Part 1.
Using the plans for a dwelling and the relevant Australian Standard you are to calculate the bracing required for the building and complete the Bracing Layout Plan.
(The plans are scaled at 1:100 when printed/viewed on A3 size) You are to provide the relevant details of the bracing proposed to be used including any special fixings required.
The building is proposed to be constructed in an area that has been given a Wind Classification of N3.
Part 2
You are to undertake a review of domestic building construction to observe the steps in constructing a residential dwelling. The report should focus on the construction observed during the site inspection of the 24th October Undertake a pictorial and accompanied written analysis of the construction methods observed onsite, commencing from site scrape through to completion ready to hand over to the client. Use your creative talents to showcase the stages of a typical house build, noting both the elements of the building construction identified and detail WHY these elements/methods are being utilised. Reference to relevant standards will also be required.(Allow around 2000 - 2500 words).
If weather becomes a problem, or if some aspects of construction are unable to be observed during the site visit, it may be necessary to obtain images from other sources. Ensure that any sourced images depict Australian construction methods The building process report should use correct terminology in describing the construction process - i.e. avoid ‘trade names' when describing materials.
If the man is always seated in an upright position, determine the magitudes of the horizontal and vertical reactions of the chair on the man at the instant \theta = 45^\circ. At this instant he has a speed of 6 {\rm m/s}
flow of 600cfs is measured at a depth of 3.4 ft in trapezoidal channel with bottom width of 25ft and side slopes of 3:1(h:v). The channel reach has a slope of .002. Estimate the channel roughness.
Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of 100th vehicle to arrive (assumin first-in-first-out)
A chemical is added at the beginning of a water treatment plant at a dose of 750 lb/day. The water treatment plant provides water to a community of 200,000 people and the average water consumption in the city is 110 gallons per capita per day (gpc..
Vehicles begin to arrive at a toll booth at 850 am with an arrival rate of x(t) = 4.1 + .01t (with t in min and x(t) in veh /min.) The toll booth opens at 9am and processes vehicles at a rate of 12 per minute throughout the day. Assuming D/D/1 que..
how many kilograms each of pearlite and preutectoid phase form? schematically sketch and label the resulting microstructure
The volume flow rate of streams into the pipe is given by QA = 0.02t m 3 /s and that of stream B by QB = 0.008t 2 m 3 /s, where t is in seconds. The exit area of the pipe is 0.01m 2 . Find velocity and acceleration of the flow at exit at t = 1s.
If a tank contains 1000 kg of the dilute acid and the concentrated acid is added at a rate of 100 kg/min, how long will it take to bring dilute acid strength to 75 wt% H2PO4? What will be the final chemical composition and weight of the final mixture..
Assume the actual water temperature for calibrating a 1/3 ft3 measure was 65 degrees F. If you had used a water temperature of 75 degrees F for your calibration, how much error would there be in your volume calculation (both in ft3 and as a percen..
Compute the magnitudes of the normal stresses (sigma,x) and (sigma,y) in front of a surface crack of length 2.0 mm in response to a nominal tensile stress of 100 MPa at the following positions:
The beam has a rectangular section which is to be singly reinforced. Given pt=1.1% design and detail the steel reinforcement for the section where the moment is maximum
Cable AC is 70 ft long, and the tension i nthe cable is 5250 lb. Determine the x, y, and z components of the force exerted by the cavle on the anchor C. Also, find the angles theta-x, theta-y, and theta-z defining the direction of the force.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd