optimization , Operation Research

A company uses 4 pounds of resource 1 to make each unit of X1 and 3 pounds of resource 1 to make each unit of X2. There are only 150 pounds of resource 1 available. Which of the following constraints reflects the relationship between X1, X2 and resource 1?
Posted Date: 1/25/2013 6:40:16 PM | Location : United States







Related Discussions:- optimization , Assignment Help, Ask Question on optimization , Get Answer, Expert's Help, optimization Discussions

Write discussion on optimization
Your posts are moderated
Related Questions
Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Profitable Casino Corp. (PCC) is a Harrah's wannabe, intent on mimicking Harrah's analytical marketing techniques.  For example, PCC issues virtually all gamers a PCC "Rewards" car


Sample Assignment for minimum spanning tree problems For the subsequent graph get the minimum spanning tree. The numbers on the branches presents the cost.

a. Explain the method of "Taylor's Scientific Management". List the elements of Taylor's Scientific Management. b. List the necessary managerial functions of a Manager. Explain.

This method is more  systematic and orderly than least cost method. Here penalties for each column and row of the transportation table are determined, and the row  or  column with

source code in c available?

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

For every LP formulation there exists another unique linear programming formulation called the 'Dual' (the original formulation is called the 'Primal'). Same data