Schedule selection-generation of continuation, Mechanical Engineering

Schedule Selection

Of the p excellent continuations, q (first) operations are scheduled. This offers p latest partial schedules. After that step 1 is repeated.

These steps' details are detailed in the subsequent discussion as:

Generation of Continuation

This is crucial to employs a strategy that makes sure that in one continuation step operations are scheduled on each or in any case most machines. Or else, the evaluation of the optional schedules becomes very complicated. The algorithm proceeds as given below:

  • From the partial schedule, there are at main N operations that can be begun. All operations are allocated the station where this would have the initial possible beginning time (we suppose that if there are various stations for this operation, this effectiveness is identical, or else the initial possible completion time has to be calculated).
  • The resulting set of potential operations on station m, S (m) is decreased via discarding those operations that would cause an idling period of more than D time units whether they are the subsequent operation on this machine, and ordered as per to a priority rule. The s prime candidates in S (m) are after that considered additionally that shown by S ′ (m).
  • The machine m* is computed that has the initial possible starting time of the next operation amongst all the machines. One operation is selected from S′ (m), and its completion time te (m*) is calculated.
  • For all other machines, the set S″(m) is computed that contains all potential operations from S′(m) that can be begun before te(m*). From all these sets, one operation is scheduled.

This procedure permits the construction of many continuations of length L, Computer Algorithm for On-line Scheduling for Automated Manufacturing Systems

 1 ≤ L ≤ M, till all operations in S′ (m*) are utilized as early operations and all combination of operations in the sets S″(m*) for this initial operation has been produced. This process is iterated till all generated continuations have a specific length.


Posted Date: 3/5/2013 8:10:49 AM | Location : United States

Related Discussions:- Schedule selection-generation of continuation, Assignment Help, Ask Question on Schedule selection-generation of continuation, Get Answer, Expert's Help, Schedule selection-generation of continuation Discussions

Write discussion on Schedule selection-generation of continuation
Your posts are moderated
Related Questions
Ordinate Dimensions Ordinate dimensions are not really a dimensions at all in that they did not indicate a measurement aur dimensions. Rather they annotate known co-ordinate po

Electrical System: Electrical system consists of a battery, spark plug, lighting system, ignition system, charging system and electricity generator. These components of electrical

A large tower is to be supported by a series of steel wires; it is estimated that the load on each wire will be 13,300 N (3000 lb f ). Determine the minimum required wire diameter,

#question calculate bending force

Prove that energy is a property of system

Calculate the force - pulley: A string is passing over a smooth pulley. The string supports the mass m on one side which is to be pulled up with acceleration a. calculate the

What is the amount of air is supplied to engine via turbochargers and how their sizes vary from engine to engine ?

Road under Special Conditions: Roads passing through difficult terrain and environmental conditions require special attention in design, construction and maintenance. The foll

Describe the modes of failure in bearing capacity. Modes of Failure: Behaviour of foundations subjected to load based on actual observations suggests that the bearing capaci