Road construction, Civil Engineering

how to calculate various quantities of materials for wet mix macadam and dense bitumen macadam
Posted Date: 5/18/2013 1:59:00 AM | Location : USA







Related Discussions:- Road construction, Assignment Help, Ask Question on Road construction, Get Answer, Expert's Help, Road construction Discussions

Write discussion on Road construction
Your posts are moderated
Related Questions
Explain the Bolted Connections a) Questions generally relate to the size of the bolt needed for a connection or b) Number of bolts for a given loading and specified size

Define Role of Diver in Underwater Inspection of Bridge? Diver's role is primarily to point out a potential scour problem. The diver can use one of the following equipment to m

The continuous one-way slab shown below is loaded with a uniform service live load of 80 psf, and a superimposed dead load of 40 psf. Assume the beam width is 16" and use f'c = 5 k

An oven-dried soil weighing 1.89 N is placed in a pyknometer which is then filled with water. The total weight of the pyknometer with water and soil is 15.81 N. The pyknometer fill

Q. Briefly explain about Artificial cut offs? Alignment of a cut off is chosen so that approach and exit ends remain more or less tangential to the river course. A cut off can

Road base vs. base course in flexible carriageway Roadbase is the most significant structural layer in bituminous pavement. It's designed to take up the function of distributi

how to analyse a frame

A 16-pile group has to be arranged in the form of a square in soft clay with uniform spacing. Neglecting end-bearing, verify the optimum value of the spacing of the piles in terms

Explain the Hydraulic Gradient A measurement of the movement of water over distances. Change in hydraulic head from one monitoring point to another.  i = ΔH/L  units are typ

Assignment:-Continuous Prestressed Concrete Beam Design A cast in-place 3-span prestressed concrete T-beam is to be designed. The T-beam concsists of an 8-in thick reinforced