Calculate the angles made by f with the positive x

Assignment Help Civil Engineering
Reference no: EM13302003

A force is specified by the vector F= 120i-160j+80k lb. Calculate the angles made by F with the positive x-,y-, and z- axes.

Reference no: EM13302003

Questions Cloud

Determine the angular separation of two spectral lines : What is the angular separation of two spectral lines of wavelengths 439 nm and 395 nm formed in order m=2 with a 367 line/mm grating
Find the net proceeds from the sale of each bond : Flotation costs of $30 per bond will be incurred in the process (which implies that f = 2.97%, or 0.0297 in decimal form) and the firm is in a 40% tax bracket.
Draw a graph showing the effluent concentration as function : Draw a graph showing the effluent concentration as a function of time for : a. Zero order CMFR and PFR with the same influent concentration and reaction rate. b. First order CMFR and PFR with the same influent concentration and reaction rate.
What is the angle of this force on the ladder : A 76 kg window cleaner uses a 13 kg ladder that is 5.0 m long. He places one end on the ground 3.0 m from a wall, What is the angle of this force on the ladder
Calculate the angles made by f with the positive x : A force is specified by the vector F= 120i-160j+80k lb. Calculate the angles made by F with the positive x-,y-, and z- axes.
What is an accessory and conspiracy : What is an Accessory? What is a Principal Question. What is an Accomplice? Define Conspiracy?
What is the final velocity of the players : A football player weighing 75 kg running at 2 m/s toward west tackles a 70 kg player running at 1.5 m/s in the opposite direction
What is the average speed of the particles : Particle track detectors are used to measure the speed of particles if the lifetime of the particle is known. Particle X has a lifetime of 256.2 ps. What is the average speed of the particles in terms of the speed of light
What happens to the npv of a one year project : What happens to the NPV of a one year project if fixed costs are increased from $400 to $600, the firm is profitable, has a 15% tax rate, and employs 12% cost of capital?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine how long will generator run on a tankful of fuel

A Bonda portable generator is powering a small travelling fridge (120V) in your RV and consumes 125 watts. The efficiency of the generator's gas motor is 23% and the electrical portion (power head) is more efficient at 91%.

  Determine what is the final river temperature downstream

A toothpaste factory situated on a large river disposes of a waste water containing villiamite (NaF) to the river on a continuous basis. The minimum flow in the river is 210 m3/s, and the discharge rate from the treatment plant is 12.5 m3/s.

  Find length and width of square basin for virus disinfection

Find the length and width of a square basin for virus disinfection of a flow of 6 MGD. You may assume a depth of 5 ft, a C•t product of 10 (mg/L) •min for 1.5-log removal, and a target free chlorine residual of 0.6 mg/L.

  Determine the steady-state concentration of the pollutant

A well-mixed sewage lagoon (a shallow pond) is receiving 430 m^3/d of sewage out of a sewer pipe. The lagoon has a surface area of 10 ha (hectares) and a depth of 1 m. The pollutant concentration in the raw sewage discharging into the lagoon is 18..

  Find the temperature stress produced

A rod of steel is 20 m long at a temperature of 200C. find the free expansion of the rod when the temperature is raised to 650C. Find the temperature stress produced

  Water behind the three gorges dam

Could all the people in china hold back the water behind the three gorges dam?

  Determine what percentage of the time will the through lane

A traffic engineer is trying to design a left turn bay on an EB approach to an intersection. The signal timing for left turns will have 10 seconds of "left turn only" green time and 50 seconds of red time each signal cycle.

  Solve given differential equation by separation of variables

Given computer-generated direction field. Then sketch, by hand, an approximate solution curve that passes through each of the indicated points. Use different colored pencils for each solution curve.

  Determine the minimum thickness of the welds

The tank has an inside diamater of 100 cm and will be subjected to a maximum internal pressure of 820 kPa. The allowable tensile stress in the wall is 83 MPa, and the allowable tensile stress in the weld is 55 MPa.

  Acceleration along a pathline

The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.

  Determine the horizontal deflection of joint

The maximum vertical load and horizontal load have been identified and shown in the figure. Under this loading condition, you are asked to determine the horizontal deflection of joint C.

  Compare size of cmfr and pfr to achieve 50 percent

Compare the size of a CMFR (completly mixed flow reactor) and PFR (plug flow reactor) to achieve 50 percent removal of a contaminant, given a flow rate of 10^4 m^3/d and a first-order rate constant of -0.4/hr. Repeat for 99 percent removal.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd