the room described in problem 8.1 gas a 1 m wude door with a 1 cm high slit at the floor level. THe oil spill has a rectagular area of sides 0.5 m by 0.5 m.
(a) calculate the pressure increase, the air velocity, and the mass flow rate throug the slit.
(b) the slit is now made 10 times higher. How will this influence the varaibles calculated in part A
Given a sand with a moisture content of 10%, how much water needs to be added to bring the sand to a moisture content of 20%
Dispute in largest open-pit copper mine, My recollection may be skewed, so for our purposes, consider this example a hypothetical, but this is my recollection of a real case. In the early 80s, in Salt Lake County, Utah, a dispute arose involving t..
A fine-bubble aeration basin has a flow of 21.5 mgd, an influent BOD of 180 mg/l, 31 mg/l of mmonia, and effluent of 10 mg/l. During the winter, the wastewater temperature of 14.8 degrees C does not nitrify.
The herbicide 2,4,D, is applied to a golf course at a rate of 1.2 kg/ha. The organic matter content of the soil is 1%, bulk density is 1.3 g/cm3, and water content is 0.3.
The depth to water in A is 210 ft, in B is300 ft, and C is 230 ft. Determine the direction of ground water flow through the triangle ABC and calculate the hydraulic gradient. If the aquifer hydraulic conductivity is 30 ft/day, estimate how far gro..
The volume flow rate of streams into the pipe is given by QA = 0.02t m 3 /s and that of stream B by QB = 0.008t 2 m 3 /s, where t is in seconds. The exit area of the pipe is 0.01m 2 . Find velocity and acceleration of the flow at exit at t = 1s.
A crest vertical curve and a horizontal curve on the same highway have the same design speed. The equal-tangent vertical curve connects a +3% initial grade with a +1% final grade and has a PVC at 101+78 and a PVT at 106+72
A community has three major sources of power supply: electricity, gas and oil. Let E, G and O denote events of shortages of each of these power sources, respectively. Their probabilities are estimated to be 0.15, 0.10 and 0.20 respectively.
Calculate the IEEE double precision floating number immediately greater than the minimum number in double precision in both binary and decimal form
What is the pH value of water containing 0.005 M of an acid with a acid dissociation constant of 0.001 M. The dissociation of the acid in water can be represented as: HA H+ + A-
Assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mi/h and, if the existing curve is inadequate, compute a satisfactory curve length.
A rod of steel is 20 m long at a temperature of 200C. find the free expansion of the rod when the temperature is raised to 650C. Find the temperature stress produced
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!