Calculate the coefficient of volume compressibility

Assignment Help Civil Engineering
Reference no: EM13543429

In an oedometer test, the void ratio of a clay sample changed from 1.62 to 1.41 as the vertical effective stress imposed on the sample was increased from 100 kPa to 200 kPa. Later on, the vertical effective stress on the sample was decreased by 100 kPa, resulting in an increase in void ratio to 1.44. Calculate the coefficient of volume compressibility (mv), the compression index (Cc), and the expansion index (Ce).

Reference no: EM13543429

Questions Cloud

Determine the vertical deflection at c : The bent road has an E=200 GPa, G=75 GPa, and a radius of 30 mm. Use Castigliano's theorem and determine the vertical deflection at C. Include the effects of bending, shear, and torsional strain energy.
Determine the power that must be supplied to the pump at : Crude oil flows through a level section of the Alaskan pipeline at a rate of 1.6 million barrels per day (1 barrels=42 US gallons) the pipe inside diameter is 48 inch and its roughness is equivalent to galvanized iron.
What is the flow rate of air that must be entering the hood : We have a situation where hydrogen gas at 300 degrees C is flowing out of a tube at the rate of 100 mL/min. The tube is located in a fume hood operating at 25 degrees C and 1 atm.
Calculate the potential methane production in one year for : A 9,000-lb single wheel load is placed on a PCC slab that is 9.5 in. thick. The concrete has a modulus of elasticity of 5 million psi with a Poisson’s ratio of 0.15. The modulus of subgrade reaction is 225 pci. Tire pressure is 90 psi.
Calculate the coefficient of volume compressibility : In an oedometer test, the void ratio of a clay sample changed from 1.62 to 1.41 as the vertical effective stress imposed on the sample was increased from 100 kPa to 200 kPa. Later on, the vertical effective stress on the sample was decreased
How many rapid sand filter boxes of dimensions 10 m 10 m : A streamlined, high-speed train travels at 200 km/hr. The flow over the train is similar to flow over a flat plate. Estimate the boundary layer thickness at the end of the train, which is 125 m long. The temperature is 10°C.
Calculate the over consolidation ratio of the clay layer : From the results of an oedometer test on an undisturbed sample of clay taken at a depth of 10 m from the ground surface, the maximum vertical preconsolidation pressure (s’vmax or s’c) was found to be 560 kPa. The clay layer has a saturated unit weigh..
Calculate the primary consolidation settlement : An oedometer test on a clay soil gave the following results: Cc = 0.4, Ce = 0.08, OCR = 5. The thickness of the clay layer in the field is 2.6 m. The existing vertical effective stress at the mid-depth of the clay layer is 150 kPa. This vertical effe..
Find an expression for the flowrate and average velocity : Water flows steadly in an open topped channel of rectangular cross section. The channel width is B and the depth of the water is D. The flow is designed using a rectangular coordinate system whose orgin is at the free surface midway

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the volume of direct surface runoff in acre-ft

Determine the volume of direct surface runoff in acre-ft that will result from the following storm. The basin area is 1000 acres. The phi index is 0.5 in./hr. 30-minute period 1 2 3 4 Rain intensity (in./hr) 0.9 0.5 0.6 0.5

  Determine perpetual equivalent annual worth with landscaping

The cash flow associated with landscaping and maintaining a certain monument in Washington, D.C., is $100,000 now and $50,000 every 5 years forever. Determine its perpetual equivalent annual worth

  Determine how long should the basin be

Assume Stoke's Law holds true for the following question. You are asked to desgin a settling basin. Flow rates are 16 million gallons/day. The basin must be 4m deep, and 4m wide. Particle size ranges from 0.2-50 mm in diameter.

  Why do owners prefer the design-build form of contracts

Why do owners prefer the design-build form of contracts when many of them know they can obtain better quality construction using other forms. What are the stages at which the designer will schedule design reviews.

  What is difference between universal beam and steel section

What is the difference between universal beam and universal column steel sections in terms of performance in bending

  How high will the water rise between the plates

Two vertical, parallel, clean, glass plates are spaced a distance of 2.3 mm apart. If the plates are placed in water how high will the water rise between the plates (in mm) due to capillary action? Use a value of 0.073 N/m for the surface tension for..

  Determine the total crop water requirement

Determine the total crop water requirement including the leaching ratio of a corn crop with a ECt of 1.7mmhos cm-1 if the ECiw of the irrigation water and precipitation is 5 and 0 mmhos cm-1 respectively

  What is the stress along the top edge and the bottom edge

A horizontal pre-stressing force of 500kN is applied to rectangler beam. the beam has a depth of 500mm and a width of 250mm. the force is applied at a distance of 80mm below the x-x axis.

  Determine the minimum necessary clearance height

Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI. (ignore the cross-sectional width of the overpass)

  Going from west to east on the same section of the road

A section of highway is 18 km long. A bus going fromeast to west on this road climbs for 6 minutes at one speed, levelsoff for 6 minutes at a second speed and descends for 6 minutes at athird speed. Going from west to east on the same section ofthe r..

  Embankment for a highway

An embankment for a highway 30m wide & 1.5m in a compacted thickness is to be constructed from a sandy trucked from a borrow pit. the water contenet of the sandy soil in the borrow pit is 15%& its void ratio is 0.69.

  A segment of urban four-lane two lanes in each direction

nbspa segment of urban four-lane two lanes in each direction has a 3 upgrade that is 1500 ft long followed by a 1000-ft

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd