Q. Write briefly for Trolley Permits?

It is the permit given to the Moter Trolley / Push Trolley, Cycle / Moped Trolley. It is essential to have Trolley Permit before taking trolley on a running line. It is issued by DSO or Sr. DEN. It is issued only after taking examination with respect to competency of traffic rules specially signals & protection. Trolley Permit remains valid for a period of one year after expiry of this period. The permit may be renewed after examination.


Related Discussions:- Write briefly for trolley permits

Define the shrinkage limit and shrinkage ratio, The oven-dry weight of a pa...

The oven-dry weight of a pat of clay is 1.17 N and the weight of mercury displaced by it is 0.855 N. suppose the specific gravity of solids as 2.71, verify the shrinkage limit and

Aluminium sliding window detail drawings, what are the details of aluminium...

what are the details of aluminium sections and how are they connected for making a door or window

Function of a separation membrane amid concrete pavement, Question What...

Question What is main function of a separation membrane amid concrete pavement slab and sub-base ? Answer Division membrane between concrete pavement slab and sub-bas

List the significant engineering classification system, How do you distingu...

How do you distinguish among clay and silt in the field? State the purpose of identification and categorization of soils. List any three significant engineering classification syst

Mosaic and p v c tiles, Q. Mosaic and P V C Tiles? The water sink at wa...

Q. Mosaic and P V C Tiles? The water sink at water points may be provided with mosaic lining at other than important station. Mosaic tiles also may be provided in flooring of

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Culverts, Can anyone help me in finding the formula for submerged and unsub...

Can anyone help me in finding the formula for submerged and unsubmerged flow in culverts?

Moment of inertia, i dont know how to calculate moment of inerta

i dont know how to calculate moment of inerta

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd