Assess the production process for the ram light assembly

Assignment Help Operation Management
Reference no: EM13896460

Midwestern Lighting7

"I can't see why you have to spend so much time looking at our processes. Hey, we have everything under control. It has been over five years since we got our last EPA inspection and nearly six years since we got our last major citation and fine. Things are going really smoothly and I really don't see why you have to look at the process. Now, why don't you go out and get me some cost savings? Every time I can save a penny per finished lighting assembly, I get that much bet- ter a chance to keep my business with the big boys."

With those words, Barry Jamieson, the plant manager of Midwestern Lighting's Light Fixture Plant (LFP) dismissed Tim Bryant. Tim had been hired some six months ago to help improve overall operations at LFP. Initially, he had been brought in by corporate to identify opportunities for cost reduction and for reducing scrap and landfill related costs. When he arrived at LFP, located in New Hudson, Michigan, Tim found a plant that was operating under a siege mental- ity. Everyone knew that they had to reduce costs and improve operating efficiencies if they hoped to win another contract from their three major customers. LFP was unique in that it was one of the few plants in the automotive industry that built light fixtures for GM, Ford, and Daimler-Chrysler. While LFP was noted for its superb quality, it was also recognized as not being very cost efficient. The managers of Midwestern Light- ing had tried to convince the plant manager at LFP to consider QS9000 certification. That effort was a disaster and ultimately resulted in the dismissal of the plant manager. It was that dis- missal that gave rise to the hiring of Barry Jamieson. Since arriving at LFP, Barry had developed a reputation for being a hard-nosed manager. To Barry, if you couldn't reduce cost, then you didn't have anything to say of importance. Barry was not really excited by Tim's presence. To Barry, Tim rep- resented nothing more than increased overhead.

The Production Process Described Since arriving at LFP, Tim could not help but feel that there were too many "diamonds in the rough" to ignore. Typical This case is prepared for the purpose of class discussion rather than to illustrate either effective or ineffective han- dling of an administrative situation. Ford Motor Company supplied the data. Some of the data have been modified to protect proprietary information. The writers of the case are fully responsible for the information within the case. Was the process for making the tail light assemblies for the Dodge Ram, one of the best selling trucks in the market. The process began with the back plate. This was long black piece of extruded ABS plastic (produced in another part of the plant) that contained two concave depressions-one for the turn light and one for the backup light. These were with- drawn from a temporary storage location found near the assembly line. Each back plate was first checked for cos- metic defects. Those that failed this step were placed in a bin where they were eventually used as a source of raw material for regrinds. Any plate passing this test was placed in a met- alization chamber where nickel metal particles were sprayed on using a high-pressure water-based system. Because of the nature of the process, only half of the material ever reached the back plate. The rest either fell to the bottom of the cham- ber or was vented out. Periodically, the chamber had to be taken off line and cleaned out. This process took 1 to 2 days and effectively shut down production of the tail light.

After the parts were metalized, they were removed from the chamber and checked for completeness and evenness of the coverage. Any rejected parts were placed in a bin. Because of the presence of the metal coating, the back plate could not be recycled, so it had to be landfilled. The accepted parts went into a rack where they waited for the arrival of lenses from a supplier. A plastic-wrapped film covered the lenses. Each lens, as it arrived from the sup- plier, was checked for surface flaws. Any rejected lenses were then put into a recycle bin, where they were used as inputs for any parts requiring low-grade black plastic.

The next step in the process was mating. At this stage, each lens was mated to a back plate. This was accomplished by placing the back plate and the lens into two fixtures. These fixtures were then fed into an automated gluing machine. The machine placed a bead of glue on the lens, waited for 10 seconds and then placed the lens onto the back plate. Peri- odically, the gluing machine had to be purged and cleaned. This was typically done twice a shift; each instance required 30 minutes. This process was fairly messy and required sev- eral globs of glue to be expressed through the nozzle. After this was done, the last glob of glue was then expressed and the nozzle was removed. The machine had four nozzles. The residual glue and nozzles were then thrown into an old 55-gallon barrel. Because this barrel was used as a receptacle

for all sorts of scrap (including floor sweepings and cigarette butts), the only disposal option was a landfill.

After mating, the back light assembly was next tested for leaks. Placing the body into a tank of water and then shooting a burst of air through it completed the testing. Again, any assemblies that failed this test were put into a bin for eventual disposal in a landfill site. Those that passed this stage next proceeded to the finishing assembly. It was here that two light bulb assemblies were first made. These assemblies required one receiver and one light bulb each. Both the receiver and the light bulbs were provided by out- side suppliers. After they were assembled, the assemblies were inserted into the appropriate holes in the car body. The light assembly was then inspected for performance and surface blemishes. Any problem assemblies were put aside for rework. Those that could not be reworked were set aside for disposal (again landfilled). The remaining "good" assemblies were packed into a cardboard box and shipped out to the Dodge Ram Assembly plant.

The current practice at the LFP was to allocate the total production cost to the number of good assemblies pro- duced. By working with the material requirements planning system at LFP, Tim and others were able to track the fol- lowing costs associated with waste in the process. For the tail light assemblies, the line produced 3,600 lot size/shift. Labor and overhead costs were considered to be fixed.

Current Process

Molding

Metalization

Inspection

Direct materials waste

.05

.001

.000

Other waste (materials and labor)

.058

.023

.048

Production cost/piece

.093

.042

.023

Total cost/piece

1.15

1.216

10.727

Questions

1. Assess the production process for the Ram light assembly. How efficient is it?

2. Develop a process map for this operation.

3. Where are the largest opportunities to reduce waste and associated costs?

4. What strategy/approach would you use for making recommendations to Barry Jamieson?

Reference no: EM13896460

Questions Cloud

Create database that contains the inventory of organization : Create a database that contains the inventory of your organization's technology, as well a table including employee information. Build your database named IT_inventory, linking users to workstations, i.e., each computer (desktop or notebook) will b..
Nestl reports beginning raw materials inventory : 1.Nestl  reports beginning raw materials inventory of 3,243 and ending raw materials inventory of 3,904 (both numbers in millions of Swiss francs).
Brave new world warns of the dangers : Brave New World warns of the dangers of giving the state control over new and powerful technologies. One illustration of this theme is the rigid control of reproduction through technological and medical intervention, including the surgical removal ..
Current assets for two different companies : Current assets for two different companies at calendar year end 2013 are listed here. One is a manufacturer, Salomon Skis Mfg., and the other, Sun Fresh Foods, is a grocery distribution company.
Assess the production process for the ram light assembly : Assess the production process for the Ram light assembly. How efficient is it? Develop a process map for this operation. Where are the largest opportunities to reduce waste and associated costs?
Create the employee salaries worksheet : Worksheet 1 - Employee Salaries - You will create the Employee Salaries worksheet with the following columns
Examination of theme through imagery : The process is one that works well for most undergraduate courses in English literature. The emphasis will be placed on an examination of theme through imagery.
Reading for analysis and the steps : There are no short cuts, but this guide will help you think about reading for analysis and the steps involved in the process. Most short fiction is less than 20 pages and can be read, according to Edgar Allen Poe, in one sitting.
Prepare a process flow diagram of the given business : Murphy's Bagel Shops (MBS) is a chain of bagel eateries supported by a central bakery. Prepare a process flow diagram of the above business. Indicate the operations in which value is being added.

Reviews

Write a Review

Operation Management Questions & Answers

  Compare and contrast large-scale change techniques

Compare and contrast large-scale change techniques with the traditional guiding coalition approach. What are the strengths and weaknesses of each?

  Initial steps be to start planning for these changes

Be sure to use the textbook and other credible outside resources to substantiate your responses: Jennifer, the owner and manager of a company with ten employees, has hired you to take over the HRM function so she can focus on other areas of her busin..

  Organisational behaviour-definition of leadership

What is your original definition of leadership? What kind of leader are you? Your answer should be original and not adopted from any source.

  Significant difficulty in ensuring safety and security

Technology, including travel-driven technology, has made the world smaller. It has enabled the rapid exchange of ideas and information, further shrinking the world. This has also led to more porous borders with significant difficulty in ensuring safe..

  What are the implications for business system

What are the implications for the business system in countries that permit this to occur? What happens to the business and society relationship?

  Documents will project manager need for closure of project

A project manager has just reached the end of a project. Which of the following documents will the project manager need for closure of the project?

  Describe the strategic role competitive product and spatial

as a supply chain manager you have been asked by senior management to write a memo outlining supply chain logistics

  Finding any healthcare organization

finding any healthcare organization, select a process management such as hospital admissions process, order fulfillment process, claims process, school admissions process, hiring process, capital procurement process or any work process in an existing..

  Integration of activities that procure materials

Supply chain management is the integration of activities that procure materials and services, transform them into intermediate goods and final products, and deliver them to customers.

  Apply the best organizational development method skills the

your employer has been going through many challenges this past eighteen months due to the recent financial crises.

  How can the project baseline and earned value approach

How can the project baseline and the earned value approach for variance analysis be used to monitor and report project progress?

  How is a mission statement of a for-profit organization

How is a mission statement of a for-profit organization different than that of a nonprofit mission statement? Give 3 examples of each by doing an Internet Search. Critique each statement it detail. Rewrite at least one of the statements and explai..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd