A company has just negotiated a contract

Assignment Help Operation Management
Reference no: EM13922870

A company has just negotiated a contract to produce a part for another firm. In the process of manufacturing the part, the inside diameter of successive parts becomes smaller and smaller as the cut ting tool wears. However, the specs are so wide relative to machine capabilities that it is possible to set the diameter initially at a large value and let the process run for a while before replacing the cutting tool. The inside diameter decreases at an average rate of .001 cm per part, and the process has a standard deviation of .05 cm.
The variability is approximately normal. Assuming a three sigma buffer at each end, how frequently must the tool be replaced if the process specs are 3 cm and 3.5 cm?

Reference no: EM13922870

Questions Cloud

What would three-sigma control limits for the process be : What would three-sigma control limits for the process be? What alpha risk would they provide? What alpha risk would control limits of 4.14 and 4.86 provide?
What can you conclude about the data : Two additional observations have been taken. The first resulted in three defects, and the second had four defects. Using the set of 20 observations, perform run tests on the data. What can you conclude about the data?
How many units would this save in terms of the scrap : If the scrap rate for each step could be cut in half, how many units would this save in terms of the scrap allowance? If the scrap represents a cost of $ 10 per unit, how much is it costing the company per day for the original scrap rate?
Does it appear that the specs are being met : Suppose the process specs are 9.65 and 10.35 minutes. Based on the data given, does it appear that the specs are being met? If not, what should one look for?
A company has just negotiated a contract : A company has just negotiated a contract to produce a part for another firm. In the process of manufacturing the part, the inside diameter of successive parts becomes smaller and smaller as the cut ting tool wears
Use both types of run tests to analyze the daily : Use both types of run tests to analyze the daily expense voucher listed. Assume a median of $ 31.
Analyze the data in the problems listed : Analyze the data in the problems listed below using median and up/ down run tests with z = ± 2. a. Given the following run test results of process output, what do the results of the run tests suggest about the process?
Analyze the data using both median : For each of the accompanying control charts, analyze the data using both median and up/ down run tests with z = ± 1.96 limits. Are nonrandom variations present? Assume the centerline is the long termmedian.
The time needed for checking in at a hotel : The time needed for checking in at a hotel is to be investigated. Historically, the process has had a standard deviation equal to .146. The means of 39 samples of n = 14are

Reviews

Write a Review

Operation Management Questions & Answers

  Importance of identifying norms within a team

Discuss the importance of identifying norms within a team? Why is clear communication considered an essential element during team development? Provide an example when you were a team member and the lack of communication caused significant problems..

  Explain organizations are susceptible to an array of crises

Organizations are susceptible to an array of crises. There are different types of threats with no "one way" to manage them. This reality presents multiple business challenges to those in leadership positions.

  How do the elements of the marketing mix align

How do the elements of the marketing mix align with the four strategy categories in the left-hand column? Does every one of the 4 P's contribute to each of the strategic objectives established in the left-hand column?

  Formulate a linear programming model for this problem

Grafton Metalworks Company produces metal alloys from six different ores it mines. The company has an order from a customer to produce an alloy that contains four metals according to the following specifications:  Formulate a linear programming mod..

  Relationship between organizational structure and controls

The business firm is no longer just a place where people come to work. For most of the employees, the firm confers on them that sense of belonging and identity-the firm has become their "village", their community.

  Importance of innovation to the success of individuals

Describe the relationship between technical/traditional problem solving and creative/intuitive problem solving. Explain the importance of innovation to the success of individuals, organizational leaders, organizations, and nations.

  Feedback about the company on-boarding process

explanation for each question in case the response was negative, about how I would fix the issue raised. Can anyone help?

  Most profitable number of each model of robot

The Lifang Wu Corporation manufactures two models of industrial robots, the Alpha 1 and the Beta 2. The firm employs 5 technicians, working 160 hours each per month, on its assembly line. Management insists that full employment ( that is, all 160 hou..

  What are the various forms of diplomacy

What are the various forms of diplomacy and would any of these have been applicable to use in response to 9/11? Why or why not? How did the U.S. use of military power post 9/11 influence policy at home and status as a world leader abroad? Do you beli..

  Illustrate what is the inventory cycle time

Compute the annual carrying cost utilizing your order size derived from above. Illustrate what is the inventory cycle time.

  Order and receiving the shipment of flour bags

A large bakery buys flour in 25 kg. The bakery uses an average 4,860 bags a year. Preparing an order and receiving the shipment of flour bags involves a cost of $10 per order. Annual holding cost is $5 per flour bag.

  Lean production enables better processes

The jidoka principle in lean production enables better processes through...

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd