Calculate new mrp to improve the base mrp

Assignment Help Operation Management
Reference no: EM13105383

Space Age Furniture Company The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products-the Saturn microwave stand and the Gemini TV stand-have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age's shop. Once set up and started, the lathe can run nearly unattended. How- ever, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been neces- sary to schedule frequent overtime for him in order to finish the necessary parts on time.
Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed's experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.
Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.
Master Schedule
Week 1 2 3 4 5 6
Gemini 600 400 700 500 400 600
Saturn 300 400 400 600 300 300
The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products.
Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies are produced using the same equip- ment. To minimize change over time, Space Age has decided that these subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassem- bly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory of part 3079, and there are no orders in process.
Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. When- ever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week
Respond to the following and include any Materials Requirement Planning (MRP) calculations:
Develop an MRP for Space Age Furniture Company using the information in the case including the production of sub-assemblies in lot sizes of 1,000.
The lot size of 1,000 for sub-assemblies has produced a lumpy demand for part 3079. Suggest ways for improvements over sub-assemblies in lot sizes of 1,000.
Analyze the trade-off between overtime costs and inventory costs.
Calculate a new MRP that improves the base MRP.

Reference no: EM13105383

Questions Cloud

Confidence interval for customer satisfaction-testing : Quality Progress, February 2005, reports on the results achieved by Bank of America in improving customer satisfaction and customer loyalty by listening to the voice of the customer.
Develops more dependent on technology certain issues : As the world develops more dependent on technology certain issues may rise with contracts and the Statute of Frauds.
Explain why do you think cemex decided to exit indonesia : Explain why do you think Cemex decided to exit Indonesia after failed to gain majority control of Semen Grisk? Explain why is majority control so important to Cemex?
Confidence-interval of the true mean : A food snack manufacturer samples 7 bags of pretzels off the assembly line and weighs their contents. If the sample mean is 12.7 oz. and the sample standard deviation is 0.40 oz., find the 95% confidence interval of the true mean.
Calculate new mrp to improve the base mrp : Space Age Furniture Company The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions.
Explain what position should jim take : Illustrate what other factors are relevant to this issue? Explain how do the changes in assumptions mentioned by the other managers affect the proposal? Illustrate what position should Jim take? Explain why?
Confidence intervals for amount of student loans : A study of 25 graduates of four-year colleges by the American Banker's Association revealed the mean amount owed by a student in student loans was $14,381.
Virtue ethicist have to say about executive compensation : How would Milton Friedman need to recompense corporate executives? How would a utilitarian? A deontological thinker?
Relationship between variables and the null hypothesis : Which of the following does not explain a possible relationship between variables when the null hypothesis is rejected?

Reviews

Write a Review

Operation Management Questions & Answers

  Determine two constraint equations for this lp problem

Determine two constraint equations for this LP problem, but do not solve! Hint: The number of constraint equations must equal the number of decision variables. Only two are required

  What is the expected number of samples observed

What is the expected number of samples observed before the shift is detected? What is the probability of detecting this shift by the second sample after the shift has occurred?

  Difference between nonfinancial and financial controls

What is the difference between nonfinancial and financial controls? Is a financial control a behavioral or an outcome control?

  Case study - mcdonald corporation

This case discusses McDonald's Corporation and the situation it faced in 2001. After many years of double?digit growth in sales and net revenue, the company's sales grew only 1.12 percent and net revenue dropped 17.2 percent from 2000 to 2001.

  What is the capacity of the process

what is the capacity of the process, and what is the bottleneck? what is the average throughput time, and if the average flow rate is five customers per hour, what is the average number of customers in the system?

  Question about conflict resolution technique

Some individuals believe that compromise isn't a good conflict resolution technique because there is no distinct winner and the decision reached is probably not ideal for either group.

  What is the simple rate of return on the machine

It has a payback period of four years. What Is the simple rate of return on the machine?

  How is fast tracking also crashing different

How is fast tracking also crashing different? How are they similar. Provide examples. Choose a business also evaluate beneficial influences of changing technological forces on that business.

  Illustrate what other factors are relevant to this issue

Illustrate what other factors are relevant to this issue. Explain how do the changes in assumptions mentioned by the other managers affect the proposal. Illustrate what position should Jim take.

  Discuss job outsourcing by assessing its benefit

Discuss job outsourcing by assessing its benefit to U.S. firms. Many marketers now believe that teenagers in the developed countries are becoming "global consumers." That is, they all want and buy the same goods and services.

  The number of no-shows is normally distributed

The number of no-shows is normally distributed with a mean of 50 and standard deviation of 15. If a customer with booking cannot be given a room, NLI reimburses them with cash equal

  Draw the precedence diagram

Draw the precedence diagram. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd