Purpose of setting minimum amount of longitudinal steel area, Civil Engineering

Assignment Help:

Q. Purpose of setting minimum amount of longitudinal steel areas for columns?

In some design codes it specifies that area of longitudinal steel reinforcement must be not less than a specific percentage of sectional area of column. Initially the limitation of steel ratio for columns helps to guard against potential failure in tension. Tension can be induced in columns during design life of concrete structures. For example tension is induced in columns in case there is uneven settlement of building foundation or upper floors above the column are completely unloaded whereas the floors below column are strictly loaded. Secondly because of the effect of creep and shrinkage, there would be a redistribution of loads between steel and concrete reinforcement. So steel reinforcement can yield easily in case a lower limit of steel area isn't established.

Additionally, test results indicated that columns with too low a steel ratio will render the equation below inapplicable that is used for design of columns:

N=0.67fcuAc+fyAs


Related Discussions:- Purpose of setting minimum amount of longitudinal steel area

Define contaminants - underwater inspection of bridge, Define Contaminants ...

Define Contaminants - underwater inspection of bridge? There are various substances that may be inadvertently incorporated into the concrete matrix (e.g. glass, coal, gypsum),

Harbour, what is entrance channel in harbour?

what is entrance channel in harbour?

Influence Line for shear at Support, I have to draw the IL for the shear at...

I have to draw the IL for the shear at a roller support and am not sure how it should look

Expansion jiont, some expansion joint(10 mm- 20 mm) on my basement roof.rai...

some expansion joint(10 mm- 20 mm) on my basement roof.rain water leakage in basement i want the solution of expiation joint and water leakes.

Planning and scheduling tutorial, Am looking for .planning and scheduling...

Am looking for .planning and scheduling tutorial , cost engineering tutorials

Surveying, length of the line measured with 20m chain found to be 250m.calc...

length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long

Explain the coefficient of permeability, A sand deposit of 12 m thick overl...

A sand deposit of 12 m thick overlies a clay layer. The water table is 3 m below the ground surface. In a field permeability pump-out test, the water is pumped out at a rate of 540

What is oil interceptors, Q. What is Oil interceptors ? Oils and Grease...

Q. What is Oil interceptors ? Oils and Grease are usually found in stormwater runoff from catchments. They come from spillage and leakage of fuels, lubricants, Vehicle coolants

Piers and piles, what is the difference between piers and piles?

what is the difference between piers and piles?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd