level instrument dumpy level, Civil Engineering

how can operate the dumpy level machine
Posted Date: 3/19/2013 7:52:27 AM | Location : Pakistan







Related Discussions:- level instrument dumpy level, Assignment Help, Ask Question on level instrument dumpy level, Get Answer, Expert's Help, level instrument dumpy level Discussions

Write discussion on level instrument dumpy level
Your posts are moderated
Related Questions
Interface between base plates and footings Surface of footings is generally quite rough so that some levelling has to be carried out for base plates. Interface between base pl

With a clear sketch indicate the system of protection of line for works of short duration where ‘ Stop dead restriction' need to be observed on a single line section on a BG track.



The local survey crew measures a distance of 1,135 ft of new drainage pipe that is required for the new road construction. The beginning point for the drainage is located at statio


Question For drained reclamation, what will significance of smear zone bring by installation of band drains ? Answer Throughout installation of band drains, smear zon

In addition to its own weight, the beam in Figure is to carry a uniformly distributed live load of 12 kN/m. Figure 1 also shows the cross-sectional details of the beam. Design a

Evaluation of various reports regarding the effects of earthquake on spatial trusses History and static In this section we aim to provide a summary report of what was happ

Define Cleaning for Underwater Inspection of Bridge? Before any structure can be inspected, it is necessary to expose the surface material of the structure. Wherever there is m