Calculate the cost per activity for each cost pool

Assignment Help Managerial Accounting
Reference no: EM131366080

Management Accounting Assignment

The Genre company is the manufacturer of  two products the Basic and the Advanced .Details of production data and product cost data are as follows:

                                             Basic               Advanced
Direct material                         40                  60
Direct labour                           2 hours           3 hours
Manufacturing overhead           2 hours           3 hours
Direct labour cost per hour       $15 per hour   $15 per hour
Production                              2000 units       10000 units

Manufacturing overhead has traditionally used  direct labour hours to calculate the predetermined  overhead  rate.

The Manufacturing overhead budget is as follows:

Set up costs                     $360,000
Engineering costs              180,000
Machine related costs         900,000
Plant related costs             192,000
Total                                $1,632,000

The Genre company has traditionally priced its products at  120 per cent of manufacturing cost .

Recently the Genre company has found it has had difficulty selling its advanced product with a competitor entering the market from overseas and making substantial sales at a price considerably below Genre's price for the Advanced product .

The CEO of Genre ,Jane Monk, cannot understand  how this could be and has asked you to investigate the matter.You start to examine some of the data and decide  to check out a new approach to allocate costs called Activity Based Costing .You have managed to identify the following information:

Activity Cost Pool          Cost Driver                           Budgeted level of Cost Driver
Set up costs                 Number of production runs    80 runs
Engineering costs          Engineering changes             200 engineering changes
Machine related costs     Machine hours                      18,000 hours
Plant related costs         Floor space in sq ft               3,840 sq ft

In addition the following information has been determined :

--The Basic product is manufactured in production runs of 50 units each and the Advanced product is manufactured in 250 unit batches

--75% of the engineering changes are used by the Basic product with the remaining 25% used by the Advanced product

--Each Basic product requires 4 machine hours whereas each Advanced product requires 1 machine hour

--The plant has 3,840 square feet of floor space with 80% of it used in the production of the Basic product

Required:

Using the information above and your knowledge of Activity Based  Costing you are required to provide answers to the following:

(a) Calculate the predetermined overhead rate that would be used under traditional overhead costing.

(b) Calculate the product cost per unit for the Basic and Advanced products under traditional costing.

(c) Calculate the price that would be charged  for the Basic and the Advanced products under traditional costing.

(d) Calculate the cost per Activity for each cost pool.

(e) Calculate the cost per unit for Basic and Advanced  products using Activity Based Costing.

(f) Based on your calculations with respect to Basic and Advanced products comment upon whether either product has been overcosted or undercosted.

(g) Discuss the benefits that can be obtained from using an Activity Based Costing system and whether it would be useful in costing the current products.

Reference no: EM131366080

Questions Cloud

Find the energy transfer per unit mass of fluid : The absolute velocity leaving the rotor at section (2) is radial with a magnitude of 12 m/s. Determine the energy transfer per unit mass of fluid flowing through this turbine if the fluid is (a) air, (b) water.
What part of the book is most effective in accomplishing : identify the authors mission (task and purpose) in writing this book.What part of the book is most effective in accomplishing the authors mission.What does the author assume to be true in order to accomplish his mission? does the author validate the..
Difference between qualitative and quantitative problems : Explain the difference between qualitative and quantitative problems and give an example of each one that is related to a kinesiology topic.
Which analyze and critique the whole work : A review of a play or musical should also critique the production as a whole, in addition to its variety of elements. The purpose of a review is to provide a potential audience with an unbiased opinion of the production, supported by facts.
Calculate the cost per activity for each cost pool : Calculate the cost per Activity for each cost pool. Calculate the cost per unit for Basic and Advanced  products using Activity Based Costing.
Mates with a female skunk of genotype : A male skunk of genotype FG/fg mates with a female skunk of genotype fg/fg. What genotypes of baby skunks should they produce, and in what ratios?
Write an essay on the given topic : Present a revised formulation of the ethical question and introduction to the topic.- Explain the kind of reasoning you think is the best way to approach this question, and how that reasoning supports the position you think is strongest.
Calculate the work per unit mass delivered at the shaft : Sketch and label velocity triangles for the flow entering and leaving the rotor row. Use V for absolute velocity, W for relative velocity, and U for blade velocity. Assume flow enters and leaves each blade row at the blade angles shown.
Give the answer of muliple choice question : The technique whereby a protagonist speaks directly to the audience by expressing some uncensored feeling or thought is:Ernie Berne's position was that people were:Which is true of the application of cognitive behavioral techniques in a group?

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Prepare required journal entries for 2014 and 2015

Prepare required journal entries for 2014 and 2015. Be sure to indicate whether each entry should be made to an unrestricted or temporarily restricted fund and

  Evaluate production situations using economy of scale

Compare and contrast how production analysis is carried out and be able to evaluate production situations using economy of scale, elasticity and other analytic tools.

  Prepare a cash budget for the period october to december

Prepare a cash budget for the period October to December 2009, indicating the extent of the bank facilities the company will require at the end of each month:

  Who is benefited and who is harmed

Who are the stakeholders in this situation? Who is benefited and who is harmed and was Ron ethical in the way he performed the time study test?

  Determining cost of goods manufactured and sold

The following information pertains to pandey manufacturing company for March 2012. Assume actual overhead equaled applied overhead.

  Suggest four non monetary measures that greg conklin

Suggest four non monetary measures that Greg Conklin can include in the annual budget for Xtreme Board Company.

  Ledger accounts

Post to the ledger accounts. Use J1 for the posting reference. Use the following additional accounts: No. 407 Service Revenue, No. 615 Depreciation Expense, No. 631 Supplies Expense, No. 726 Salaries and Wages Expense, and No. 729 Rent Expense.

  Determine the contribution margin for each boat

Determine a method to allocate fixed costs and determine the profitability by boat. Make sure you disclose the method you use to allocate fixed costs.

  High-low method of cost estimation

Describe how the high-low method of cost estimation can be used in estimating the fixed cost component of a mixed cost in a business.

  Produced the larger amount of assets on the balance sheet

Which method, FIFO or LIFO, produced the larger amount of assets on the balance sheet?

  Explain what the large amount of sales returns

Explain what the large amount of sales returns and allowances suggest that Bill Slick might have done. Determine how Yancy could protect itself from a manager who behaved as Bill Slick did.

  Calculate the predetermined overhead rate

How to calculate the predetermined overhead rate given the companys flexible budget.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd