Schedule selection-generation of continuation, Mechanical Engineering

Schedule Selection

Of the p excellent continuations, q (first) operations are scheduled. This offers p latest partial schedules. After that step 1 is repeated.

These steps' details are detailed in the subsequent discussion as:

Generation of Continuation

This is crucial to employs a strategy that makes sure that in one continuation step operations are scheduled on each or in any case most machines. Or else, the evaluation of the optional schedules becomes very complicated. The algorithm proceeds as given below:

  • From the partial schedule, there are at main N operations that can be begun. All operations are allocated the station where this would have the initial possible beginning time (we suppose that if there are various stations for this operation, this effectiveness is identical, or else the initial possible completion time has to be calculated).
  • The resulting set of potential operations on station m, S (m) is decreased via discarding those operations that would cause an idling period of more than D time units whether they are the subsequent operation on this machine, and ordered as per to a priority rule. The s prime candidates in S (m) are after that considered additionally that shown by S ′ (m).
  • The machine m* is computed that has the initial possible starting time of the next operation amongst all the machines. One operation is selected from S′ (m), and its completion time te (m*) is calculated.
  • For all other machines, the set S″(m) is computed that contains all potential operations from S′(m) that can be begun before te(m*). From all these sets, one operation is scheduled.

This procedure permits the construction of many continuations of length L, Computer Algorithm for On-line Scheduling for Automated Manufacturing Systems

 1 ≤ L ≤ M, till all operations in S′ (m*) are utilized as early operations and all combination of operations in the sets S″(m*) for this initial operation has been produced. This process is iterated till all generated continuations have a specific length.

 

Posted Date: 3/5/2013 8:10:49 AM | Location : United States







Related Discussions:- Schedule selection-generation of continuation, Assignment Help, Ask Question on Schedule selection-generation of continuation, Get Answer, Expert's Help, Schedule selection-generation of continuation Discussions

Write discussion on Schedule selection-generation of continuation
Your posts are moderated
Related Questions
Consider fully developed laminar flow with constant properties in a circular tube. Let there be heat transfered  to or from  the fluid at a constant rate per unit of tube length.Ad

Metals and Melting Practices - Alloy,Blowing,Carbon Monoxide Normal 0 false false false EN-IN X-NONE X-NONE Microsoft

What is the difference between hot and cold working

VISUAL REALISM: Hidden line and surface removal eliminates the ambiguities of the displays of three-dimensional models and is considered the first step toward visual realism.

Describe the following terms:- a) Shear force and bending moment b) Concentrated load, Uniformly varying load and Uniformly distributed load c) Beam & Types of beam. d)

Q. Show the Coating Application? Immediately following surface preparation, the cleaned pipe shall be uniformly preheated by a non-contaminating method to the application tempe


Pin-jointed steel structure: Find out the forces in the members of the pin-jointed steel structure. Solution Joint D  Suppose f CD and f DE both as tensile forc

The press tressed bridge structure would look like as shown below,   The following factors influences the decision to select the particular prestressing, 1/Span of br

Stone Slab Culverts with Abutments and Piers: Where good quality stone slabs are available like granite slabs, they can be used for superstructure of culverts, with suitable