1 demonstrate knowledge and understanding of the key

Assignment Help Other Engineering
Reference no: EM13370200 , Length: 1000 word

1. Demonstrate knowledge and understanding of the key engineering principles that underpin current geotechnical and environmental engineering together with potential future developments

- Apply engineering principles to solve geotechnical and hydraulic engineering problems

- Recognise the important role geotechnical/hydraulic engineering has in the wider global context of sustainable development with consideration of environmental, social and risk issues

- Use creativity to solve geotechnical and environmental engineering problems

- Design and adapt civil engineering solutions that are fit for purpose whilst recognising the importance of sustainability and environmental risk issues

- Adapt to changing technology and techniques

- Prepare and present proficient written technical reports

The main Nottingham-Derby railway line was subjected to severe flooding during the winter of 2012. As such, an embankment is proposed to be built along one side of the line. In order to accommodate the predicted 1 in 200yr flood an embankment of 3.5m is required. The railway line runs at an average elevation of 22.04m AOD, between Nottingham and Derby there is an overall 0.94m total elevation change along its length.

A 2.6m wide pavement is to be constructed along the top of the embankment to promote cyclists and walkers to the area. The pavement will be suitable for light traffic to assist with future maintenance requirements. As such the embankment will be subjected to an imposed load of 650kN along its entire length.

For one 5m length of the railway, there is insufficient room to construct the required embankment and thus a concrete retaining wall has been proposed for this section (Figure 1). The current design suggests the wall will need to be laid to a depth of 1.4m below ground level, be 800mm deep with a 1600mm*400mm toe and maintain the same height of the embankment. It can be assumed that there is no pavement provided along this section.

1698_Solve geotechnical and hydraulic engineering problems.png

Following a desk study an initial ground investigation has estimated the existing soil conditions to be as follows. Due to financial and time constraints only one location was investigated.

2126_Solve geotechnical and hydraulic engineering problems1.png

2. Output Requirements

You work for a geotechnical consultancy and have been tasked to produce a 1000 word (max) report advising a client on the geotechnical issues relating to a proposed flood defence. You will need to advise the client on the geotechnical issues relating to the embankment and retaining wall design. This may include and is not limited to:

Settlement of the embankment

The overturning and sliding forces acting on the retaining wall.

Your report should discuss the feasibility of the proposed embankment and retaining wall, including any recommendations for alteration to the design or for further investigation.

Your report should be a stand alone document with all calculations included in the appendix for reference only. A thorough review of the calculations should not be necessary to understand how the design has been progressed.

Reference no: EM13370200

Questions Cloud

Part two selected moral issuespractical : part two selected moral issuespractical ethicsnbspnbspnbspnbspnbspnbspi.life suicide murder euthanasia assisted suicide
Taskcreate a database design specification enhanced entity : taskcreate a database design specification enhanced entity relationship diagram eerd and relational data model rdm from
Part i1 given that fx is a pdf for random variable x find a : part i1. given that fx is a p.d.f. for random variable x find a in terms of b.2. find the average of ex in terms of
You make a really solid point in noting that traditional : you make a really solid point in noting that traditional organizations are not able to transform into a lean
1 demonstrate knowledge and understanding of the key : 1. demonstrate knowledge and understanding of the key engineering principles that underpin current geotechnical and
1 your company appointed you as the project manager for a : 1. your company appointed you as the project manager for a new innovative hr project. this project will need a
Question 1antibodies directed against hiv can enhance the : question 1antibodies directed against hiv can enhance the infection by facilitating entry of virus into immune
1 early printings of clrs3 say on pages 546-547 we treat : 1. early printings of clrs3 say on pages 546-547 we treat min and max differently the element stored in min does not
Jane wants to setup a photo shop the cost to rent an office : jane wants to setup a photo shop. the cost to rent an office is 150 per week. the variable cost of making one photo is

Reviews

Write a Review

Other Engineering Questions & Answers

  Environmental issue

CEE 357 Winter 2014. Independent writing assignment. Choose any current environmental issue on which a civil/environmental engineer might reasonably work.

  Describe term public relations research

Describe term Public Relations Research

  Non-linear temperature logging circuit

Design a non-linear temperature logging circuit and specify the technical specification of the resistors, capacitors etc. The components for the circuit: temperature sensor, analogue-to-digital converter, Ethernet or USB port, memory, microcontroller..

  Describe and compare the ventilation systems

State reasons for the popularity of decline mining in modern operations. What factors need to be taken into account in deciding the cut off depth beyond which shaft operations should be used instead of decline access.

  Design and modelling of adsorption chromatography based on

design and modelling of adsorption chromatography based on isotherm dataadsorption systems are most commonly set-up as

  Airline terminal problem by adding agent breaks

Compare the results of this model to those of the model without agent breaks. Use the "Station" and "Route" modules to help you in the animation. Use the "Variable" icon to monitor and identify the metrics requested.

  How facebook is changing our way of communication

How is Facebook changing our way of communication and how has Facebook changed our cultures

  The implementation of an integrated is solution

Design a risk matrix to show the likelihood and the impacts of the risks of the failures of the critical IS What is the role of Business Process Re-engineering in the implementation of an integrated IS solution

  Environmental engineeringquestion 1 although it is rarely

environmental engineeringquestion 1 although it is rarely considered as such sulfur could potentially be a limiting

  Determine the cumulative exposure in wlm

Determine the cumulative exposure in WLM and determine the rate of emanation into the stope - working level of radon daughters at exit due to the initial radon

  Develop a shaft sinking and lining strategy

Ppurpose of the exercise is for students to develop a shaft sinking and lining strategy for the site and

  Describe a tunnel-boring machine in detail

Describe a tunnel-boring machine in detail and cite examples of their use. Particular emphasis should be placed on the cycle of operations for such a machine.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd