Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Project name is Assessment of waste Water treatment plant: Emphasis on plant capacity and Economical sewer pipe material.
Please go through the points and write about that topics Literature review:
1 Introduction- (what are going to do in this chapter? With keeping the sequncesess )
2 West water treatment plant capacity assessment- (fixing the treatment plant (information),-what the data you want know before?-process of sewage treatment plant- Population discharge for fixing
3 Sewer pipe material- Types of the pipe- Soil condition- Cost of the pipe- Flow of pipe and diameter of the pipe
Verified Expert
This assignment tells that what is WWTP, its requirement. The WWTP is a very sophisticated and complex process having high level standards for whole plant. This plant should be able to withstand corrosive conditions. These corrosion may be micro-biological influenced corrosion or abrasive corrosion. It's a matter of caring for our environment and for our own health.
f the design speed of a multi-lane highway is 60 mph, what is the minimum sight distance that should be provided on the road if (a) the road is horizontal and (b) the road has a maximum grade of 5 percent
It has been determined that the steady-state diffusion flux of a gas molecule through a solid metal plate is 5*10^-8 kg/m^2*s at a temperature of 1000K, and a concentration gradient of -300 kg/m^4.
The centres of the piers in a bridge are 8.0m apart. The piers are each 0.8m wide. Water flow under the bridge with an upstream depth and velocity of 4.0m and 4.0m/s respectively. The pier has a drag coefficient Cd = 1.5.
the room described in problem 8.1 gas a 1 m wude door with a 1 cm high slit at the floor level. THe oil spill has a rectagular area of sides 0.5 m by 0.5 m. (a) calculate the pressure increase, the air velocity, and the mass flow rate throug the sl..
a paved parking lot section has a uniform slope over a length of 100 m in the flow direction from the point of a
given a 22.414 liter volume of air at STP containg: 21.224kPa oxygen, 79.119 kPa nitrrogen, 0.946kPa argon,and 0.036 k carbondioxide. Find the gram molecular weight of the air.
Given the initial effective stress state at a point within a soil mass (s_y=2.5 daN/cm2, s_x=1.5 daN/cm2, t_xy=t_xy=0.4 daN/cm2) and effective soil shear strength parameters at the same point (friction angle=30 degrees, cohesion=0.5 daN/cm2)
given: Vf=Vi + a t and Sf=Si + Vi t + 1/2 a t a= 27 ft/sec^2 accelerates from 10 mph to 93 mph in 4.5 seconds designers decided to modify the rise to become the tallest roller coaster in the world, find final velocity in mph if the drop height is ..
A 12 ft x 12 ft square area carrying a uniform load of 5000 lb/ft^2 s applied to the ground surface.Find the vertical stress increment due to the load at a depth of 25 ft below the center of the loaded area.
To add the two amounts, you'll need to carry 1 shilling when the pence value is greater than 11, and carry 1 pound when there are more than 19 shillings.
A Horizontal curve on a single-lane highway has its PC at station 123+70 and its PI at station 130+90. The curve has a super-elevation of 0.06 ft/ft and is designed for 70 mph. What is the station of the PT
a rectangular piece of steel is 10" wide by 60" long by 3" deep, what is the max tensile force that could be applied to the steel, and what is the total elongation of the steel
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd