Two reservoirs are connected by a pipeline. The pipeline is 1 m in diameter and has a friction factor of 0.03. The elevation difference between the reservoirs is 30 m. The two reservoirs are 5 km apart. The sum of the minor loss coefficients is 34. Calculate the flow rate in the pipe.

Reference no: EM13544514

Questions Cloud

Submit annotated bibliography source #2 : Submit Annotated Bibliography Source #2 on the article The M3-Competition: Results, Conclusions, and Implications. Milestone Three: Resource #3
What is the height of the lighthouse above sea level : An observer standing on a beach can just see the top of a lighthouse 15 miles away. The eye height of the observer abouve sea level is 5.7 feet. what is the height of the lighthouse above sea level? Show your work.
Discuss the difference between how accountants and economist : Discuss the difference between how accountants and economists calculate profit giving example of costs each might use in this calculation.
Describe economies and diseconomies of scale : Explain the law of diminishing marginal returns and Describe economies and diseconomies of scale
Calculate the flow rate in the pipe : Two reservoirs are connected by a pipeline. The pipeline is 1 m in diameter and has a friction factor of 0.03. The elevation difference between the reservoirs is 30 m. The two reservoirs are 5 km apart. The sum of the minor loss coefficients is 34. C..
Is climate change a real threat to the global economy : Is climate change a real threat to the global economy?
What is the total delay to the passengers in the 20 depart : An airport runway has a capacity of 60 operations (ie landing and take-offs) per hour. In a particular hour, there are 30 landings evenly spaced over the hour.
Which arguments might each dismiss : Which arguments might each dismiss?
Determine the force in wire ab : The specified concrete strength fc for a new building is 6000 psi. Calculate the required average strength fc for the concrete ( a) if there are no prior test results for concrete with a compressive strength within 1000 psi of fc made with sim-ilar m..

Reviews

Write a Review

Civil Engineering Questions & Answers

  How many grder hours will be required to accomplish the job

A motor grader will require 2 pases at 3 mph., 2 pases at 4 mph., and 2 passes at 5.5 mph. to accomplish the work How many grder hours will be required to accomplish this job if the job efficiency factor is 0.75.

  What was the distance between the markers

The acceleration of a particle traveling along a straight line is A= (0.02e^t) m/s^2, where t is in seconds.  If v=0, s=0 when t = 0, determine the velocity and acceleration of the particle at S= 4m

  Determine the mass flowrate through boiler

The inlet of loe pressure turbine is 500Kpa and 500°C. Condenser operates at 10 Kpa. Determine the mass flowrate through boiler needed to produce 5000KW of power.

  Calculate the approximate alkalinity of water containing ion

Calculate the approximate alkalinity (in mg/L as CaCO3) of a water containing 120 mg/L of bicarbonate ion and 15 mg/L of carbonate ion.

  Determine the maximum speed of the train

A typical motorcycle emits about 20 g of CO per mile. What volume of CO would a 5-mile trip produce after the gas coolsto 25°C (at 1 atm) and per meter of distance traveled, what volume of air could be polluted to the air quality standard of 9ppm?

  Determine what is the departure rate at a parking lot

The arrival rate at a parking lot is 6 veh/ min. Vehicles start arriving at 6: 00 P. M., and when the queue reaches 36 vehicles, service begins. If company policy is that total vehicle delay should be equal to 500 veh-min

  Determine the amount of cover over a culvert

A vertical curve of 600 ft in length is used to connect two tangents with the following locations: Tangent 1.- Point 1, Sta = 59+00, El = 1250.0' Point 2, Sta = 72+00, El = 1190.0' Tangent 2.- Point 1, Sta = 72+00, El = 1190.0' Point 2, Sta = 84+0..

  What is magnitude of hydrostatic force on triangular gate

A vertical gate keeps water from flowing in a triangular irrigation channel. The channel has a 4-m top width and a 3-m depth. If the channel is full, what is the magnitude of the hydrostatic force on the triangular gate and its location

  Is inventor claim valid to have an invented adiabatic flow

An inventor claims to have invented an adiabatic steady-flow device with a single inlet-outlet that produces 100 kW when expanding 1 kg/s of air from 900 kPa and 300 degrees C to 100 kPa.

  A simply supported square timber beam is span 50m and

a simply supported square timber beam is span 5.0m and spaced 3.0m the dead load and imposed load was found to 1.5knm2

  Find pipe diameter if it is to be full with steady rainfall

Rainwater runoff from a 200 x 500 ft parking lot is to drain through a circular concrete pipe that is laid on a slope of 5 ft/mi. Determine the pipe diameter if it is to be full with a steady rainfall of 1.5 in/hr

  Determine normal stresses induced in steel and in concrete

The concrete post (Ec=3.6*10^6 psi and Ac= 5.5*10^-6/degrees F) is reinforced with six steel bars. each of 7/8-in diameter (Es=29*10^6 psi and As=6.5*10-6/ degrees F).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd