Reed solomon code, engineering, Other Engineering

i have created simulink model for rs code with overlapped symbol and without overlapped symbol.
and BIT ERROR RATE VERSUS EB/NO PLOT is observed for its performance analysis.but i get same plot for both model.

i have used circular shift but may be it is not working properly.
so please do needful for this.

also i have to do iterative decoding of with overlappped symbol which is explained in paper.
but according to reference paper i cant connect as shown in fig.4 and fig.6 of paper with overlapped symbol.
Posted Date: 2/29/2012 5:48:44 AM | Location : United States







Related Discussions:- Reed solomon code, engineering, Assignment Help, Ask Question on Reed solomon code, engineering, Get Answer, Expert's Help, Reed solomon code, engineering Discussions

Write discussion on Reed solomon code, engineering
Your posts are moderated
Related Questions
OIL PUMPS The oil pumps fitted in a recirculatory system are normally gear-type or Gerotor type pumps. The pumps are usually mounted in a pack containing one pressure pump and

In a CDMA system, the signal is spread over a large bandwidth by multiplying the transmitted symbol by a sequence of short pulses, also called chips. The system bandwidth is thus d

PEME5451/3451 SUSTAINABLE ENERGY PROCESSES Assignment 5: Transport fuels VLE submission deadline is Friday 24th February PART 1: (worth 40%, all parts marked equally) 1. Using the

INVALIDATION OF CERTIFICATE OF AIRWORTHINESS Listed below are the four major reasons why a Certificate of Airworthiness could become invalid. There may be other specific reason

Inspection Checklist: The following checklist is a starting point and it may be added to if subsequent inspections and debriefs indicate that this would be beneficial.   It sh


Who is a more senior creditor, a bondholder or stockholder?  The bondholder is always more mature. Stockholders (including those who own recommended stock) must delay until bond

Corporate Restructuring Corporate restructuring refers to the changes in ownership, business max, assets mix and alliances with a view to enhance the shareholder value. Hence, cor

Various types of Bituminous Course? Explain each

defination of leverage,objectives,enterpritation,analysis,conclusion,references,review of literature.