Evaluation of various reports regarding the effects of earthquake on spatial trusses

Types of damages

According to the different types of damages, wrecked trusses can be divided into three different categories:

1. Damage of the bracings

2. Damage in the connection part between steel and concrete, this type of damage has been noted in the area of connection between the space truss and the supporting wall of pillar.   

3. Damage in different parts of truss: This type of damage has been noted in normal trusses and usually close to the support areas. In some cases, spatial trusses has been buckled or Brocken. However as these structures have unknown static degrees, they do not seem as important.


Classification of the damage according to the type of structures

The level of damage in spatial trusses has also been classified into three different levels based on the type of structure:

One layered spatial structures

Two layered spatial structures



Posted Date: 8/8/2012 3:59:30 AM | Location : United States

Related Discussions:- Wrecked trusses and types of damages, Assignment Help, Ask Question on Wrecked trusses and types of damages, Get Answer, Expert's Help, Wrecked trusses and types of damages Discussions

Write discussion on Wrecked trusses and types of damages
Your posts are moderated
Related Questions
Analysis of presress  In pre-stressed structural elements, stretched tendons are placed inside concrete. The tensile stresses of the tendons are transferred to concrete in the

I need to find support reactions at O for the beam with a distributed load, a 6 kN moment couple at A and a 3 kN axial load as shown in picture.

what is a bolder?

due to defectiveseasoning and conversion

what do u mean by effective span and its derivation?

We need all types of Upper floor

Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?

Q. Can you explain Permeable Spurs? A permeable spur may be constructed by driving two or more rows of bally piles with sufficient penetration below riverbed level to provide a

Determine the total Stopping Sight Distance in feet A motorist is travelling down a 6% grade at 65 mph and needs to stop because of a crash scene.  Assuming a 2.0 sec PRT and 1