Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Water flows in a river. At 9AM the flow past bridge 1 is 37.2 m^3/s. At the same instant the flow past bridge 2 is 26.9 m^3/s. At what rate is water being stored in the river between the two bridges at this instant? Assume zero seepage and negligible evaporation.
Laboratory analysis methodology to be used. Give details on the standard methods, instrument and detection limits. Standard methods for heavy metals analysis exist
They completed the installation when the temperature was 20 degrees Celsius. When the temperature rose to 25 degrees Celsius, the rail buckled into an isosceles triangle because they had not left an expansion gap.
In taping from A to B, a tree on-line necessitated setting an intermediate point C offset 4.5ft to the side of line AB. Line AC was then measured as 368.92ft along a uniform 4% slope
A) calculate the steady state P concentration in the lake B)Creek A has been identified as the easiest to control. What would the P concentration have to be reduced to in Creek A, in order to reduce the concentration in the lake below 0.025 mg/l
One mole of an ideal monoatomic gas initially at 300 K is expanded from an initial pressure of 10 atm to a final pressure of 1 atm. The molar heat capacity for constant volume for the gas is Cv = 3/2 R .
Do the administrators of server systems still have to be concerned about, and take further countermeasures against DoS attacks, if so, what types of attacks can still occur, and what measures can be taken to reduce their impact?
Benzene is a toxic chemical used in the manufacturing of mechanical chemicals. A manufacturer claims that its exit (effluent) water meets the federal regulation standards with a mean of less than 7980 ppm of benzene.
How would you define the coefficient of permeability? Give typical values of the coefficient for: a) fresh cement pastes; b) hardened cement pastes; c) commonly used aggregates;
he project duration is planned for 20 weeks. The project budget is $40,000 and is planned to be spent on a level bases through out the project. You are at the end of week 10, the accounting department tells you the project has spent $19,500
A ball is thrown vertically upward with a speed of 15m/s. Determine the time of flight when it returns to its original position.
Constructing the foundation causes changes in the levels of vertical stress at all points in the soil. One such point lies at the centre of the footing plan and is at a depth of 10m. Determine the increment of vertical stress there.
A tangent section of highway has a -1.0% grade and ends at station 0+1450and elevation 25m. It must be connected to another section of highway that has a -1% grade and that begins at station 1+345 and elevation 40m.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd