Broadly the foundation are classified into open i.e. shallow & deep foundations open as stated are shallow foundation where the soil strata excavated by pick axe, blasting, straight bars etc to required depth which is generally 1 to 2 meter depth. The excavated strata is visible to eyes for inspection directly. In railways x y z types of foundations provided which are open foundation. Raft ,Grillage foundations are also open ones due to direct visible inspection decision can be more correct with out depending on details collected & on ward study of the strata. Although open foundation has easy construction but may not be economical of the depth of hard strata suitable for founding is more than 2 meter.


Related Discussions:- Write short note on open foundation

Evaluate the principal stresses and principal planes, Evaluate the principa...

Evaluate the principal stresses and principal planes: The state of stress at a point in a loaded solid is prescribed on two faces of an element whose shape is a triangular pri

Construction Planning, A contractor has both a 3-cy and a 5-cy shovel in th...

A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day

Centroid, how tofind centroid of cercular arc

how tofind centroid of cercular arc

Concrete, What is compacting factor

What is compacting factor

Maximum shear stress , the propane gas tank has an inner diameter of 1500mm...

the propane gas tank has an inner diameter of 1500mm and wall thickness of 15mm. If the wall is pressurized to 2MPa, determine the absolute maximum shear stress in the wall of tank

Void ratio and dry density of a soil, Q. Define water content, void ratio ...

Q. Define water content, void ratio and dry density of a soil. If wet density of a soil is 1.9 gm per cm at a moisture content of 24%, what will be its dry density?  Ans. - W

Frame, what is imperfect frames ?

what is imperfect frames ?

Define lead lag relationships - construction management, Define Lead Lag Re...

Define Lead Lag Relationships 1. A lead is when the successor task begins before the predecessor task is complete 2. A lag is when a successor task does not

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd