Turn off time - thyristor, Electrical Engineering

Turn off Time

This is also known  as gate controlled  turn on  time. The time  interval between  a specified  point at the beginning  of the  gate pulse  and the  instant when  the device  voltage  has dropped  to a specified low value  during  the switching  of an SCR from the  off state  to the on  state  by a gate pulse.

 

Posted Date: 4/2/2013 8:05:44 AM | Location : United States







Related Discussions:- Turn off time - thyristor, Assignment Help, Ask Question on Turn off time - thyristor, Get Answer, Expert's Help, Turn off time - thyristor Discussions

Write discussion on Turn off time - thyristor
Your posts are moderated
Related Questions
Q. Common-Emitter Configuration? The emitter part of a circuit being common to both the input and the output portions, Figure (a) illustrates a common-emitter (CE) BJT amplifie

Explain different stage in energy audit?

Q. Do the following operations with 8 bit bytes, and indicate the condition of the overflow and carry bits. a) 10111011 + 00000011 b) 11101101 + 11111001 c) 11011011 + 110

Draw layout of hydro-electric power plant and illustrate it briefly. Explain the following: a. Types of power plants b. Selection of power Plants

Q. A four-pole dc generator is lap wound with 326 armature conductors. It runs at 650 r/min on full load, with an induced voltage of 252 V. If the bore of themachine is 42 cmin dia

Q. Describe binary number system? The binary number system has a base of 2 with two distinct digits (bits), 1 and 0. A binary number is expressed as a string of 0s and 1s, and

An industrial plant consumes 500 kWat a lagging power factor of 0.6. (a) Find the required kVA rating of a synchronous capacitor to improve the power factor to 0.9. (b) If a

Memory location 2000H has the word 5000H stored in it. What does each location contain after DEC WORD PTR [2000H].

Explain the discovery of neutron. Mention its properties. Discovery of Neutron: The existence of neutron was first predicted by Rutherford in the year 1920. But it was discov

Phantom or Fictitious Loading Method While the capacity of meters under test is extremely high, testing with actual load method would includes a considerable loss of power and