Scope of job design - process design, Operation Management

Scope of Job Design - Process Design

When designing any job, three requirements must be met simultaneously: technical feasibility, economic feasibility and behavioural feasibility, as represented in this figure (adapted from Dilworth, 1996). 

2221_Scope of Job Design – Process Design.png

Technical feasibility 

The process must be capable of transforming its inputs into the required outputs in a dependable manner, and the job must not exceed the limits of the person's skills, or mental and physical endurance.

Posted Date: 3/16/2013 3:36:34 AM | Location : United States







Related Discussions:- Scope of job design - process design, Assignment Help, Ask Question on Scope of job design - process design, Get Answer, Expert's Help, Scope of job design - process design Discussions

Write discussion on Scope of job design - process design
Your posts are moderated
Related Questions
Medical studies have shown that 10 out of 100 adults have heart disease. When a person with heart disease is given an EKG test, a 0.9 probability exists that the test will be posit

What factors influence the choice of evaluation design? Which of these factors would have the greatest influence on your choice of an evaluation design? Which would have the smalle

Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

scope of operation research

A (n) ____ gives the relative importance of each pair of operations or departments being located close together.

A famous New York City hotel, Hotel Lux, is noted for its food as well as its luxury accommodations. Hotel Lux contracts with a famous chef, Chef Perlee, to become its head chef at

You just took a $20,000, eight-year loan. Payments at the end of each year are flat (equal in every year) at an interest rate of 8 percent. Calculate the appropriate loan table, sh

Last year, the manager of the service department at East Woods Ford instituted a customer opinion program to find out how to improve service. One week after service on a vehicle wa

What is the difference between using an exact optimization technique and a heuristic to solve a problem?

What do you understand by line balancing? what happens if balance doesn''t exists?