Terry wants to purchase a used car for $8000. The dealer offered to finance the deal at 8.5% APR for 4 years with 10% down payment. Terry's bank will provide a loan at 7.8% for 3 years, but wants a 20% downpayment. a) Calculate the required downpayment and monthly payments for each loan option. (Assume monthly compounding and monthly loan payments.) b) The PV for both options (including the down payments) is the same, $8000. What additional factors should terry consider when deciding which aid the best deal for her?
A rectangular concrete channel is 3 m wide and 2 m high. The water 20 deg Celsius in the main channel is 1.5 m deep and is flowing at a rate of 30 m^3/s. determine the flow area, wetted perimeter, and hydraulic radius. Is the flow laminar or turbu..
A pipe line of 1.25 m diameter has a circular gate at its end. This gate can be operated around its horizontal diameter. If the pipe is flowing full with velocity almost equal to zero, calculate the turning moment required to operate the gate
A stack (T=550 F and P=750 mmHg) was sampled using EPA Method 5. The total gas volume that flowed through the dry gas meter was 2.785 cubic meters (at T=60 F and P=800 mmHg).The mass of particles collected was 1.50 g.
Draw circle and put line with angle inside the circle that reflected in it. Make sure the measurement is punctual for each one. Angels required are 20-40-60 degrees. that means you have to draw three circles.
What is the maximum load that a .75" diameter steel cable can hold if the UTS of the steel is 145,000 PSI and a safety factor of 1.5 is required.What is the stretch of the 360" cable under this load
Important information about Short essay, In managing the uncertainties of ethical issues in engineering, what are some questions that we may ask to limit some of the risk
Two 52 kN loads are maintained 2.5 m apart as they are moved slowly across beam AB. Write a computer program to calculate the deflection at the midpoint C of the beam for values of x from 0 to 9 m, using .5 m increments.
Using a safety factor of two based on the stress, determine the maximum temperature the component must be exposed to for it to sustain the stress for at least 1000 days.
If an 18.9 L (5 gallon) bucket of PCE is released (and equally distributed) into a 3.79x10^8 L (100,000,000-gallon) aquifer, will the PCE standard of 5 microgram/L under the Safe Drinking Water Act be exceeded
Briefly explain the purpose of the International Space Station, and list the name of all space agencies involved in building and operating it.
In using the Darcy-Weisbach equation for flow in a pressure conduit, what percentage error is introduced in Q when f is misjudged by 20 percent?
A waste water treatment plant previously used two circular clarifiers for primary settling, each 42 ft in diameter and 12 feet deep. Assume the incoming flow rate was 0.9 MGD. The maximum allowable clarifier loading rate is 600 gal/d/ft^2
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd