Analyze the various activities required for the project

Assignment Help Computer Engineering
Reference no: EM132231748

Assignment: Planning a Software Development Project

This assignment consists of two (2) sections: a written project plan, and a project plan that is created through the use of MS Project. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Imagine that you have been hired as a project manager assisting in the development of a mobile application and cloud-based solution which is designed to streamline your organization's delivery operation. As project manager, you are to manage the development and release of the mobile client platform in the cloud-based infrastructure that will use GPS tracking to track the shipment and delivery of goods in trucks across the United States.The mobile client will have three (3) modules consisting of a search customer screen, search address screen, and confirm delivery screen. Programmers have reviewed the requirements and estimate that each module will take 200 hours to complete by one (1) programmer.In addition to delivering the mobile-based application, your project will require upgrading the internal network and application infrastructure to a cloud-based model to support the new mobile platform. This effort will require your team to procure network appliances to optimize the security factors of the cloud-based platform. One last component of the project scope is to provide training to operation support staff and fifty (50) truck drivers staffed across four (4) regions of the U.S. Your project team consists of two (2) programmers, a technical writer, four (4) technical trainers, two (2) network engineers, and one (1) system administrator.

Section 1: Written Project Plan Write a three to four (3-4) page paper in which you:

1. Determine the factors that must be considered and observed throughout the WBS development process and explain why.

2. Create a WBS for the scope of the project. Note: The WBS must be in indented format as shown in Figure 5.5B in Chapter 5 of the text.

3. Analyze the various activities required for this project and provide an estimate of duration for each activity based on the number of resources available for the project. Include assumptions and basis for each estimate.

4. Recommend the estimation technique that should be used for each activity (i.e., PERT, Delphi, Analogy, Expert Judgment, or Rule of Thumb).

5. Determine the major milestones that the project will encounter.

6. Describe the logical sequence of planned activities required to achieve the project and analyze how monitoring durations on the critical path influence the success of the project.

Section 1 of your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Section 2: Project Plan Use Microsoft Project to:

1. Document all resources that would be required for this project within the Resource Sheet form within the software.

2. List all the activities required for the project. Break down the activities by the major milestones.

3. Enter the estimate of required durations, dependencies, and assign resources for each activity.

4. Generate a Gantt chart that shows all of the project deliverables, from beginning to end.

The specific course learning outcomes associated with this assignment are:

• Explain the planning process for software projects.

• Develop a software project plan based on IEEE 1058 to solve a business problem.

• Compare the planning techniques in software projects.

• Explain and prepare project estimation plans.

• Use technology and information resources to research issues in IT Project Leadership Strategies.

• Write clearly and concisely about topics related to IT Project Leadership Strategies using proper writing mechanics and technical style conventions.

Reference no: EM132231748

Questions Cloud

What steps can be taken to mitigate the risks : Describe what IoT is; what are some of the security risks and issues with IoT devices; what steps can be taken to mitigate these risks?
Define relationship between users and roles in databases : Discuss, in your own words using 500 words or more, the relationship between users and roles in databases. Explain why we use roles rather than simply assigning
Analyze how earned value may be used : Analyze how earned value may be used to determine if a project is on time or within budget. Provide a real-world example, including the formula calculations.
Describe how you may use the project control panel : Describe how you may use the project control panel to communicate with different project stakeholders. Include an example to support your response.
Analyze the various activities required for the project : CIS554Analyze the various activities required for this project and provide an estimate of duration for each activity based on the number of resources available.
Determining the competitive value of information technology : Identify three factors to consider in determining the competitive value of information technology. Justify the selected factors.
Situation analysis report : Situation Analysis Report you will now proceed to a Final Strategic Recommendation for your chosen company in which you will be required to detail
How social media provides a competitive advantage : Analyze how social media provides a competitive advantage for an organization's Web strategy, given that many companies have started hiring personnel to handle.
Identify notable mexican american : Identify a notable Mexican American (Cesar Chavez) in your field of study and provide a summary of the individual's contributions to the field

Reviews

Write a Review

Computer Engineering Questions & Answers

  Provide an application to calculate overdue charges

Your city library has hired you on a consulting basis to provide them with an application to calculate overdue charges.

  Create a dynamic nxn matrix for n passed as a parameter

Write a C++ program that uses class Matrix for dealing with the square matrices (n x n tables of integers)

  Write a simple run-length encoder program

Write a simple run-length encoder program in C++: you will read a sequence of pairs containing a character and a number.

  Write a css rule that places a background image halfway

Write a CSS rule that places a background image halfway down the page, tiling it horizontally.

  List the desired characteristics of a compiler

Show that an n-cube has the same topology as an n x n array with toroidal edge connections.

  How many methods does the j progress bar component have

How many methods does the J Progress Bar component have? Be sure to count inherited methods. Look at the Java documentation.

  Write a constructor for a deck class that create pinochle

Write a constructor (you choose the signature) for a Deck class that creates a 48 card Pinochle deck.

  Show the current selections made by the user

construct a program that demonstrates the enhanced options for the MessageBox class. Use three GroupBox controls with RadioButton controls contained within each.

  How current trends will influence software development

Throughout this course, you have evaluated two core SDLCs that are most commonly applied within current organizations to manage systems development projects.

  Estimate the surface temperature of the cable

Thermal energy generated by the electrical resistance of a 5-mm-diameter and 4-m-long bare cable is dissipated to the surrounding air at 20°C.

  How many concurrent channels are allowed

What kind of multiplexing is used with these radios? How many concurrent channels are allowed? Is there a technology newer than family radio service?

  Write a java program that inputs a price as a floating-point

To assign a double value to an int variable, you need to convince the Java compiler to trust you by explicit typecasting.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd