Calculate the depth of flow 2 km upstream of the dam

Assignment Help Civil Engineering
Reference no: EM13313900

A 12.0 m rectangular channel, having a bed slope of 50 cm/km and a Manning roughness coefficient of 0.015, conveys water at a normal depth of 1.0 m. A dam is built across the channel at which the water depth is 2.0 m. Calculate the depth of flow 2.0 km upstream of the dam.

Reference no: EM13313900

Questions Cloud

Estimate what is the total volume of runoff : It rains 3.0 in. on a 20.0 acre watershed. What is the volume of rainfall excess if 30% of the watershed area is a lake and infiltration on the soil is estimated at 1.0 in. What is the total volume of runoff
Develop a communication plan for the company : Develop a communication plan for the company
What is the minimum bottom width to effect the depth : A trapezoidal channel is to be designed to carry a discharge of 250 cfs at a normal depth of 3.5 ft. The channel is running on a slope of 0.005 ft/ft and the side slopes can be no steeper than 2.5 H on 1 V.
Find the conjugate depths of the jump formed in a channel : The discharge through a 6.0 ft wide rectangular channel is 200.0 ft3/s. Find the conjugate depths of the jump formed in such a channel if 3.5 ft of energy head is lost through it.
Calculate the depth of flow 2 km upstream of the dam : A 12.0 m rectangular channel, having a bed slope of 50 cm/km and a Manning roughness coefficient of 0.015, conveys water at a normal depth of 1.0 m. A dam is built across the channel at which the water depth is 2.0 m.
Calculate the resistance per unit length of the wire : When a potential difference of 2 V is applied across the ends of a wire of 5 m length, a current of 1A is found to flow through it. Calculate: the resistance per unit length of the wire
How much time does it take for the ball to hit the ground : A ball rolls off a platform that is 6.8 meters above the ground. The ball's horizontal velocity as it leaves the platform is 7.4 m/s.How much time does it take for the ball to hit the ground
Evaluate the concentration of hcl : Determine the moles of NaOH b. Determine the moles of HCl c. Calculate the concentration of HCl
What is the speed at the bottom of the swing : A simple pendulum 2.0m in length, is released with a push when the support string at an angle of 25 degrees from the vertical. What is the speed at the bottom of the swing

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the centroid-moment of inertia and section modulus

THE HOME DEPOT IN RED HOOK ,BROOKLYN IS LOOKING TO RENOVATE THEIR STEEL ROOF TRUSS.YOU HAVE BEEN ASKED TO DETERMINE THE CENTROID,MOMENT OF INERTIA,SECTION MODULUS AND RADIUS OF GYRATION OF THE DOUBLE ANGLE.

  Determine what will be the hydraulic conductivity of the gcl

If this GCL is used as a liner beneath a 55-ft high landfill with a waste unit weight of 45 lb/ft3, what will be the hydraulic conductivity of the GCL at the bottom of the landfill

  Average velocity and crosssectional area

Calculate the average velocity (rnps), crosssectional area (rn"), and depth (m) for the stretch. To make these estimates, assume that the stretch can be idealized as a rectangular channel.

  Determine the dead load per unit of length on a beam

A floor system consists of wide flange steel beams (W18 x 60) equally spaced at 8ft center to center. A 6inch reinforced concrete slab spans between beams. The bottom of the slab is coated with plaster and the top of the slab has ¾inch hardwood fl..

  Find how many ml of water will it take to get 10 pounds

How many mL of water will it take to get 10 pounds of dry aggregate to a moisture content of 5%. 1 kg=2.2 pounds

  Determine the distances the spacecraft must be from earth

consider a spacecraft that is positioned directly between the earth and moon.the mass of the moon's is approximately 7.35 X10^22 kg, and at the instant under consideration, the moon is 3.8 X 10^8 km from earth.

  Calculate the area of reinforcement required

A short Reinforced Concrete column is 300mm x 400mm. It is required to carry an ultimate load of 1500kN and an ultimate major axis bending moment of 300kNm. Calculate the area of reinforcement required.

  Find the steel area required for beam

Find the steel area required for beam which has b = 10 in. and d = 17.5 in. to carry a factored load moment of 1,600 in-kips.

  Estimate the first derivative of f

Write a script newquot.m that uses the Newton quotient, [f (x + h) - f (x)]/h, to estimate the first derivative of f (x) = x3 at x = 1, using successively smaller values of h: 1, 10-1, 10-2, and so forth. Use a function M-file for f (x).

  Determine the height of capillary rise to smooth glass

Plot the distribution of vertical effective stress and porewater pressure with depth if the void ratio of the sand is 0.6 and the degree of saturation is 90%. Neglect pore air pressure

  Maximum rod diameter on lathe machine

If the tensil testing machine can apply no more than 925 lbs. of force to the specimen, calculate the maximum rod diameter that should be used. (precision 0.000)?

  Determine the net rate of flow of linear momentum

Determine the net rate of flow of linear momentum through the control surface.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd