Track Renewal:

Need for Track Renewal

Normal maintenance is able to keep up the track standards only to a limited extent. The track gets overaged or the speeds and traffic volume increase. Permanent damage is caused to the track which cannot be restored by normal maintenance. Full renewal of the track then becomes necessary.

Execution of Track Renewal

Track Renewal requires careful planning because the traffic movement cannot be stopped. The brief interval between successive train movements is utilized. The required quantity of ballast is collected in advance. The new track is assembled on sleepers by the side of the existing track or brought to site in wagon and after removal of the existing track, the new track is laid. The work is done manually or with the help of cranes.

Posted Date: 1/23/2013 1:24:57 AM | Location : United States







Related Discussions:- Track renewal, Assignment Help, Ask Question on Track renewal, Get Answer, Expert's Help, Track renewal Discussions

Write discussion on Track renewal
Your posts are moderated
Related Questions

The figure shows a "square cavity flow". In this flow the cavity is filled with a fluid and the lid of the cavity moves with a constant velocity, while the other walls remain stati

what is the working princile of high preesure die casting process


A 4- pole DC motor is known to have an armature resistance of 0.5 Ω, and is operated as a separately excited motor. (a)  When the motor is connected to a 250V DC supply with no

Frictional force acting on the ladder: A uniform ladder having length 13m and weighing 250N is placed against smooth vertical wall with its lower end 5m from wall. The coeffi

(Rigid body acceleration) A tank of water accelerates down an icy frictionless ramp of angle . What angle ( ) does the water make with the horizontal at equilibrium?

Camshaft : The camshaft controls the opening and closing of the two valves. The associated parts are push rods, rocker arms and valve springs. The camshaft is driven by a camchai

Reassembly Position of Critical Parts:  Care should be taken to note the position of the unidirectional parts while dismantling the engine. This will ensure dimensions (depth, dis

STORAGE & QUALITY OF CO 2 GAS CO 2 gas is supplied in cylinders at a  high pressure (140 kg / cm 2 ). When the cylinder is full, nearly 90 % of the volume is filled with CO 2