An aggressive alternative for aggregate planning

Assignment Help Operation Management
Reference no: EM13493138

1. Which one of the following is an aggressive alternative for aggregate
planning?


a. use seasonal inventories to buffer the manufacturing process from
variations in customer demand.
b. offer complementary products or services with contra-cyclical demand
requirements.
c. use overtime and undertime to change workforce levels.
d. use subcontracting to overcome short-term capacity shortages.



2. Which of the following factors is (are) NOT included in ordering cost ?


a. bill paying.
b. obsolescence.
c. purchasing department overhead costs.
d. inspecting incoming inventory.
e. development and authorization of purchase orders.



3. Possible decision variables that should be considered for aggregate plans
include:


a. equipment rental.
b. extra labor shifts.
c. backordering.
d. all of the above.
e. none of the above.

-2-


4. Regarding the master production schedule (MPS) :

a. the external suppliers are sent copies of the MPSs in advance.
b. the time horizon of the MPSs must equal the time horizon of the
selected aggregate plan.
c. the capacity requirements of the MPSs must equal or exceed the available capacity of the selected aggregate plan.
d. all of the above.
e. none of the above.


5. Which of the following statements regarding the economic order quantity
( EOQ ) is true?

f. if materials handling costs were to drop, the inventory carry cost per unit of an item would decrease and the EOQ would also decrease.
g. the EOQ model assumes a variable demand pattern.
h. the EOQ model combines several different item orders to the same supplier.
i. if an order quantity is larger than the EOQ, the annual holding (carry)
cost for inventory exceeds the annual ordering cost.


6. In the basic EOQ model, if lead time increases from 3 to 6 days, the EOQ
will:

a. double.
b. increase, but not double.
c. remain the same.
d. decrease by a factor of '2'.


7. Consider a piecemeal replenishment situation where the production rate is
100 units per day, the demand (consumption) rate is 4 units per day, and the
economic production lot size is 500 units. Which of the following statements
is true?

a. the average inventory per cycle is 250 units.
b. the average inventory per cycle is greater than 250 units.
c. the rate of buildup in inventory during the production cycle is
less than 100 units per day.
d. the rate of buildup in inventory during the production cycle is greater
than, or equal to 400 units per day.
-3-


8. An item experiences an annual demand of 7,200 units. It costs $8.00 to hold
the item in inventory for one year and $16.00 to place an order. If the EOQ
model is used, what is the time between orders?

a. less than 1 week.
b. greater than 1 week but <= 2 weeks.
c. greater than 2 weeks but <= 3 weeks.
d. greater than 3 weeks.

9. Annual demand for a product is 1,600 units, and the holding cost is $2.00 per
unit per year. The cost of setting up the production line is $25.00 . There are
200 working days per year. The production manager decided to produce 200
units each time she started production. If it takes her 4 days to produce the
200 units, what was her production rate?

a. 80 units per day.
b. 60 units per day.
c. 50 units per day.
d. 100 units per day.
e. 40 units per day.


10. Judith Thompson is the manager of the student center cafeteria. She orders
frozen pizzas and bakes them on the premises. She anticipates a weekly
demand of ten (10) pizzas. The cafeteria is open 45 weeks a year, 5 days a
week. The ordering cost is $15.00 and the holding cost is $0.40 per pizza per
year. What is the optimal number of pizzas Judith should order?

a. 184
b. 9
c. 5
d. 28
e. none of the above.

11. Given the data in the previous question, the pizza vendor has a four (4) day
leadtime, and Judith wants to maintain 1 pizza for safety stock. What is the
least cost reorder point ?

a. 10
b. 8
c. 4
d. 9
e. none of the above.
-4-


12. The annual demand for a product is 1,000 units. The company orders 200 units
each time an order is placed. The leadtime is six (6) days. There are 250 work-
ing days per year. If the reorder point is 50 units, what safety stock are they
using ?

a. 22
b. 4
c. 26
d. 28
e. none of the above.


13. A manager is using the normal distribution to determine the safety stock for a
product. The z-value of 2.33 would be associated with what service level ?

a. 95%
b. 97.5%
c. 98%
d. 99%
e. none of the above.


TRUE or FALSE: ( select the one correct response )


14. Average inventory per cycle equals average inventory per year.

TRUE FALSE

15. If lead time is zero, the reorder point ( ROP ) equals the optimal number of
backorders.

TRUE FALSE

. 16. When using ABC analysis, class C items should be reviewed frequently.

TRUE FALSE

17. An inventory chase strategy matches demand during the aggregate plan-
ning horizon by varying either the workforce level or the production rate.

TRUE FALSE

18. The aggregate plan will specify the number and type of goods and services
to be produced on a daily and weekly basis, as consumer demand and eco-
nomic conditions change.

TRUE FALSE

19. Production rate change costs follow a non-linear pattern.

TRUE FALSE

20. Aggregate plans should be developed to minimize costs in each period.

TRUE FALSE

21. Each aggregate plan should specify, as a minimum, a level of inventory,
labor force, and subcontracting.

TRUE FALSE
-2-


22. Normally, property taxes are a non-relevant cost.

TRUE FALSE

23. Today, the definition of the quasi-unit is usually determined at the corporate
level.

TRUE FALSE

24. The graph or chart method of aggregate planning guarantees an optimal
minimum cost solution.

TRUE FALSE

25. If desired, a planner can eliminate inventory stockouts in one or all
generated aggregate plans.

TRUE FALSE

26. The lowest cost aggregate plan is usually generated by a chase strategy.

TRUE FALSE

27. It is assumed today that the demand for goods and services is unalterable in
aggregate planning.

TRUE FALSE

28. Good practice dictates postponement of production overtime until all
inventories have been exhausted in the aggregate plan.

TRUE FALSE

29. The linear decision rule is a computer model that uses a search procedure
to look for the minimum cost combination of values for labor force size
and production rate.

TRUE FALSE

30. Normally, subcontracting costs are a 'relevant cost' in aggregate planning.

TRUE FALSE

-3-


31. Corporate policies can be embedded into aggregate plans at any time
during their development.

TRUE FALSE

32. Each of the 3 pure or principal aggregate planning strategies and their
variations require very different amounts and forms of cost data.

TRUE FALSE

33. When an aggregate planning problem is viewed as one of allocating
capacity to meet forecasted demand, it can be formulated in a linear
programming format.

TRUE FALSE

34. 'Service level' is the chance, measured in percent, that there will be
a stockout.

TRUE FALSE

35. Safety stock is ignored when computing the reorder point under
variable demand.

TRUE FALSE

Reference no: EM13493138

Questions Cloud

Find the balls final speed : A 120 g ball moving at 0.45m/s in the +x-direction is subject to a 0.15 N force in the -y-direction for 3.0 s. Find the ball's final speed
American international automotive industries : American International Automotive Industries
Calculate the allowed wave functions : A particle is moving in a simple harmonic oscillator potential U(x)=(1/2)kx^2, Calculate the allowed wave functions and corresponding energies
What distance has the log moved by time ernie reaches burt : Two friends, Burt and Ernie, are standing at opposite ends of a uniform log that is floating in a lake. The log is 3.2m long and has mass 290kg. what distance has the log moved by the time Ernie reaches Burt
An aggressive alternative for aggregate planning : Which one of the following is an aggressive alternative for aggregate planning?
Analyze how one part affects the whole media production : Explain how the production you chose fits into its genre and analyze how the camera's use for instance) affects the overall production
What is the displacement of the squirrell : There is a tree in the middle of your front yard and you take pictures of a squirrell as it runs around the tree. What is the displacement of the squirrell between the rst and second pictures
How the government will ultimately assess : Predict from a capture theory perspective the types of constituents that will benefit in the long run from any social and environmental disclosure legislation.
Calculate the resulting wave of a superposition : Calculate the resulting wave of a superposition of 600 MHz and 600.006 MHz (10 ppm of from 600 MHz carrier frequency

Reviews

Write a Review

Operation Management Questions & Answers

  Identify a u.s. company that operates in a foreign country

Identify a U.S. company that operates in a foreign country whose assets were confiscated. Explain why they were confiscated and any remedy that they sought to get them back.

  Determine route to maximize utility

In the past few years, the traffic problems in Lynn McKell's hometown have gotten worse. Now, Broad Street is congested about half the time. The normal travel time to work for Lynn is only 15 minutes when Broad Street is used and there is no congesti..

  A study if customer arrivals during the windows busy

A study if customer arrivals during the windows busy period revealed that on an average, 20 customers arrive every hour, following a Poisson distribution

  A local distributor for a national tire company expects

a local distributor for a national tire company expects to sell 9600 radial tires of a certain size and tread design next year

  What types of information might be obtained

after several years of existence, has decided to institute a formal product development department. Where should this deparment look first for product problems

  You have been asked to analyze the bids

You have been asked to analyze the bids for 200 polished disks used in solar panels. These bids have been submitted by three suppliers: Thailand Polishing, India Shine, and Sacramento Glow.

  Which of these behaviors is considered the most effective

Which of these behaviors is considered the most effective leadership style?

  What is the essence of the global challenge facing

What is the essence of the global challenge facing American firms? Describe how the challenge is different for companies headquartered

  Research examine and defend why it is necessary for an

research analyze and defend why it is essential for an organization to have a positive corporate culture. in addition

  What should serve as the foundation for diversity

The definition of diversity rests on a valuation of differences across different groups. Explain why valuing (the process) is what should serve as the foundation for diversity and not the results.

  Assess the strategy underlying the changing model

Assess the strategy underlying the changing model of self-assessment used by Unilever HPCE over the six-year period of the case study and evaluate its success in terms of bringing about real improvements.?

  Explain the economic production

The economic production quantity is 500 units (units are delivered to the user department as they come off the production line). If the firm decides to buy this item from an outside supplier rather than producing it, the economic purchase quantity..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd