Build and elucidate a prototype model

Assignment Help Chemistry
Reference no: EM134999

Coal-fired Power Generation

Compared with other fossil fuels, flaming coal produces relatively large amounts of atmospheric pollutants: carbon dioxide (CO2), nitrogen oxides (NOx), sulphur dioxide (SO2) and particulates. So over recent decades there has been a refuse in the employ of coal for power generation. But, as supplies of other easily-available fossil fuels dwindle there remain vast deposits of coal, and the International Energy Agency estimates that coal will silent be employed to generate 38% of the world's electricity in 2020.

In European Union, environmental concerns have led to limits on the emission of pollutants. A market has been established for trading CO2 emissions. A generator has to pay for CO2 emissions at the market rate, thus they can be treated as an additional fuel cost. This might be extended to SO2, but currently generators are allocated a limit (a 'sulphur bubble') for a year running from October to October (the 'sulphur year').

Flue-gas desulphurisation (FGD) and 'scrubber' technology can lessen emission levels of SO2 and NOx respectively from the exhaust gases.

Coals from dissimilar regions of the world have dissimilar composition, with dissimilar calorific values and pollutant content. Combinations of coals are often employed so that tradeoffs can be made between costs, energy and the range of emissions produced.

Newly some coal-fired plants have started to 'co-fire', blending coal with biomass. Biomass consists of waste products from forestry (e.g. wood chips), from paper production, and from agriculture (e.g. straw and olive cake). In UK the Department of Trade and Industry (DTI) has put the target that by 2010 renewable sources must contribute 10% of the UK electricity supply, and generators are paid a supplement for each MWh of power generated this way (this is known as the Renewable Obligation Certificate, ROC, and supplement). The DTI predicts the combustion of biomass, both domestic and imported, as being the fastest growing component of the renewable energy.

International Coal

International Coal (IC) operates a large (1,000 MW) coal-fired plant in UK. They occupy a team who purchase dissimilar fuels in order to maximise margin (profit) whilst keeping in environmental limits, especially on sulphur. IC has been allocated a sulphur bubble of 30 kilo tonnes for year (to the end of October). CO2 emission is taken to be 0.8 tonnes per MWh of electricity produced.

Coal is typically bought three or more months ahead of planned burn and stockpiles are kept at the plant. Stockpiled coal is stored in mixed piles; though biomass has to be stocked separately. Transport costs are factored in the fuel prices. The plant has 35% efficiency, i.e. 35% of the calorific energy released in a burn is converted to MWh of electrical power.

Power is sold to electricity markets, and fuel buying is completed on the basis of prospect prices in these markets. Each month is divided in four price bands: classified by weekend or weekday, and peak or off-peak. (Peak periods hold a 12-hour block). Therefore there are four prospect prices for every month. Power is distributed by National Grid Company which charges IC a transmission rate of 65p per MWh.

The Problem

The fuel-buying team at IC is led by the Bob Manchester. The purchasing decisions have been relatively straightforward, except as the sulphur bubble has become more restrictive, pressure is raising to show that the best fuels are being employed. Bob believes there should be a systematic manner of considering the tradeoffs involved in the decisions being made.

It is now the end of May 2005. To test the feasibility of a modelling approach, Bob desires to examine power generation to the end of October, considering the stockpile of mixed coals at the plant, three types of coal that can be ordered for burning in September and October, and wood-chip biomass which can be bought with short lead-times. Fuel is to be paid for now, ignore discounting of any of the cash flows.

Biomass is more difficult to hold than coal, having more variable combustion characteristics (low density, extremes of particle shape, tendency to entangle and demix plus moisture has a large consequence has on their behaviour), so might not provide more than 10% of the mix (by calorific value) in any of the generating periods.

Bob has provided prospect-price data (Table 2) and fuel characteristics (Table 1). The current coal stockpile at the plant (including coals previously ordered and en route) is 600,000 tonnes and there is 30% of the 'sulphur bubble' left this sulphur year. CO2 emission is trading at 15 Euros per tonne on the European market, which IP must pay for any CO2 produced. The ROC is £45 per MWh from renewable.

He has also mentioned a couple potential future issues. SO2 emissions are a major concern for IC. One possibility is to invest in FGD. There is also the possibility that SO2 emissions may become tradable (and so a direct cost) in the way CO2 currently is. Either of these is likely to have a major impact on operations at the plant, but Bob is unsure how to start quantifying the potential benefits.

Assignment

Your charge is to

  • Build and elucidate a prototype model
  • Use your model to recommend a schedule of the burning and, if necessary buying, fuels
  • Use your model and its results to offer:

- Any further guidance on impact of the costs of the fuels in particular, since these are prospects prices, the effects of any drops in price

- Any insights you can in the issues of FGD and sulphur-trading

Data

Table 1: Characteristics of Fuels

Fuel

Pricea

Calorific value

SO2

 

£/tonne

GJoules per tonne

%b

Coal: Stockpile

42.56

25.81

1.38%

Coal: Columbian

43.93

25.12

0.70%

Coal: Russian

43.80

24.50

0.35%

Coal: Scottish

42.00

26.20

1.72%

Wood chips

73.77

18.00

0.01%

Table 2: Future Electricity Prices

Electricity Market

Forward Prices

June

July

August

September

October

Period:

£ per MWh

£ per MWh

£ per MWh

£ per MWh

£ per MWh

Weekday Peak

36.00

36.35

37.65

38.35

43.70

Weekday Off-peak

27.00

27.00

28.20

28.50

31.70

Weekend Peak

33.50

34.30

35.65

35.80

38.70

Weekend Off-peak

26.20

26.30

27.50

27.65

30.10


Table 3: Currency Conversion

British pound per US Dollar

1.0000

British pound per Euro

0.6667

Reference no: EM134999

Questions Cloud

Perform the necessary research and calculations : Perform the necessary research and calculations regarding the best source of that product based only on total delivered (landed) cost, which includes the following- Product cost from each country
Identify the technical challenges by project leader : Recommend three actions that the project leader should take in order to identify and understand the technical challenges and issues facing the project
Evaluating value of long-term elements of capital structure : Determine the value of the long-term elements of the capital structure, and find out the target percentages for the optimal capital structure. Carry weights to 4 decimal places.  Evaluate the retained earnings break point.
Calculate the total drill and blast cost : Calculate the total drill and blast cost based on the blasting costs
Build and elucidate a prototype model : Build and elucidate a prototype model, Use your model to recommend a schedule of the burning and, if necessary buying, fuels, Use your model and its results to offer.
How much can jane have in her retirement account : How much can Jane have in her retirement account at once after she makes her last contribution in Year 40, assuming a return on her investments of 9%?
Optimal page replacement strategy : What is minimum number of page faults for the optimal page replacement strategy? Please show how the page is placed and how page faults occur.
Law of hearsay : Outline and show the way in which the law of hearsay might affect the admissibility in court of computer-generated evidence and/or computer stored evidence.
Electronic discovery in civil actions : Explain and discuss the problems presented by electronic discovery in civil actions and how the law has responded.

Reviews

Write a Review

Chemistry Questions & Answers

  What will be the resultant pressure

What will be the resultant pressure when the stopcock is opened?

  Calculate the approximate sulphur

Calculate the approximate SO 2 mass emission in lb/day.

  Use a drawing program to draw a beaker.

Use a drawing program to draw a beaker.

  Steps in the mechanism for the following reaction

Show all the steps in the mechanism for the following reaction, When benzene is mixed with deuterated sulfuric acid, deuterium is slowly incorporated onto the ring. Show the mechanism for this reaction and explain how this relates the sulfonation of ..

  The 1h nmr spectrum

Integrals for some of the resonances in the 1H NMR spectrum are higher than they should be due to the shear number of hydrogens in this compound

  What is the total electronic energy

What is the total electronic energy

  How each stereoisomer is formed in the reaction

Draw the accepted mechanism for each reaction and illustrate how each stereoisomer is formed in the reaction.

  Name of all the chemical formula

Describe each reaction and provide the name of all the chemical formula involved for each number.

  What is the structure - stereochemistry

What is the structure (including functional groups)? Stereochemistry (racemic or single enantiomer)?

  Analysis of corrosion mechanisms

Analysis of corrosion mechanisms and preventative measures

  Design a tube and shell heat exchanger

Design a tube and shell heat exchanger for the fluids and duty given for you and complete Project Management tasks

  Water and wastewater treatment

Describe the process design and application - Water and Wastewater Treatment

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd