Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
calculate the change in entropy of a gas of mass 8kg when 100 kj of heat energy is supplied to the gas. the temperature of the gas remains constant at 100 c during the heat transfer process
A tub of a washing machine is rotating at 50 rad/s when the power is turned off. If it takes 15s for the tub to come to rest, determine (a) the constant angular deceleration, and (b) the total number of revolutions the tub makes.
The cylinder B is released from rest. Determine the speed of both masses (vA and vB) after B moves by h m. Also calculate the angular displacement for the pulley D. The diameter of the pulley D is 0.2 m. Neglect all friction.
Assume that the sludge does not change density during filtration and that liquid removed from the sludge contains no sludge. Using mass-balance method. determine the volume of sludge after filtration.
A brass alloy has a yield strength of 280 MPa, a tensile strength of 390 MPa, and an elastic modulus of 105 GPa. A cylindrical specimen of this alloy 12.7 mm in diameter and 250 mm long is stressed in tension and found to elongate 7.6 mm.
A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m 3 at an optimum water content of 13.2%.
The slabs are to be built integrally with the end supports, which are spandrel beams. fy = 60,000 psi, fc' = 4000psi normal-weight concrete. Clear spans are 15 feet, 18 feet and 15 feet. with the longitudal span of 38 feet.
An 8x12 column of No. 1 Spruce-Pine-Fir(South) has an unbraced length for buckling about the strong x axis of 16 feet and an unbraced length for buckling about the weak y axis of 8 ft. Cm = 1.0 and Ct = 1.0
A square footing 0.3 m by 0.3 m is placed on the surface of a dense cohesionless sand (unit weight = 18.2 KN/m^3) and subjected to a load test. If the footing fails at a load of 13.8 KN, what is the value of (degree) for the sand
The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
A cable is attached at A and is connected to the wall. Determine the axial forces in the members of the truss using the Method of Joints and indicate whether they are in tension (T) or compression (C). Be sure to provide complete free body diagram..
A block begins to slide down a ramp after being elevated to an angle of 47.5 degrees. What is the coefficient of static friction
A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m3 at an optimum water content of 13.2%. Field tests give the following results: Field dry density is 1790 kg/m3 and 16...
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd