Review of available records - underwater inspection, Civil Engineering

Review of available Records - Preparation for Underwater Inspection?

Before taking up the underwater inspection, a detailed review of drawings and past report should be carried out for

- Types of members in the system

- Types of materials to be encountered

- Type and extent of repairs carried out in past

- Results of last underwater inspection

- Accident or damage caused to the structure Based on the above review, the nature and extent of inspection required should be worked out. If necessary, sketches may be prepared for documentation of inspection items and defects.

Posted Date: 6/12/2013 8:05:11 AM | Location : United States







Related Discussions:- Review of available records - underwater inspection, Assignment Help, Ask Question on Review of available records - underwater inspection, Get Answer, Expert's Help, Review of available records - underwater inspection Discussions

Write discussion on Review of available records - underwater inspection
Your posts are moderated
Related Questions
What are the advantages and disadvantages of lead products in construction? Ans) Disadvantages: -Lead is very toxic; its use can result in pollution of the ground and more signi

isolated footing

Q. Define Hammer efficiency and coefficient of restitution? Hammer efficiency refers to ratio of kinetic energy of hammer to the rated energy (or potential energy). Basically i

location of hydrolic jump

Q. Necessity of air valves in pressurized pipelines? Air valves are broadly categorized into two major types: single air valves and double air valves. Single air valve comprise

Examine the state of stress at the junction of flange: A beam of I-section as shown in Figure (a) is subjected to a bending moment of 84.928 kN m and a shear force of 106.1 kN

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Test for determination of Shear Modulus Conditioning load : Bearings shall be preloaded with maximum horizontal load Htest (with Ntest or vertical load held constant) and un

A certain soil has 99% by weight finer than 1 mm, 80% finer than 0.1 mm, 25% finer than 0.01 mm, 8% finer than 0.001 mm. Draw the grain-size distribution curve and determine the pe

Water Sources and Requirements: In this part, we have discussed: (a) Basic concepts in planning of water supply schemes. (b) Various types of water requirement. (c) S