Calculate the flow rate in the pipe

Assignment Help Civil Engineering
Reference no: EM13544514

Two reservoirs are connected by a pipeline. The pipeline is 1 m in diameter and has a friction factor of 0.03. The elevation difference between the reservoirs is 30 m. The two reservoirs are 5 km apart. The sum of the minor loss coefficients is 34. Calculate the flow rate in the pipe.

Reference no: EM13544514

Questions Cloud

Submit annotated bibliography source #2 : Submit Annotated Bibliography Source #2 on the article The M3-Competition: Results, Conclusions, and Implications. Milestone Three: Resource #3
What is the height of the lighthouse above sea level : An observer standing on a beach can just see the top of a lighthouse 15 miles away. The eye height of the observer abouve sea level is 5.7 feet. what is the height of the lighthouse above sea level? Show your work.
Discuss the difference between how accountants and economist : Discuss the difference between how accountants and economists calculate profit giving example of costs each might use in this calculation.
Describe economies and diseconomies of scale : Explain the law of diminishing marginal returns and Describe economies and diseconomies of scale
Calculate the flow rate in the pipe : Two reservoirs are connected by a pipeline. The pipeline is 1 m in diameter and has a friction factor of 0.03. The elevation difference between the reservoirs is 30 m. The two reservoirs are 5 km apart. The sum of the minor loss coefficients is 34. C..
Is climate change a real threat to the global economy : Is climate change a real threat to the global economy?
What is the total delay to the passengers in the 20 depart : An airport runway has a capacity of 60 operations (ie landing and take-offs) per hour. In a particular hour, there are 30 landings evenly spaced over the hour.
Which arguments might each dismiss : Which arguments might each dismiss?
Determine the force in wire ab : The specified concrete strength fc for a new building is 6000 psi. Calculate the required average strength fc for the concrete ( a) if there are no prior test results for concrete with a compressive strength within 1000 psi of fc made with sim-ilar m..

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Minimizing the tension tab

What should TAC , TAB and the acute angle ? between TAB and the vertical to minimize the tension TAB ? Take o and W = 1,000 N. Hint: Consider various possible force triangles and decide on inspection how to minimize TAB.

  What is the specific discharge in this rectangular channel

A large concrete channel holds a hydraulic jump in which the subcritical depth of flow is 2.5 m.  If 40 percent of the specific energy in the flow is lost through the hydraulic jump, what is the specific discharge in this rectangular channel?

  Find the pressure head at the lower end of the pipe

A vertical pipe of 4ft diameter and 60 ft long has a pressure head of 22.7 ft of water at its upper end. when the flow of water through it is such that the mean velocity is 16 fps, the pipe friction head loss is hf = 2.8 ft.

  What type of aquifer material do you expect in this location

The elevation of water in well A is 300m above sea level and well B is 350m above sea level. The wells are 45m apart. A dye test reveals that the specific discharge between the two wells is about 2.75m/day. What type of aquifer material do you expect..

  What is the maximum shear stress in the liquid

If the viscosity of the liquid is 10–3 N-s/m2, what is the maximum shear stress in the liquid?

  What is the market value of the plants electricity annually

Biomass is increasingly used as a fuel to produce power and heat. A sugarcane-­? processing mill is powered by a biomass power plant with 140 MW of electricity and with 60 MW of heat in the form of steam for sugar extraction from the cane.

  Determine the new q through the system at c

Parallel pipes, fixed overall H, ?EGL or hl = 75'. Elevated Tank A water surface is at El 625, 3000' away is Tank B with free surface El 550 They are connected by a 12" dia cast iron pipe.

  Design the temperature reinforcement for a highway

Design the temperature reinforcement, tie bars, and dowel bars for a highway concrete pavement with 13 inch slabs, f'c=3500 psi, traverse joints at 35 ft apar,t and with 3 12 ft lanes each way. Use grade 60 steel

  Calculate what is the volume of rock in the rock pile

A storage pile of crushed rock is 100ft by 100ft square at its base and 50 ft by 50 ft square on the top. The pile is 25 ft high. What is the volume of rock in the rock pile

  What would scientist expect the barometer reading to be

A scientist plans to build a water barometer. When the atmospheric pressure is 990 mb abs and the water temperature is 70 degrees Celsius, what would you expect the barometer reading (water rise) to be

  Determine the alkalinity and ph of the mixture

Assuming that carbonate species dominate the acid/base behavior of boh solutions and that no gas transfer occurs when they are mixed, determine the alkalinity and pH of the mixture.

  How is raw pig iron extracted from iron oxide ores

(a) How is raw pig iron extracted from iron oxide ores (b) Write a typical chemical reaction for the reduction of iron oxide (Fe2O3) by carbon monoxide to produce iron.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd