the calculations). For example, flows in whole veh/h or 0.xxx veh/s, delays to whole s, and queue lengths to the next whole veh.

- Submit clearly labelled your electronic spreadsheet on electronic media with your hard copy so that your working can be tracked.

Problem 2 - Signalised Intersections

As part of the transport impact assessment, you also have been asked to evaluate the performance of a signalised intersection at the cross intersection of Zinglemann Road and Old School Road under the 2018 weekday AM peak hour traffic projections shown in the following figure, as a possible replacement. The intersection geometry, movement numbers and flows, and signal phasing arrangement are shown in the following figure and table.

1997_Calculate the flow rate on each approach lane1.png

Figure Proposed Signalised Intersection Information

The required parameters for the proposed signalised intersection control are given as follows.

Table Signalized Intersection Parameters

Criterion  Value 
Environmental class: Old School Rd 
Environmental class: Zinglemann Rd 
Grade: Old School Rd  0%
Grade: Zinglemann Rd  -2% (south approach only) 
Curve Radii (all approaches)  Nil tight 
Pedestrian crossings  Nil 
Heavy vehicles  10% (north approach only) 
Yellow time  4s 
All-red time  2s 
Minimum green time  2s 
Lost time (all movements)  (assume same as intergreen time) 
Practical Degree of Saturation  0.85
Optimal Cycle Time k Value  0

Other requirements

- Use a tabulated spreadsheet to complete this Problem.

- Reproduce the following tables for inclusion of your calculations in your spreadsheet.

- Numbering of the movements in your response must be the same as those shown here.

In your spreadsheet, your movement calculations must be ordered in rows from the lowest to highest movement down the page. For each movement clearly carry your calculations in rows right across the spreadsheet and be consistent with placement of these calculations for all movements.

- In your spreadsheet, your lane calculations must be ordered in rows according to the following convention: S1, S2...; E1, E2...; N1, N2...; W1, W2...

- Use sensible rounding when displaying answers on your spreadsheet (Excel has a displayed rounding tool, while still carrying the values to a high level of significance throughout the calculations): Display flow rate to three decimal places, probability to three decimal places; degree of saturation to two decimal places; delay to nearest whole second; queue length rounded upwards to nearest whole vehicle.

- Submit clearly labelled your electronic spreadsheet on electronic media with your hard copy so that your working can be tracked.

(i) Find the base saturation flow rates for each lane.

(ii) Lane width and gradient factors adjustment.

(iii) Traffic composition factor adjustment.

(iv) Flow ratio calculation.

(v) Critical movement identification and intersection flow ratio.

(vi) Cycle time calculation.

Calculate optimal cycle time, practical cycle time, and cycle time to use.

(vii) Green time allocation.

(viii) Average delay time and level of service.

(ix) Compare the signalised intersection performance for the 2018 opening year weekday AM peak hour with that of the existing unsignalised intersection from Problem 2 and that of the roundabout from Problem 1.

Verified Expert

Traffic from a scientific technical point of view which demands the series of variable components such as series of concepts, variables and the parameters which allow to understanding and approach the solution to solve the traffic problem. The fundamental of traffic parameters is traffic flow, speed, Density of Traffic, Traffic volume, Equivalent hour flow, Hour Flow, Peak hour flow, Daily flow, Maximum Daily Flow Traffic composition.

Reference no: EM13841967

Questions Cloud

Develop a marketing plan for a global airline company : Develop a marketing plan for a "global" airline company that is localising the global. for example lufthansa in nigeria. The plan should identify exisitng strategies & ways in which the company could generate value for stakeholders in a specific m..
Integer programming model to help rowntown cab schedule : Rowntown Cab Company has 70 drivers that it must schedule in three 8-hour shifts. However, the demand for cabs in the metropolitan area varies dramatically according to time of the day. The slowest period is between midnight and 4:00 A.M. Formulate a..
Why is social media marketing different : "Why Is Social Media Marketing Different?" Go to the Daily Mail website, located here, or use other business related websites of your choice to search an article concerning a company's social media marketing campaign and its traditional media mark..
How many subsets does : How many subsets does [n] have that contain at least one of the elements 1 and 2?
Calculate the flow rate on each approach lane : Calculate the circulating flow past each approach to the roundabout and calculate the flow rate on each approach lane - Calculate the flow rate on each approach lane
Authority over human resources and employee : You are an engineer with authority over human resources and an employee comes to you and says, “I want to tell you something about someone, but you can’t tell anybody.” He then reveals that someone pushed another employee in the company kitchen. What..
A school has 105 students, and seven classes : A school has 105 students, and seven classes. If each student takes three classes, and each class is taken by the same number of students, how many students are taking each class?
Dictum of management theory : It has long been a dictum of management theory that leaders must adapt their behavior to fit the specifics of a situation. Discuss whether transformational leadership is appropriate for all occasions. In which situations might it not be effective and..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Using newton raphson method determine highest real root of f

determine the highest real root of f(x)= 0.95x^3 - 5.9x^2 +10.9x-6: (a)graphically. (b) using the newton raphson method(three iterations, xi= 3.5). (c) using the secant method(three iterations, xi-1= 2.5 and xi= 3.5).

  Calculate the angular acceleration of link ab and link bc

If OA has a constant counterclockwise angular velocity of 10rad/s, calculate the angular acceleration of link AB and link BC for the position where the cordinates of A are x=-60mm and y = 80mm.

  The surface elevation of the downstream resevoir

A 0.5 m diameter concrete pipe (5.0 cm wall thickness with rigid pipe walls) carries water 600 m before discharging it into another reservoir. The surface elevation of the downstream resevoir is 55 m lower

  Determine the minimum horsepower input to the pump

A pump delivers 60 degrees F water at 2000 gpm through a vertical pipeline 300 ft high. Find the minimum horsepower input to the pump. Assume that atmospheric pressure exists at both the pump inlet and the pipeline outlet.

  Compute the new unit weight and moisture content of soil

A sample of soil was compacted into a 945 ml.laboratory mold. The mass of the compacted soil was 1850 grams and its moisture content was 13.1%. Specific gravity of solids is 2.70, Compute the moist unit weight, dry unit weight, and degree of satu..

  Determine the capitalized cost of the project

The lubbock board of city development has decided to ask the city council to construct a tunnel under the snowcapped mountain range east to downtown lubbock so that out of town visitors can reach historic prairie dog town without becoming lost and en..

  Determine what is the necessary volume for the basin

A dry detention basin is to be designed for a 70 ha residential development. The runoff coefficient for the area is 0.3 and the average rainfall during the year is 4 cm. What is the necessary volume for the basin

  Calculate the additional stress as a function of depth

Calculate the additional stress as a function of depth that a temporary construction wall , like that shown in Figure As 1, must take as the result of a crane sustained in the zone above it.

  What is stress to load ratio at depth of 2b below the centre

for a uniformly loaded square area, what is the stress to load ratio at a depth of 2B below the CENTER of the loaded area

  Calculate the time needed for the particles to set

For a temperature of 10 degree C, calculate the time needed for the following particles to settle 0.3m: a) a 20um mineral particle with a specific gravity of 2.1, and b) a 2 um organic particle with a specific gravity of 1.2

  Determine the pressure at the point in n per m2 gage

Near the point (x, z) =(3,2) in a flow with a zero y-component (v=0), the velocity component are described by u =3x-3z, and w = 6-4z+ x. The velocities u and w are in m/s and are in the x- and z- directions, respectively.

  Determine the distance x and the magnitude and direction

the three forces of magnitude P can be replaced by a single, equivalent force R acting at point A. Determine the distance x and the magnitude and direction of R

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd