At the time what percentage of the principal has been paid

Assignment Help Civil Engineering
Reference no: EM13307801

A company borrowes $25000 at an interest rate of a nominal 16% per year compounded quarterly. The company desires to repay the loan in 36 equal quartely payments, with the first payment starting three months from now.
(a) What should be the size of each payment?
(b) If after making payments the company decides to pay off the balance of the loan at the start of the 17th quarter, how much must the company pay?
(c) At this time what percentage of the principal has been paid?

Reference no: EM13307801

Questions Cloud

At what speed does the wave travel : If a mechanical wave has a wavelength of 2.80 meters and its period is 4.5 seconds, at what speed does the wave travel
What is the proper lifetime of such a particle : a subatomic particle is traveling with a gamma factor of 20 as observed by a radiation monitor in a nuclear power plant. What is the proper lifetime of such a particle
Will ibms plan to give away some of its it assets : Will IBM's plan to give away some of its IT assets and intellectual property and increase support of opensource software products like linux ,be a successful growth strategy in the "brutally competitive marketplace" in which it operates?why OR WHY..
How much heat must be supplied to the water : A pot containing1.00 liter of water, initially at 20.08C, is placed on a 1000 W electric heating element. How much heat must be supplied to the water to bring it to a boil
At the time what percentage of the principal has been paid : A company borrowes $25000 at an interest rate of a nominal 16% per year compounded quarterly. The company desires to repay the loan in 36 equal quartely payments, with the first payment starting three months from now.
What is the heat-flow rate along the rod : One end of an iron rod 40 cm long and 3.3 cm in diameter is in ice water, the other in boiling water. What is the heat-flow rate along the rod
How to understand the code perfectly without unclear steps : Finish the following hangman C++ program and make it run well as well as comment the program through to help me understand the code perfectly without unclear steps.
Calculate kg per day of sludge process if sludge is solid : The effluent contains 20 mg/L of solids and 20 mg/L of BOD the biological treatment process produced .32 kg of bacterial solids per kg of BOD removed
Types of contracts and performance-based acquisition : Types of Contracts and Performance-Based Acquisition

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the mean fragmentation size using kuz ram

The mine wants to change the hole diameter to 229 mm and needs a new drilling pattern that will not result in coarser fragmentation. For this exercise you can assume homogenous geology and no adverse effects due to geological structure.

  Determine the moment of the force

A force, 90 N in magnitude, is applied to control rod AB as shown. Knowing that the length of the rod is 225 mm, determine the moment of the force about point B by resolving the force into components along AB and in a direction perpendicular to AB..

  Calculate compressive capacity using australian standard

A client has engaged your consultancy company to undertake a conversion of a warehouse to a residential dwelling in the northern city of Darwin. You are required to check the capacity of a proposed column to ensure it can support a mezzanine floor..

  Calculate the runout length with an allowable stress

An 80-mil (2 mm) HDPE geomembrane with an allowable stress of 1,300 lb/in2 rests on a 3(H):1(V) side slope. A 18-inch thick cover soil with a unit weight of 110 lb/in3 (also unit weight of the back fill soil in the anchor trench) is placed of the ..

  What is the over consolidation ratio of the soil

an increment of vertical stress of 150kpa compress the sample to a void ratio of1.43. what is the over consolidation ratio of the soil at the unloaded condition.

  At what speed will a stationary observer on the earth

A jet aircraft is flying in a standard atmosphere at an altitude of 4,000 m at 900 km/hr. The frontal intake area of the jet engine is 0.80 m2. The engine exhaust area is 0.56 m2. The temperature of the exhaust gas is 120°C.

  Determine what is the unit discharge at 20 minutes

Assume a time to peak of 15 minutes and the unit peak discharge is 7.0 cfs/in, using the Gamma Function Unit Hydrograph what is the unit discharge at 20 minutes

  Find how much would the pressure in the tank increase

A rigid tank contains 5kg of water at 20 degrees Celsius. A gage on the tank reads 200kPa. Determine a) the volume of the tank, b) How much would the pressure in the tank increase if the temperature were increased to 50 degrees Celsius.

  Determine the angle of twist

A beryllium copper wire having diameter of 1-50 mm and length of 40mm is used as a small torsion bar in an instrument. determine what angle of twist would result in the wire when it is stressed to 250 mpa.

  Write out the steps for the aldol condensation reaction

Write out the steps for the aldol condensation reaction between the enolate anion of propanal with pentanal.

  Explain indicated concentrations of total volatile solids

Influent sample collected from a wastewater treatment plant was analyzed for various solids concentrations. Results indicated concentrations of Total Volatile Solids (TVS)

  Determine the smallest standard commercial pipe

For satisfactory operation, the static pressure at the pump inlet must not be lower than -6 m of water gage. Determine the smallest standard commercial pipe that will give the required performance.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd